Commissioning Report

ABB Switzerland Ltd GMD System


Supplier: ABB Switzerland Ltd Customer:
Dept.: ATBDE
CH-5405 Baden, Switzerland Sociedad Minera Cerro Verde / Perú
ABB-Order-No.: 1-1032937 Project: Primary Sulfide Project
Consultant: Fluor Equipment: BALL MILL 3 / 12 MW

Contract PSP108 TAG Name: C-3320-ML-301M


Number:
P.O. Number: A1WF-65-013-P0

Commissioning/Service Engineer: ............................................…………Dept:………...............


............................................…………Dept:………...............
............................................…………Dept:………...............

Commissioning date/period: …………............................................

Commissioning Report
GMD System
“Part A”
(Cycloconverter & Drive Controller)

Issued: P. Meier 28.09.04 Change: Off. resp.: ATBDE Doc.- Language Format Page No of
type pages
Check. 1: I. Novotny 15.08.05 A Rec. off.: E A4 1 92
Check. 2: B Der. from:
Released: M. Garnier 16.08.05 C Replaces:
Doc.-Nr.: 3BHS 215357
I:\01D\Drives\Projects\PIBD\11032937 Cerro Verde\03 Final Documents\Vol 16 - GMD System Commissioning
Report\3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Table of Contents:

1 General .........................................................................................................................5
1.1 Abbreviations ..................................................................................................................... 6
2 Tools, Documentation and Software..........................................................................7
2.1 Commissioning tools list..................................................................................................... 7
2.2 Documentation................................................................................................................... 8
2.3 Commissioning Software.................................................................................................... 8
3 Visual Inspection .........................................................................................................9
3.1 E-House............................................................................................................................. 9
3.2 Main Circuit Breaker of Stator Cycloconverter Transformer................................................ 9
3.3 Main Circuit Breaker of Rotor Excitation Transformer....................................................... 10
3.4 Cycloconverter Transformer............................................................................................. 11
3.4.1 Transformer for cycloconverter +CA ....................................................................................................... 11
3.4.2 Transformer for cycloconverter +CB........................................................................................................ 12
3.4.3 Transformer for cycloconverter +CC........................................................................................................ 13
3.5 Excitation Converter Transformer..................................................................................... 14
3.6 Synchronisation Transformer ........................................................................................... 15
3.7 Cycloconverter ................................................................................................................. 16
3.8 Excitation Converter......................................................................................................... 16
3.9 Stator Isolating (Knife) Switch .......................................................................................... 17
3.10 Rotor Isolating (Knife) Switch ........................................................................................... 17
3.11 Ring Motor ....................................................................................................................... 18
3.12 Protection Relay............................................................................................................... 19
3.12.1 Main Feeder Protection Relay.................................................................................................................. 19
3.12.2 Rotor Transformer Protection Relay........................................................................................................ 19
3.12.3 Cycloconverter Transformer Protection Relay (Protection Panel)........................................................... 20
3.13 Fire Suppression System ................................................................................................. 21
3.14 Air Conditioning System ................................................................................................... 22
3.15 GMD’s Auxiliary ............................................................................................................... 23
4 Wiring Test .................................................................................................................26
4.1 Single line diagram, power cable wiring ........................................................................... 26
4.1.1 High Voltage cables.................................................................................................................................. 26
Power Part................................................................................................................................. 27
4.1.2 Power Cable of Cycloconverter Circuit ................................................................................................... 27
4.1.3 Power Cable of Excitation Converter Circuit .......................................................................................... 29
4.1.4 Power Cable of MCC (Motor Control Centre)......................................................................................... 30
4.1.5 Power supply 110VDC from substation to protection relay panel........................................................... 35
4.1.6 Tightening Torque Bolt of Cycloconverter Circuit.................................................................................. 36
4.1.7 Tightening Torque Bolt of Excitation Converter Circuit ......................................................................... 38
4.1.8 Tightening Torque Bolt of MCC ............................................................................................................. 39
4.2 Control part ...................................................................................................................... 45
4.2.1 Control signals between PSR control panel (+F02) and cycloconverter main circuit breaker................. 45
4.2.2 Control signals between PSR control panel (+F02) and excitation main circuit breaker......................... 45
4.2.3 Control signals between PSR control panel (+F02) and ring motor ........................................................ 46
4.2.4 Control signals between PSR control panel (+F02) and field emergency stops ...................................... 46
4.2.5 Control signals between PSR control panel (+F02) and mill local control panel (+MLCP).................... 46
4.2.6 Control signals between mill local control panel (+MLCP) and radio control, remote module .............. 47
Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 2
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
4.2.7 Control signals from cycloconverter transformer protection box ............................................................ 47
5 Energise MCC’s & Low Voltage Distribution...........................................................48
5.1 Energise Incoming MCC Supply Voltage (3 Phase). ........................................................ 48
5.2 Energise Lighting and Power Sockets. ............................................................................. 48
5.3 Internal Auxiliary Power Supply 230/240 Volts. (Single Phase) ........................................ 48
5.4 Internal Auxiliary Power Supply 110/120 Volts. (Single Phase) ........................................ 49
5.5 Start up UPS. ................................................................................................................... 49
5.6 Energise Control Voltage in Panels.................................................................................. 50
6 Signal Test..................................................................................................................51
6.1 Cycloconverter Transformers phase U Protection ............................................................ 51
6.2 Cycloconverter Transformers phase V Protection ............................................................ 51
6.3 Cycloconverter Transformers phase W Protection ........................................................... 52
6.4 Air-gap Measurement....................................................................................................... 53
7 Function Tests ...........................................................................................................54
7.1 Check Rotational of Aux. Motor (Motor Cooling Fan, Lubrication and Brake System) ...... 54
7.2 Cycloconverter Cooling Unit (+F15) ................................................................................. 56
7.3 Cycloconverter transformer over current protection.......................................................... 58
7.4 Emergency stop relay (Control Panel +F02)..................................................................... 59
7.5 ON/OFF Main Circuit Breaker Function Test (Stator and Rotor)....................................... 59
7.5.1 Rotor Main Circuit Breaker Function Test .............................................................................................. 59
7.5.2 Stator Main Circuit Breaker Function Test.............................................................................................. 59
7.6 Earth Fault Protection ...................................................................................................... 60
7.6.1 Rotor Protection....................................................................................................................................... 60
7.6.2 Stator Protection ...................................................................................................................................... 61
7.7 Hardware Protections....................................................................................................... 62
8 PSR2 Drive Protection Settings................................................................................64
8.1 General drive requirements:............................................................................................. 64
8.2 Stator and Thyristor Protection Settings ........................................................................... 64
8.3 Excitation Protection Settings........................................................................................... 65
8.4 Network Protection Settings ............................................................................................. 65
8.5 Ring Motor Air gap Protection Settings............................................................................. 66
8.6 Frozen Charged Protection Settings ................................................................................ 66
8.7 Cycloconverter Cooling Protection Settings...................................................................... 67
8.8 Cycloconverter Current Control Phase R-S-T Settings..................................................... 67
8.9 Cycloconverter Speed Control Settings............................................................................ 67
8.10 Cycloconverter Low Speed Control “Phase Correction” Settings...................................... 68
8.11 Cycloconverter Low Speed Control “Amplitude Correction” Settings ................................ 69
8.12 Delta psi-T and Network Voltage >85%<95% Speed Control Limit Function .................... 69
8.13 Cycloconverter Internal Calculation Settings .................................................................... 70
9 Energizing Power Transformer.................................................................................71
9.1 Energizing Excitation Transformer ................................................................................... 71
9.2 Energizing Cycloconverter Transformer ........................................................................... 72
10 Load Test “Rotor Circuit” .........................................................................................73
10.1 Start up Excitation Converter............................................................................................ 73
10.2 DC Current injection on rotor circuit.................................................................................. 73
10.3 Dis-excitation Function..................................................................................................... 75
11 Synchronisation of Reference Voltage to Power ....................................................77
12 Load Test Stator (without Excitation) .........................................................................80
13 Ring Motor Test..........................................................................................................85
13.1 No Load Test ................................................................................................................... 86
Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 3
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
13.2 Load Test......................................................................................................................... 89
14 Final Work ..................................................................................................................90
15 Attachment logbook. .................................................................................................91
15.1 Hardware Modification log book. ...................................................................................... 91
15.2 Software Modification log book......................................................................................... 92

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 4
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
1 General
The GMD drive system commissioning report is divided in part A & part B, containing the following test:

GMD Commissioning Report “Part A” (Document No 3BHS215357)


- E-House
- Air condition
- Fire suppression system
- Motor Control Centre. “MCC”
- Main Circuit Breaker Stator
- Main Circuit Breaker Rotor
- Cycloconverter Transformer
- Excitation Transformer
- Cycloconverter
- Excitation Converter
- Ring Motor (air gaps)

GMD Commissioning Report “Part B” (Document No 3BHS215357)

- PLC point to point test


- PLC signal test
- PLC test interlocks
- Mill Brake System function test
- Mill Lubrication System function test
- PLC drive system function test

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 5
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

1.1 Abbreviations
GMD = Gearless Mill Drive ixR1 = Motor Current Phase R/0°
Cyclo = Cycloconverter ixS1 = Motor Current Phase S/0°
MCB = Main Circuit Breaker ixT1 = Motor Current Phase T/0°
Programmable High Speed
PSR = ixR2 = Motor Current Phase R/30°
Controller
FUPLA = Function Plan Programming ixS2 = Motor Current Phase S/30°
PLC = Programmable Logic Control ixT2 = Motor Current Phase T/30°
VMS = Visual Monitoring System UxMR = Motor Voltage Phase R
MCC = Motor Control Centre UxMS = Motor Voltage Phase S
+MLCP = Mill Local Control Panel UxMT = Motor Voltage Phase T
+F01 = Excitation Control Panel ixe = Excitation Current Actual

+F02 = Cycloconverter Control Panel iwe = Excitation Current Reference


+F03 = Programmable Logic Control uxe = Excitation Voltage Actual

+F04 = Visual Monitoring System psi-x = Actual Flux Vector in ∝/β coordinate
system
+F05…09 = Motor Control Center Panel psi-alfa = Actual Flux Vector in ∝/β coordinate
system
+F14 = Fire Fighting System Panel U-alfa = Firing Angle Control
+F15 = Cyclo Cooling Unit Panel Nx = Mill Speed Actual
+F17 = Lighting Panel Nw = Mill Speed Reference
+AC01…02 = Air Condition no.1-2 Iw = Torque Reference

+CA = Cycloconverter Power Part (U) psiT = Converter Voltage trapez limit

+CB = Cycloconverter Power Part (V) psi-beta = Actual Flux Vector in ∝/β coordinate
system
+CC = Cycloconverter Power Part (W) +idw = Additional Torque Reference
+UPS = Uninterrupted Power Supply AGC1...9 = Actual Air gap Signal.

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 6
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
2 Tools, Documentation and Software

2.1 Commissioning tools list

Item Description Quantity Checked Date Sign.

1 Drive Windows for DCF 600 incl. PCMCIA card for laptop 1
…………. …………
2 Control Panel CDP 312 for DCF 600 1 …………. …………
3 P6021 Current Probe, Tektronix TE6021 3
…………. …………
4 Fluke Scope meter 200MHz, 2,5GS/s, 2 channel 1
…………. …………
5 Memo box 800S, SET LEMFLEX 1
…………. …………
6 Insulation Tester Metriso 5000 (Megger) 1
…………. …………
7 Clamp-Ampermeter LEM AC/DC 2
…………. …………
8 Digital Multimeter MetraHit 28S 2
…………. …………
9 Raytek Infrared Thermometer 1
…………. …………
10 Three-phase Sequence Tester 1
…………. …………
11 Fluke Volt/mA Calibrator 2
…………. …………
12 AC Current Probe i-1000s 1
…………. …………
13 Differential Probe SI-9005 6
…………. …………
14 Maxi-Thermipoint Tool incl. wire, clamps 1
…………. …………
15 Set of Hand Tools & diff. small Parts 1
…………. …………
16 Various Special Test Cables, Plugs, Clamps 1
…………. …………
17 Thyristor test device FADEC 90 1
…………. …………
18 Recorder 4 channel: HIOKI 8835-01 incl. Int. printer 1
…………. …………
19 Recorder 8 channel: HIOKI 8855 incl. Int. printer 2
…………. …………
20 Extension print, XB 9599 a 1
…………. …………
21 Interface Converter RS232/RS485 SSV-3E (220Vac) 1
…………. …………
22 Resistor / Capacitor Set 1
…………. …………
23 Calculator 1
…………. …………

…………. …………

…………. …………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 7
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

2.2 Documentation

Document Revision
Item Description Checked Date Sign.
Number Used
1 Cycloconverter Test Report.
…………. …………
2 E-House Test Report.
…………. …………
3 GMD Drive System Circuit Diagram.
…………. …………
4 MCC Circuit Diagram.
…………. …………
5 Printout PSR Software.
…………. …………
6 PSR fault and alarm list.
…………. …………
7 Design data sheet cycloconverter
…………. …………
8 P&ID Cooling System.
…………. …………
Software Description of Drive Controller
9
PSR2. …………. …………
Function Block Library of Drive
10
Controller PSR2. …………. …………
DCF 600 User’s Manual, for Excitation
11
Converter. …………. …………
ABB Acceptance report
12
(Doc. Nr. HKM 650 164) …………. …………
13 Contract (Drive Specification)
…………. …………
14 PSR signal list including settings
…………. …………
Log book for temporary or permanent
15
Hardware & Software Changes …………. …………
16 Connections for the Transient Recorder
…………. …………

2.3 Commissioning Software

Software
Item Description Checked Date Sign.
Version
1 FUPLA400 for Cycloconverter
…………. …………
2 Drive Windows for Excitation Converter DCF600
…………. …………

…………. …………

…………. …………

…………. …………

…………. …………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 8
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3 Visual Inspection

Inspecting of existing, condition and mounting of the Main Components.

3.1 E-House
- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Protection/IP
………………………… ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

3.2 Main Circuit Breaker of Stator Cycloconverter Transformer


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Rated Voltage kV
………………………… ………………….
Isc kA Time Sec.
…………………. ………………….
Frequency Hz Standard
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 9
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.3 Main Circuit Breaker of Rotor Excitation Transformer


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Rated Voltage kV
………………………… ………………….
Isc kA Time Sec.
…………………. ………………….
Frequency Hz Standard
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 10
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.4 Cycloconverter Transformer

3.4.1 Transformer for cycloconverter +CA


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)
- The tap changer position number: …………. Date:...............Sign.:……
(Put the tap changer to position as it is a nominal input and output voltage)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Standard Vector Group
…………………………. …………………………...
Cooling Frequency Hz
…………………………. ………………….
Primary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Secondary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Tertiary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
No-load loss kW No-load power kVA
…………………. ………………….
Total Weight kg Weight of oil kg
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 11
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.4.2 Transformer for cycloconverter +CB


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)
- The tap changer position number: …………. Date:...............Sign.:……
(Put the tap changer to position as it is a nominal input and output voltage)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Standard Vector Group
…………………………. …………………………...
Cooling Frequency Hz
…………………………. ………………….
Primary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Secondary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Tertiary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
No-load loss kW No-load power kVA
…………………. ………………….
Total Weight kg Weight of oil kg
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 12
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.4.3 Transformer for cycloconverter +CC


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)
- The tap changer position number: …………. Date:...............Sign.:……
(Put the tap changer to position as it is a nominal input and output voltage)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Standard Vector Group
…………………………. …………………………...
Cooling Frequency Hz
…………………………. ………………….
Primary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Secondary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Tertiary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
No-load loss kW No-load power kVA
…………………. ………………….
Total Weight kg Weight of oil kg
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 13
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.5 Excitation Converter Transformer


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)
- The tap changer position number: …………. Date:...............Sign.:……
(Put the tap changer to position as it is a nominal input and output voltage)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Standard Vector Group
…………………………. …………………………...
Cooling Frequency Hz
…………………………. ………………….
Primary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
Secondary Winding

Power kVA Voltage V


…………………. ………………….
Current A Impedance %
…………………. ………………….
No-load loss kW No-load power kVA
…………………. ………………….
Total Weight kg Weight of oil kg
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 14
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.6 Synchronisation Transformer


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Standard Vector Group
…………………………. …………………………...
Power VA Frequency Hz
…………………. ………………….
Primary Winding

Voltage V Current A
…………………. ………………….
Secondary Winding

Voltage V Current A
…………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 15
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.7 Cycloconverter
- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Type No.
…………………………. …………………………...
Input Voltage V Output Voltage V
…………………. ………………….
Input Current A Output Current A
…………………. ………………….
Input Power kVA Output Power kVA
…………………. ………………….
Input Freq. Hz Output Freq. Hz
…………………. ………………….
Standard Protection/IP
………………………… …………………………...

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

3.8 Excitation Converter


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No.
…………………………………………………………………….…………
Input Voltage V Output Voltage Vdc
…………………. ………………….
Input Current A Output Current Adc
…………………. ………………….
Input
Hz
Frequency ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….
Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 16
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

………………………………………………………

3.9 Stator Isolating (Knife) Switch


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Rated Voltage V
………………………… ………………….
Continuous
A Frequency Hz
Rated Current …………………. ………………….
Maximum
A Protection/IP
Current …………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

3.10 Rotor Isolating (Knife) Switch


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Rated Voltage V
………………………… ………………….
Continuous
A Frequency Hz
Rated Current …………………. ………………….
Maximum
A Protection/IP
Current …………………. ………………….

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 17
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.11 Ring Motor


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Type
…………………………. …………………………...
Serial No. Power kW
…………………………. ………………….
Voltage V Current A
…………………. ………………….
Speed Range rpm Cosine phi
…………………. …………………………...
Freq. Range Hz Ins. Class
…………………. …………………………...
Protection/IP Rotation
………………………… …………………………...

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 18
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.12 Protection Relay

3.12.1 Main Feeder Protection Relay


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

3.12.2 Rotor Transformer Protection Relay


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 19
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.12.3 Cycloconverter Transformer Protection Relay (Protection Panel)

3.12.3.1 Transformer protection relay of cycloconverter +CA

- Erection completed Date:...............Sign.:……


(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type
………………………………………………………………………………..
Serial no.
……………………………………………………...………………………...

3.12.3.2 Transformer protection relay of cycloconverter +CB

- Erection completed Date:...............Sign.:……


(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type
………………………………………………………………………………..
Serial no.
……………………………………………………...………………………...

3.12.3.3 Transformer protection relay of cycloconverter +CC

- Erection completed Date:...............Sign.:……


(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type
………………………………………………………………………………..
Serial no.
……………………………………………………...………………………...

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 20
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.13 Fire Suppression System


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 21
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.14 Air Conditioning System


- Erection completed Date:...............Sign.:……
(Abnormal/unusual cases see note below)

Tag Name
……………………………………………………………………………….
Manufacturer Year of Manuf.
…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Voltage V Current A

Power kW Frequency Hz

Tag Name
……………………………………………………………………………….

Manufacturer Year of Manuf.


…………………………. …………………………...
Type Serial no.
…………………………. …………………………...
Voltage V Current A

Power kW Frequency Hz

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 22
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

3.15 GMD’s Auxiliary

Nameplate Protection
Customer Data
Item Description setting Date Sign.
Tag Name Voltage Current (A)
1 Motor Cooling Fan 1 C-3320-FA-303
………. ………. ……………... …………... …………....

2 Motor Cooling Fan 2 C-3320-FA-304


………. ………. ……………... …………... …………....

3 Motor Cooling Fan 3 C-3320-FA-305


………. ………. ……………... …………... …………....

4 Motor Cooling Fan 4 C-3320-FA-306


………. ………. ……………... …………... …………....

5 Motor Overpressure Fan Left C-3320-FA-307


………. ………. ……………... …………... …………....

6 Motor Overpressure Fan Right C-3320-FA-308


………. ………. ……………... …………... …………....

7 Motor Space Heaters 1 C-3320-HE-317


………. ………. ……………... …………... …………....

8 Motor Space Heaters 2 C-3320-HE-318


………. ………. ……………... …………... …………....

9 Motor Space Heaters 3 C-3320-HE-319


………. ………. ……………... …………... …………....

10 Motor Space Heaters 4 C-3320-HE-320


………. ………. ……………... …………... …………....

11 FTB Lube Tank Heater 1 C-3320-HE-301


………. ………. ……………... …………... …………....

12 FTB Lube Tank Heater 2 C-3320-HE-302


………. ………. ……………... …………... …………....

13 FTB Lube Tank Heater 3 C-3320-HE-303


………. ………. ……………... …………... …………....

14 FTB Lube Tank Heater 4 C-3320-HE-304


………. ………. ……………... …………... …………....

15 FTB Lube Tank Heater 5 C-3320-HE-305


………. ………. ……………... …………... …………....

16 FTB Lube Tank Heater 6 C-3320-HE-306


………. ………. ……………... …………... …………....

17 FTB Lube Tank Heater 7 C-3320-HE-307


………. ………. ……………... …………... …………....

18 FTB Lube Tank Heater 8 C-3320-HE-308


………. ………. ……………... …………... …………....

19 FXB Lube Tank Heater 1 C-3320-HE-309


………. ………. ……………... …………... …………....

20 FXB Lube Tank Heater 2 C-3320-HE-310


………. ………. ……………... …………... …………....

21 FXB Lube Tank Heater 3 C-3320-HE-311


………. ………. ……………... …………... …………....

22 FXB Lube Tank Heater 4 C-3320-HE-312


………. ………. ……………... …………... …………....

23 FXB Lube Tank Heater 5 C-3320-HE-313


………. ………. ……………... …………... …………....

24 FXB Lube Tank Heater 6 C-3320-HE-314


………. ………. ……………... …………... …………....

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 23
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
Nameplate Protection
Customer Data
Item Description setting Date Sign.
Tag Name Voltage Current (A)
25 FXB Lube Tank Heater 7 C-3320-HE-315
………. ………. ……………... …………... …………....

26 FXB Lube Tank Heater 8 C-3320-HE-316


………. ………. ……………... …………... …………....

27 Low Pressure Lube Pump A C-3320-PP-306M


………. ………. ……………... …………... …………....

28 Low Pressure Lube Pump B C-3320-PP-307M


………. ………. ……………... …………... …………....

29 FTB High Pressure Lube Pump A C-3320-PP-308M


………. ………. ……………... …………... …………....

30 FTB High Pressure Lube Pump B C-3320-PP-309M


………. ………. ……………... …………... …………....

31 FTB High Pressure Lube Pump C C-3320-PP-310M


………. ………. ……………... …………... …………....

32 FTB High Pressure Lube Pump D C-3320-PP-311M


………. ………. ……………... …………... …………....

33 FXB High Pressure Lube Pump A C-3320-PP-312M


………. ………. ……………... …………... …………....

34 FXB High Pressure Lube Pump B C-3320-PP-313M


………. ………. ……………... …………... …………....

35 FXB High Pressure Lube Pump C C-3320-PP-314M


………. ………. ……………... …………... …………....

36 FXB High Pressure Lube Pump D C-3320-PP-315M


………. ………. ……………... …………... …………....

37 FTB Accumulator Pump A C-3320-PP-316M


………. ………. ……………... …………... …………....

38 FTB Accumulator Pump B C-3320-PP-317M


………. ………. ……………... …………... …………....

39 FXB Accumulator Pump A C-3320-PP-318M


………. ………. ……………... …………... …………....

40 FXB Accumulator Pump B C-3320-PP-319M


………. ………. ……………... …………... …………....

41 Air Conditioning Unit 1 C-3320-AC-301


………. ………. ……………... …………... …………....

42 Air Conditioning Unit 2 C-3320-AC-302


………. ………. ……………... …………... …………....

43 KP001 Cooling Pump no. 1 C-3320-PP-324


………. ………. ……………... …………... …………....

44 KP002 Cooling Pump no. 2 C-3320-PP-325


………. ………. ……………... …………... …………....

45 FTB Filter Pump A C-3320-PP-320M


………. ………. ……………... …………... …………....

46 FTB Filter Pump B C-3320-PP-321M


………. ………. ……………... …………... …………....

47 FXB Filter Pump A C-3320-PP-322M


………. ………. ……………... …………... …………....

48 FXB Filter Pump B C-3320-PP-323M


………. ………. ……………... …………... …………....

49 Hydraulic Brake Pump A C-3320-PP-326M


………. ………. ……………... …………... …………....

50 Hydraulic Brake Pump B C-3320-PP-327M


………. ………. ……………... …………... …………....

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 24
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 25
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

4 Wiring Test
4.1 Single line diagram, power cable wiring

4.1.1 High Voltage cables

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 26
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Power Part
ABB requests following test protocols:
• Hi-Pot test for all HV power cables
• Megger test for all power cable
• Point to point test for all power cable
• Tightening torque bolt
The above-mentioned tests will not be carried out by ABB!

4.1.2 Power Cable of Cycloconverter Circuit


Referring to single line diagram see chapter 4.1.1

Point
Megger Hi-Pot Date &
Description to
Test test Sign.
Point
Cables between MCB and cycloconverter transformer
……………….
no.1
See cable section 1.
……………….

Remark:

Cables between cycloconverter transformer no.1 and


……………….
cycloconverter transformer no.2.
See cable section 2.
……………….

Remark:

Cables between Cycloconverter transformer no.2 and


……………….
Cycloconverter transformer no.3.
See cable section 3.
……………….

Remark:

Cables between cycloconverter transformer no.1 (0°)


……………….
and cycloconverter input +CA (0°)
See cable section 4.
……………….

Remark:

Cables between cycloconverter transformer no.1 (30°)


……………….
and cycloconverter input +CA (30°)
See cable section 5.
……………….

Remark:

Cables between cycloconverter transformer no.2 (0°)


……………….
and cycloconverter input +CB (0°)
See cable section 6.
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 27
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
Point
Megger Hi-Pot Date &
Description to
Test test Sign.
Point
Cables between cycloconverter transformer no.2 (30°)
……………….
and cycloconverter input +CB (30°)
See cable section 7.
……………….

Remark:

Cables between cycloconverter transformer no.3 (0°)


……………….
and cycloconverter input +CC (0°)
See cable section 8.
……………….

Remark:

Cables between cycloconverter transformer no.3 (30°)


……………….
and cycloconverter input +CC (30°)
See cable section 9.
……………….

Remark:

Cables between cycloconverter +CA (output) and stator


……………….
isolator switch.
See cable section 10.
……………….

Remark:

Cables between cycloconverter +CB (output) and stator


……………….
isolator switch.
See cable section 11.
……………….

Remark:

Cables between cycloconverter +CC (output) and stator


……………….
isolator switch.
See cable section 12.
……………….

Remark:

Cable between star point fuse of cycloconverter and


……………….
stator isolator switch.
See cable section 13.
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 28
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

4.1.3 Power Cable of Excitation Converter Circuit


Referring to single line diagram see chapter 4.1.1

Megger Hi-Pot Point to Date &


Description
Test test Point Sign.

Cables between MCB and excitation converter


……………….
transformer.
See cable section 14.
……………….

Remark:

Cables between excitation converter transformer and


……………….
excitation converter.
See cable section 15.
……………….

Remark:

Cables between excitation converter ( ⊕ Bus) and rotor


……………….
isolator switch ( ⊕ Bus).
See cable section 16. ……………….

Remark:

Cables between excitation converter ( Bus) and rotor


……………….
isolator switch ( Bus).
See cable section 17.
……………….

Remark:

Cables between rotor isolator switch ( ⊕ Bus) and slip


……………….
ring rotor ( ⊕ Bus).
See cable section 19. ……………….

Remark:

Cables between rotor isolator switch ( Bus) and slip


……………….
ring rotor ( Bus).
See cable section 20.
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 29
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

4.1.4 Power Cable of MCC (Motor Control Centre)

Megger Point to Date &


Description
Test Point Sign.

……………….
Cables between LV power and MCC (Incomer)
……………….

Remark:

Cables between MCC (+F09/BA01) and Air Condition ……………….


Unit 1 (C-3320-AC-301)
……………….

Remark:

Cables between MCC (+F09/BA03) and Air Condition ……………….


Unit 2 (C-3320-AC-302)
……………….

Remark:

Cables between MCC (+F07/DA01) and Cyclo- ……………….


converter Cooling Unit Pump 1 (C-3320-PP-324)
……………….

Remark:

Cables between MCC (+F07/DA03) and Cyclo- ……………….


converter Cooling Unit Pump 2 (C-3320-PP-325)
……………….

Remark:

Cables between MCC (+F07/FA01) Ring Motor Cooling ……………….


Fan 1 (C-3320-FA-303)
……………….

Remark:

Cables between MCC (+F07/FA03) Ring Motor Cooling ……………….


Fan 2 (C-3320-FA-304)
……………….

Remark:

Cables between MCC (+F07/HA01) Ring Motor Cooling ……………….


Fan 3 (C-3320-FA-305)
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 30
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Megger Point to Date &


Description
Test Point Sign.

Cables between MCC (+F07/HA03) Ring Motor Cooling ……………….


Fan 4 (C-3320-FA-306)
……………….

Remark:

Cables between MCC (+F07/BA01) and Ring Motor ……………….


Over Pressure Fan Left (C-3320-FA-307)
……………….

Remark:

Cables between MCC (+F07/BA03) and Ring Motor ……………….


Over Pressure Fan Right (C-3320-FA-308)
……………….

Remark:

Cables between MCC (+F08/FA01) and Ring Motor ……………….


Space Heaters 1 - 4 (C-3320-HE-317…320)
……………….

Remark:

Cables between MCC (+F08/MA01) and FTB High ……………….


Pressure Pump A (C-3320-PP-308M)
……………….

Remark:

Cables between MCC (+F08/PA01) and FTB High ……………….


Pressure Pump B (C-3320-PP-309M)
……………….

Remark:

Cables between MCC (+F08/RA01) and FTB High ……………….


Pressure Pump C (C-3320-PP-310M)
……………….

Remark:

Cables between MCC (+F08/TA01) and FTB High ……………….


Pressure Pump D (C-3320-PP-311M)
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 31
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Megger Point to Date &


Description
Test Point Sign.

Cables between MCC (+F07/RA01) and FTB ……………….


Accumulator Pump A (C-3320-PP-316M)
……………….

Remark:

Cables between MCC (+F07/RA03) and FTB ……………….


Accumulator Pump B (C-3320-PP-317M)
……………….

Remark:

Cables between MCC (+F07/MA01) and FTB Filter ……………….


Pump A (C-3320-PP-320M)
……………….

Remark:

Cables between MCC (+F07/MA03) and FTB Filter ……………….


Pump B (C-3320-PP-321M)
……………….

Remark:

Cables between MCC (+F08/DA01) and FTB Tank ……………….


Heaters (C-3320-HE-301…308)
……………….

Remark:

Cables between MCC (+F09/MA01) and FXB High ……………….


Pressure Pump A (C-3320-PP-312M)
……………….

Remark:

Cables between MCC (+F09/PA01) and FXB High ……………….


Pressure Pump B (C-3320-PP-313M)
……………….

Remark:

Cables between MCC (+F09/RA01) and FXB High ……………….


Pressure Pump C (C-3320-PP-314M)
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 32
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Megger Point to Date &


Description
Test Point Sign.

Cables between MCC (+F09/TA01) and FXB High ……………….


Pressure Pump D (C-3320-PP-315M)
……………….

Remark:

Cables between MCC (+F07/TA01) and FXB ……………….


Accumulator Pump A (C-3320-PP-318M)
……………….

Remark:

Cables between MCC (+F07/TA03) and FXB ……………….


Accumulator Pump B (C-3320-PP-319M)
……………….

Remark:

Cables between MCC (+F07/PA01) and FXB Filter ……………….


Pump A (C-3320-PP-322M)
……………….

Remark:

Cables between MCC (+F07/PA03) and FXB Filter ……………….


Pump B (C-3320-PP-323M)
……………….

Remark:

Cables between MCC (+F08/BA01) and FXB Low ……………….


Pressure Pump A (C-3320-PP-306M)
……………….

Remark:

Cables between MCC (+F08/BA03) and FXB Low ……………….


Pressure Pump B (C-3320-PP-307M)
……………….

Remark:

Cables between MCC (+F08/DA03) and FXB Tank ……………….


Heaters (C-3320-HE-309…316)
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 33
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Megger Point to Date &


Description
Test Point Sign.

Cables between MCC (+F07/KA01) and Hydraulic ……………….


Brake Pump A (C-3320-PP-326)
……………….

Remark:

Cables between MCC (+F07/KA03) and Hydraulic ……………….


Brake Pump B (C-3320-PP-327)
……………….

Remark:

Cables between MCC (+F06/-F41) and Cyclo


……………….
Transformers Heater + Light. 230V AC (C-3320-XF-
301…303)
……………….

Remark:

Cables between MCC (+F06/-F44) and E-house Light & ……………….


Socket 230V AC (+F17)
……………….

Remark:

Cables between MCC (+F06/-F48) and Brake Reservoir ……………….


Immersion Heater 230V AC
……………….

Remark:

Cables between MCC (+F06/-F51) and Control Panel ……………….


+F01, 02, 03 Light & Socket 230V AC (+F01)
……………….

Remark:

Cables between MCC (+F06/-F53) and Excitation ……………….


Converter 230V AC (+F01)
……………….

Remark:

Cables between MCC (+F06/-F54) and PLC Panel ……………….


230V AC (+F03)
……………….

Remark:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 34
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Megger Point to Date &


Description
Test Point Sign.

Cables between MCC (+F06/-F56) and Cyclo Cooling ……………….


Unit 230V AC (+F15)
……………….

Remark:

Cables between MCC (+F06/-F61) and UPS Panel ……………….


120V AC (+UPS)
……………….

Remark:

Cables between MCC (+F06/-F67) and Fire Fighting ……………….


Panel 120V AC (+F14)
……………….

Remark:

Cables between MCC (+F06/-F73) and PSR Control ……………….


Panel 120V AC (+F02)
……………….

Remark:

Cables between MCC (+F06/-F75) and PLC Control ……………….


Panel 120V AC (+F03)
……………….

Remark:

4.1.5 Power supply 110VDC from substation to protection relay panel (Not applicable for Cerro
Verde Project).

Megger Point to Date &


Description
Test Point Sign.

Cables between substation (110V DC) and relays in


……………….
panel +F02 (-112K1…3)
……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 35
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
4.1.6 Tightening Torque Bolt of Cycloconverter Circuit

Note: tightening torque is given in document: User’s Manual for Cycloconverter (document No. 3BHS130738
page 17)

Referring to single line diagram see chapter 4.1.1

Description Received Checked Date Sign.

Tightening torque bolt group at output of cycloconverter


……………… ……………….
main circuit breaker.
See section point 1a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
transformer phase no.1.
See section point 1b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer phase no.1.
See section point 2a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
transformer phase no.2.
See section point 2b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer phase no.2.
See section point 3a.
……………… ……………….

Tightening torque bolt group at input of Cycloconverter


……………… ……………….
transformer phase no.3.
See section point 3b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer phase no.1 (0°).
See section point 4a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
+CA (0°).
See section point 4b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer no.1 (30°).
See section point 5a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
+CA (30°).
See section point 5b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer no.2 (0°).
See section point 6a.
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 36
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at input of cycloconverter


……………… ……………….
+CB (0°).
See section point 6b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer no.2 (30°).
See section point 7a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
+CB (30°).
See section point 7b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer no.3 (0°).
See section point 8a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
+CC (0°).
See section point 8b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
transformer no.3 (30°).
See section point 9a.
……………… ……………….

Tightening torque bolt group at input of cycloconverter


……………… ……………….
+CC (30°).
See section point 9b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
+CA.
See section point 10a.
……………… ……………….

Tightening torque bolt group at input of isolator switch.


……………… ……………….
(Phase R)
See section point 10b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
+CB.
See section point 11a.
……………… ……………….

Tightening torque bolt group at input of isolator switch.


……………… ……………….
(Phase S)
See section point 11b.
……………… ……………….

Tightening torque bolt group at output of cycloconverter


……………… ……………….
+CC.
See section point 12a.
……………… ……………….

Tightening torque bolt group at input of isolator switch.


……………… ……………….
(Phase T)
See section point 12b.
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 37
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at output of cycloconverter


……………… ……………….
star point fuse.
See section point 13a.
……………… ……………….

Tightening torque bolt group at input of isolator switch.


……………… ……………….
(Star connector, Neutral)
See section point 13b.
……………… ……………….

4.1.7 Tightening Torque Bolt of Excitation Converter Circuit


Referring to single line diagram see chapter 4.1.1

Description Received Checked Date Sign.

Tightening torque bolt group at output of excitation main


……………… ……………….
circuit breaker.
See section point 14a.
……………… ……………….

Tightening torque bolt group at input of excitation


……………… ……………….
transformer.
See section point 14b.
……………… ……………….

Tightening torque bolt group at output of excitation


……………… ……………….
transformer.
See section point 15a.
……………… ……………….

Tightening torque bolt group at input of excitation


……………… ……………….
converter.
See section point 15b.
……………… ……………….
Tightening torque bolt group at output of excitation
……………… ……………….
converter ( ⊕ Bus).
See section point 16a.
……………… ……………….

Tightening torque bolt group at input of isolator switch


……………… ……………….
( ⊕ Bus).
See section point 16b.
……………… ……………….

Tightening torque bolt group at output of excitation


……………… ……………….
converter ( Bus).
See section point 17a.
……………… ……………….

Tightening torque bolt group at input of isolator switch


……………… ……………….
( Bus).
See section point 17b.
……………… ……………….

Tightening torque bolt group at output of isolator switch


……………… ……………….
( ⊕ Bus).
See section point 19a.
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 38
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at input of slip ring rotor


……………… ……………….
( ⊕ Bus).
See section point 19b.
……………… ……………….

Tightening torque bolt group at output of isolator switch


……………… ……………….
( Bus).
See section point 20a.
……………… ……………….

Tightening torque bolt group at input of slip ring rotor


……………… ……………….
( Bus).
See section point 20b.
……………… ……………….

4.1.8 Tightening Torque Bolt of MCC


Referring to single line diagram see chapter 4.1.2

Description Received Checked Date Sign.

Tightening torque bolt group at output of power supply ……………… ……………….


3x480VAC for MCC.
……………… ……………….

Tightening torque bolt group at input of incomer for ……………… ……………….


MCC (+F05).
……………… ……………….

Tightening torque bolt group at output of MCC for Air ……………… ……………….
Conditioning Unit no.1 (+F09/BA01).
……………… ……………….

Tightening torque bolt group at input of Air Conditioning ……………… ……………….


Unit no.1 (C-3320-AC-301)
……………… ……………….

Tightening torque bolt group at output of MCC for Air ……………… ……………….
Conditioning Unit no.2 (+F09/BA03).
……………… ……………….

Tightening torque bolt group at input of Air Conditioning ……………… ……………….


Unit no.2 (C-3320-AC-302)
……………… ……………….

Tightening torque bolt group at output of MCC for Cyclo ……………… ……………….
Cooling Unit Pump 1 (+F07/DA01).
……………… ……………….

Tightening torque bolt group at input of Cyclo Cooling ……………… ……………….


Unit Pump 1 (C-3320-PP-324)
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 39
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at output of MCC for Cyclo ……………… ……………….
Cooling Unit Pump 2 (+F07/DA03).
……………… ……………….

Tightening torque bolt group at input of Cyclo Cooling ……………… ……………….


Unit Pump 2 (C-3320-PP-325)
……………… ……………….

Tightening torque bolt group at output of MCC for Ring ……………… ……………….
motor Cooling Fan 1 (+F07/FA01).
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Cooling Fan 1 (C-3320-FA-303)
……………… ……………….

Tightening torque bolt group at output of MCC for Ring ……………… ……………….
motor Cooling Fan 2 (+F07/FA03).
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Cooling Fan 2 (C-3320-FA-304)
……………… ……………….

Tightening torque bolt group at output of MCC for Ring ……………… ……………….
motor Cooling Fan 3 (+F07/HA01).
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Cooling Fan 3 (C-3320-FA-305)
……………… ……………….

Tightening torque bolt group at output of MCC for Ring ……………… ……………….
motor Cooling Fan 4 (+F07/HA03)
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Cooling Fan 4 (C-3320-FA-306)
……………… ……………….

Tightening torque bolt group at output of MCC for ……………… ……………….


Overpressure Fan Left (+F07/BA01)
……………… ……………….

Tightening torque bolt group at input of Overpressure ……………… ……………….


Fan Left (C-3320-FA-307)
……………… ……………….

Tightening torque bolt group at output of MCC for ……………… ……………….


Overpressure Fan Right (+F07/BA03)
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 40
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at input of Overpressure ……………… ……………….


Fan Right (C-3320-FA-308)
……………… ……………….

Tightening torque bolt group at output of MCC for Ring ……………… ……………….
motor Space heaters 1 – 4 (+F08/FA01).
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Space heater 1(C-3320-HE-317)
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Space heater 2(C-3320-HE-318)
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Space heater 3(C-3320-HE-319)
……………… ……………….

Tightening torque bolt group at input of Ring motor ……………… ……………….


Space heater 4(C-3320-HE-320)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
High Pressure Pump A (+F08/MA01)
……………… ……………….

Tightening torque bolt group at input of FTB High ……………… ……………….


Pressure Pump A (C-3320-PP-308)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
High Pressure Pump B (+F08/PA01)
……………… ……………….

Tightening torque bolt group at input of FTB High ……………… ……………….


Pressure Pump B (C-3320-PP-309)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
High Pressure Pump C (+F08/RA01)
……………… ……………….

Tightening torque bolt group at input of FTB High ……………… ……………….


Pressure Pump C (C-3320-PP-310)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
High Pressure Pump D (+F08/TA01)
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 41
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at input of FTB High ……………… ……………….


Pressure Pump D (C-3320-PP-311)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
Accumulator Pump A (+F07/RA01)
……………… ……………….

Tightening torque bolt group at input of FTB ……………… ……………….


Accumulator Pump A (C-3320-PP-316)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
Accumulator Pump B (+F07/RA03)
……………… ……………….

Tightening torque bolt group at input of FTB ……………… ……………….


Accumulator Pump B (C-3320-PP-317)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
Filter Pump A (+F07/MA01)
……………… ……………….

Tightening torque bolt group at input of FTB Filter Pump ……………… ……………….
A (C-3320-PP-320)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
Filter Pump B (+F07/MA03)
……………… ……………….

Tightening torque bolt group at input of FTB Filter Pump ……………… ……………….
B (C-3320-PP-321)
……………… ……………….

Tightening torque bolt group at output of MCC for FTB ……………… ……………….
Tank Heater (+F08/DA01)
……………… ……………….

Tightening torque bolt group at input of FTB Tank ……………… ……………….


Heater (C-3320-HE-301…308)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
High Pressure Pump A (+F09/MA01)
……………… ……………….

Tightening torque bolt group at input of FXB High ……………… ……………….


Pressure Pump A (C-3320-PP-312)
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 42
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
High Pressure Pump B (+F09/PA01)
……………… ……………….

Tightening torque bolt group at input of FXB High ……………… ……………….


Pressure Pump B (C-3320-PP-313)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
High Pressure Pump C (+F09/RA01)
……………… ……………….

Tightening torque bolt group at input of FXB High ……………… ……………….


Pressure Pump C (C-3320-PP-314)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
High Pressure Pump D (+F09/TA01)
……………… ……………….

Tightening torque bolt group at input of FXB High ……………… ……………….


Pressure Pump D (C-3320-PP-315)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Accumulator Pump A (+F07/TA01)
……………… ……………….

Tightening torque bolt group at input of FXB ……………… ……………….


Accumulator Pump A (C-3320-PP-318)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Accumulator Pump B (+F07/TA03)
……………… ……………….

Tightening torque bolt group at input of FXB ……………… ……………….


Accumulator Pump B (C-3320-PP-319)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Filter Pump A (+F07/PA01)
……………… ……………….

Tightening torque bolt group at input of FXB Filter Pump ……………… ……………….
A (C-3320-PP-322)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Filter Pump B (+F07/PA03)
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 43
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Description Received Checked Date Sign.

Tightening torque bolt group at input of FXB Filter Pump ……………… ……………….
B (C-3320-PP-323)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Tank Heater (+F08/DA03)
……………… ……………….

Tightening torque bolt group at input of FXB Tank ……………… ……………….


Heater (C-3320-HE-309…316)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Low Pressure Pump A (+F08/BA01)
……………… ……………….

Tightening torque bolt group at input of FXB Low ……………… ……………….


Pressure Pump A (C-3320-PP-306)
……………… ……………….

Tightening torque bolt group at output of MCC for FXB ……………… ……………….
Low Pressure Pump B (+F08/BA03)
……………… ……………….

Tightening torque bolt group at input of FXB Low ……………… ……………….


Pressure Pump B (C-3320-PP-307)
……………… ……………….

Tightening torque bolt group at output of MCC for ……………… ……………….


Hydraulic Brake Pump A (+F07/KA01)
……………… ……………….

Tightening torque bolt group at input of Hydraulic Brake ……………… ……………….


Pump A (C-3320-PP-326)
……………… ……………….

Tightening torque bolt group at output of MCC for ……………… ……………….


Hydraulic Brake Pump B (+F07/KA03)
……………… ……………….

Tightening torque bolt group at input of FXB Hydraulic ……………… ……………….


Brake Pump B (C-3320-PP-327)
……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 44
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
4.2 Control part
Check the wiring between PSR Control panel (+F02) and all relevant equipment. Checks are without the
equipment energized.

4.2.1 Control signals between PSR control panel (+F02) and cycloconverter main circuit breaker

Description Checked Date Sign.

MVD1 On Command signal. “Relay –112K1”


……………… ……………….

MVD1 Off Command signal. “Relay –112K2”


……………… ……………….

MVD1 Trip Command signal. “Relay –112K3”


……………… ……………….

MVD1 Feedback signal of circuit breaker closed. “Relay –112K4”


……………… ……………….

MVD1 Feedback signal of circuit breaker open. “Relay –112K5”


……………… ……………….
MVD1 Feedback signal of circuit breaker available “Relay –
112K6” ……………… ……………….

MVD1 Feedback signal of circuit breaker trip. “Relay –112K7”


……………… ……………….

Synchronisation supply voltage 110 Volts (3 phase)


……………… ……………….

4.2.2 Control signals between PSR control panel (+F02) and excitation main circuit breaker

Description Checked Date Sign.

MVD2 On Command signal. “Relay –113K1”


……………… ……………….

MVD2 Off Command signal. “Relay –113K2”


……………… ……………….

MVD2 Trip Command signal. “Relay –113K3”


……………… ……………….

MVD2 Feedback signal of circuit breaker closed. “Relay –113K4”


……………… ……………….

MVD2 Feedback signal of circuit breaker open. “Relay –113K5”


……………… ……………….
MVD2 Feedback signal of circuit breaker available “Relay –
113K6” ……………… ……………….

MVD2 Feedback signal of circuit breaker trip. “Relay –113K7”


……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 45
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
4.2.3 Control signals between PSR control panel (+F02) and ring motor

Description Checked Date Sign.


Air gap signal probe no.1 / 21: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.2 / 22: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.3 / 23: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.4 / 24: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.5 / 25: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.6 / 26: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.7 / 27: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.8 / 28: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….
Air gap signal probe no.9 / 29: Control signal between the signal
conditioner box and i/u converter. ……………… ……………….

4.2.4 Control signals between PSR control panel (+F02) and field emergency stops

Description Checked Date Sign.

Emergency stop number 1


……………… ……………….

Emergency stop number 2


……………… ……………….

Emergency stop number 3


……………… ……………….

Emergency stop number 4


……………… ……………….

4.2.5 Control signals between PSR control panel (+F02) and mill local control panel (+MLCP)

Description Checked Date Sign.

Coaxial cable for ARC net communication.


……………… ……………….

Supply voltage for MLCP +24V DC


……………… ……………….

Supply voltage for external horn 120 V AC.


……………… ……………….

Emergency stop signal.


……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 46
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
4.2.6 Control signals between mill local control panel (+MLCP) and radio control, remote module

Description Checked Date Sign.

Start command signal.


……………… ……………….

Stop command signal.


……………… ……………….

Emergency stop signal.


……………… ……………….

4.2.7 Control signals from cycloconverter transformer protection box

Description Checked Date Sign.

Cycloconverter transformer phase U, Buchholz trip signal.


……………… ……………….
Cycloconverter transformer phase U, Overpressure relief valve
trip signal. ……………… ……………….

Cycloconverter transformer phase U, CT’s wiring primary side.


……………… ……………….

Cycloconverter transformer phase V, Buchholz trip signal.


……………… ……………….
Cycloconverter transformer phase V, Overpressure relief valve
trip signal. ……………… ……………….

Cycloconverter transformer phase V, CT’s wiring primary side.


……………… ……………….

Cycloconverter transformer phase W, Buchholz trip signal.


……………… ……………….
Cycloconverter transformer phase W, Overpressure relief valve
trip signal. ……………… ……………….

Cycloconverter transformer phase W, CT’s wiring primary side.


……………… ……………….

……………… ……………….

……………… ……………….

……………… ……………….

……………… ……………….

……………… ……………….

……………… ……………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 47
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
5 Energise MCC’s & Low Voltage Distribution
Energizing shall only occur once the LV power and control wiring is checked as detailed in section 4.
Make sure that all circuit breakers on the distribution panel are switched off for each motor starter. Tag and
pad lock all circuit breakers.
- All MCC Modules in off position Date:...............Sign.:……
- Insulation test of the bus bar (500 V) Date:...............Sign.:……

5.1 Energise Incoming MCC Supply Voltage (3 Phase).


Switch on the voltage incoming power supply (3-phase 480V / 60Hz) and measuring the voltage at
incoming breaker.

Date Sign.

Voltage R-S V
…………………….. …………………... …………………..

Voltage S-T V
…………………….. …………………... …………………..

Voltage T-R V
…………………….. …………………... …………………..

Frequency Hz
…………………….. …………………... …………………..

Phase Sequence -
…………………….. …………………... …………………..

Note: ………………………………………………………………………………………………………

………………………………………………………………………………………………………

5.2 Energise Lighting and Power Sockets.


Energise the power for E-house Sockets 230 V AC and Lighting (+F06/ –F44)

Date Sign.

Voltage .......................... V
…………………... …………………..

Frequency .......................... Hz
…………………... …………………..

Note: ………………………………………………………………………………………………………

………………………………………………………………………………………………………

………………………………………………………

5.3 Internal Auxiliary Power Supply 230/240 Volts. (Single Phase)


Energise the Control panel (+F01, 02, 03) Light and sockets 230 V AC (+F06/ –F51)

Date Sign.

Voltage .......................... V
…………………... …………………..

Frequency .......................... Hz
…………………... …………………..

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 48
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Note: ………………………………………………………………………………………………………

………………………………………………………………………………………………………

………………………………………………………

5.4 Internal Auxiliary Power Supply 110/120 Volts. (Single Phase)


Energise the power for PSR Control panel 120 V AC (+F06/ –F73)

Date Sign.

Voltage .......................... V
…………………... …………………..

Frequency .......................... Hz
…………………... …………………..

Note: ………………………………………………………………………………………………………

………………………………………………………………………………………………………

………………………………………………………

5.5 Start up UPS.


Energise UPS (+F06/ –F61) and check output voltage/current during no load and full load.
- All circuit breaker are off position Date:...............Sign.:……

Date Sign.

Voltage Input .......................... V


…………………... …………………..

Current Input .......................... A


…………………... …………………..

Frequency .......................... Hz
…………………... …………………..

No Load Measurement
…………………... …………………..

Voltage Output .......................... V


…………………... …………………..

Current Output .......................... A


…………………... …………………..

Full Load Measurement


…………………... …………………..

Voltage Output .......................... V


…………………... …………………..

Current Output .......................... A


…………………... …………………..

Note: ………………………………………………………………………………………………………

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 49
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

5.6 Energise Control Voltage in Panels

- Energise supply voltage 230 V AC (+F06/ –F53) to Excitation


Control Panel (+F01).
Actual voltage measurement: …………….. Volts. Date:...............Sign.:…………
- Energise supply voltage 230 V AC (+F06/ –F54) to PLC
interconnection (+F3).
- Actual voltage measurement: …………….. Volts Date:...............Sign.:…………
- Energise supply voltage 230 V AC (+F06/ -F56) to Cyclo
Cooling Unit panel (+F15).
Actual voltage measurement: …………….. Volts. Date:...............Sign.:…………
- Energise supply voltage 120 V AC (+F06/ -F67) to Fire
Fighting System panel (+F14).
Actual voltage measurement: …………….. Volts. Date:...............Sign.:…………
- Energise supply voltage 120 V AC (+F06/ -F75) to PLC
Control panel (+F03).
- Actual voltage measurement: …………….. Volts Date:...............Sign.:…………
- Energise supply voltage 120 V AC (+F02/ –303F3) to 24 V
dc power supply of air gap signal conditioner.
Actual voltage measurement: …………….. Volts. Date:...............Sign.:…………
- Energise supply voltage 120 V (+F02/ –303F1) to 24 V dc
power supply of PSR control panel (+F02).
Actual voltage measurement: …………….. Volts. Date:...............Sign.:…………
- Energise supply voltage 120 V (+F02/ –303F2) to 48 V dc
power supply of PSR control panel (+F02).
Actual voltage measurement: …………….. Volts. Date:...............Sign.:…………
- Measuring the control voltage of drive controller.
Uout +24VDC:..............V dc
Uout +15VDC:..............V dc
Uout-15VDC :..............V dc
Uout 5VDC :..............V dc
Uout +48VDC:..............V dc Date:...............Sign.:…………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 50
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

6 Signal Test.

- Energise control circuit of all signals to PLC Date:...............Sign.:……


- Energise control circuit of all signals to PSR Date:...............Sign.:……
- Energise control circuit of all signals to Cyclo Cooling Unit Date:...............Sign.:……
- Energise control circuit of all signals to Transf. Protection Panel Date:...............Sign.:……
- Energise control circuit of all signals to Main Substation Date:...............Sign.:……
- Energise control circuit of all signals to Lubrication System Date:...............Sign.:……
- Energise control circuit of all signals to Brake System Date:...............Sign.:……
- Energise control circuit of all signals to Mill Local Control Panel Date:...............Sign.:……

Note: All signals that relate to PLC please see at “part B”

6.1 Cycloconverter Transformers phase U Protection


Hardware protection/interlock to open main circuit breaker

Descriptions Tested Date Name

Buchholz Trip …………………….. ……………………..

Overpressure Relief Valve …………………….. ……………………..

Note: ……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

………………………………………………………

6.2 Cycloconverter Transformers phase V Protection


Hardware protection/interlock to open main circuit breaker

Descriptions Tested Date Name

Buchholz Trip …………………….. ……………………..

Overpressure Relief Valve …………………….. ……………………..

Note: ……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 51
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

6.3 Cycloconverter Transformers phase W Protection


Hardware protection/interlock to open main circuit breaker

Descriptions Tested Date Name

Buchholz Trip …………………….. ……………………..

Overpressure Relief Valve …………………….. ……………………..

Note: ……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

……………………………………………………………………………………………………………

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 52
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

6.4 Air-gap Measurement.


PSR Input
Feeler Gage
Current of Signal PSR PSR
(mm)
Air gap Conditioner (V) Reading PSR Control
Fluor “Mechanica
Probe (mA) “Analogue (%) Offset Panel
Tag Number l
No. “u/i converter input on I/O “Software (%) (+F02)
measureme
module” board Reading” (mm)
nt”
UAC326”
Air gap probe 33-ZE-8011A
no.1
Air gap probe 33-ZE-8011B
no.2
Air gap probe 33-ZE-8011C
no.3
Air gap probe 33-ZE-8011D
no.4
Air gap probe 33-ZE-8011E
no.5
Air gap probe 33-ZE-8011F
no.6
Air gap probe 33-ZE-8011G
no.7
Air gap probe 33-ZE-8011H
no.8
Air gap probe 33-ZE-8011J
no.9

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Probe no.7 Probe no.6

27 26
Probe no.5
25
Probe no.8 Probe no.4
28
24
VIEW FROM
FEED SIDE

29 23 Probe no.3
Probe no.9

21 22

Probe no.1 Probe no.2

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 53
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
7 Function Tests

7.1 Check Rotational of Aux. Motor (Motor Cooling Fan, Lubrication and Brake System)

Item Description Tag Name CW CCW Date Sign.

1 Motor Cooling Fan 1 C-3320-FA-303


……………... …………....

2 Motor Cooling Fan 2 C-3320-FA-304


……………... …………....

3 Motor Cooling Fan 3 C-3320-FA-305


……………... …………....

4 Motor Cooling Fan 4 C-3320-FA-306


……………... …………....

5 Motor Overpressure Fan Left C-3320-FA-307


……………... …………....

6 Motor Overpressure Fan Right C-3320-FA-308


……………... …………....
FXB Low Pressure Lube Pump
7 C-3320-PP-306M
A ……………... …………....
FXB Low Pressure Lube Pump
8 C-3320-PP-307M
B ……………... …………....
FTB High Pressure Lube
9 C-3320-PP-308M
Pump A ……………... …………....
FTB High Pressure Lube
10 C-3320-PP-309M
Pump B ……………... …………....
FTB High Pressure Lube
11 C-3320-PP-310M
Pump C ……………... …………....
FTB High Pressure Lube
12 C-3320-PP-311M
Pump D ……………... …………....
FXB High Pressure Lube
13 C-3320-PP-312M
Pump A ……………... …………....
FXB High Pressure Lube
14 C-3320-PP-313M
Pump B ……………... …………....
FXB High Pressure Lube
15 C-3320-PP-314M
Pump C ……………... …………....
FXB High Pressure Lube
16 C-3320-PP-315M
Pump D ……………... …………....

17 FTB Accumulator Pump A C-3320-PP-316M


……………... …………....

18 FTB Accumulator Pump B C-3320-PP-317M


……………... …………....

19 FXB Accumulator Pump A C-3320-PP-318M


……………... …………....

20 FXB Accumulator Pump B C-3320-PP-319M


……………... …………....

21 FTB Filter Pump A C-3320-PP-320M


……………... …………....

22 FTB Filter Pump B C-3320-PP-321M


……………... …………....

23 FXB Filter Pump A C-3320-PP-322M


……………... …………....

24 FXB Filter Pump B C-3320-PP-323M


……………... …………....

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 54
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Item Description Tag Name CW CCW Date Sign.

25 KP001 Cooling Pump no. 1 C-3320-PP-324


……………... …………....

26 KP002 Cooling Pump no. 2 C-3320-PP-325


……………... …………....

27 Hydraulic Brake Pump A C-3320-PP-326M


……………... …………....

28 Hydraulic Brake Pump B C-3320-PP-327M


……………... …………....

29 Air Conditioning Unit 1 C-3320-AC-301


……………... …………....

30 Air Conditioning Unit 2 C-3320-AC-302


……………... …………....

31
……………... …………....

32
……………... …………....

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 55
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

7.2 Cycloconverter Cooling Unit (+F15)

Deionised water of a conductivity less than 20 S/cm must be available for the converter internal
closed water circuit (about 320 litres for each converter)
For flushing and cleaning the system (first water filling), additional 320 litres deionised water
(<20 S/cm) must be available.

Cooling unit has to be commissioned following the procedures mentioned in the Cycloconverter User’s
manual (Document No. 3BHS130198) Date:...............Sign.:……

Check DIP switch of the ARC net communication board UAC096 Date:...............Sign.:……
(Settings according GMD circuit diagram)
Chosen GA :............ x=open DIP - Switch : 0 1 2 3 4 5 6 -

Check control supply voltage Ucontr:.................VDC Date:...............Sign.:……


Check supply voltage for the pumps Uin: 3 x ..............VAC Date:...............Sign.:……
Check adjustment of all sensors itself Date:...............Sign.:……
Running pump 1 / 2 and check rotation Date:...............Sign.:……
Check analogue signals going to the PSR control panel AFC094 Date:...............Sign.:……
Check leakage detection CL011 Date:...............Sign.:……

Sensor Hardware Measured Meter Indication Reading of Fupla


adjustment Value at Input Indication Display Software
board Cooling unit AFC094 (%)
(mA) Panel
CF001 (flow) 4-20mA l/min l/min
for............….. l/min
to ..........……..l/min
CD001 (Conductivity) 4-20mA S/cm S/cm
for.............… S/cm
to..........….... S/cm
CT001 (Internal 4-20mA C°
Cooling Temperature) for...........…... C°.
to...........….….C°
CT002 (Internal 4-20mA C°
Cooling Temperature) for................. C°
to.............…...C°
CT004 (External 4-20mA C°
Cooling Temperature) for................. C°
to.............…....C°
CT005 (External 4-20mA C°
Cooling Temperature) for................. C°
to.............…...C°
CP001 (pressure) 4-20mA bar
for................. bar
to............…....bar
CL001 (water level) 4-20mA %
for................ 100%
to.........……..100%
CL011 (leakage) Logic “0” or “1”

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 56
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Notes/Comments
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................
..............................................................................................................................................

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 57
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

7.3 Cycloconverter transformer over current protection


Transformer Protection Relay Type SPAJ 140 C - DA Date:...............Sign.:……

Remarks Page
Relay 1 number
Relay 2 number
Relay 3 number

Visual check for transport damage

Visual check of external wiring

Check of relay grounding

Check of supply voltage (DC/AC)

Check of settings (calculated by....)

Check of C.T. circuits

Secondary injection with test set type ...

Check of input signals

Check of signalisation/alarms

Check of tripping

Final check

Transformer data

Manufacturer ............................................... Type of cooling ....................


Type ............................................... (ONAN, ONAF etc.)
Rated power SN .............../.............../............... MVA Vector group ....................

Primary side HV Secondary side LV Tertiary side TV


Rated voltage .................... kV ± .................... kV .................... kV .................... kV
Rated current .................... A .................... A .................... A

Positive-sequence HV-LV .................... % at .................... MVA


Impedance LV-TV .................... % at .................... MVA
HV-TV .................... % at .................... MVA

Main C.T./P.T. ratio Settings


Analogue inputs 1 - 2 ...................../................... A/A According to separate print out
Analogue inputs 4 - 5 ...................../................... A/A Software version of the relay ..........
Analogue inputs 7 - 8 ...................../................... ...../.....
Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 58
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
7.4 Emergency stop relay (Control Panel +F02)
Test of the emergency stop relay
Test relay time delay in case of an E-stop (time delay set point 500ms) Date:...............Sign.:……
Test that E-stop signal is received by the PSRI/O board Date:...............Sign.:……
Test that E-stop signal is received by the PLCI/O board Date:...............Sign.:……
Test E-stop (-……………) of the field (close to the mill) Date:...............Sign.:……
Test E-stop (-……………) of the field (close to the mill) Date:...............Sign.:……
Test E-stop (-……………) of the field (close to the mill) Date:...............Sign.:……
Test E-stop (-……………) of the motor local control panel (MLCP) Date:...............Sign.:……
Test E-stop (-……………) of the control panel (+F01) Date:...............Sign.:……
Test E-stop of ............................... Date:...............Sign.:……
Test E-stop of ............................... Date:...............Sign.:……

7.5 ON/OFF Main Circuit Breaker Function Test (Stator and Rotor)

7.5.1 Rotor Main Circuit Breaker Function Test


- ON/OFF Command Date:...............Sign.:……
- Hardware Over current Protection OFF-Command Date:...............Sign.:……
- Software Over current Protection OFF-Command Date:...............Sign.:……
- Emergency Stop OFF-Command Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

7.5.2 Stator Main Circuit Breaker Function Test


- ON/OFF Command Date:...............Sign.:……
- Hardware Over current Protection OFF-Command Date:...............Sign.:……
- Software Over current Protection OFF-Command Date:...............Sign.:……
- Emergency Stop OFF-Command Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 59
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

7.6 Earth Fault Protection

7.6.1 Rotor Protection

7.6.1.1 Rotor Earth Fault Supervision


Set the alarm and trip threshold values of the protection relay “IRDH 275-435” (use operating manual)

- Alarm 1 reference set point 100 kΩ Actual setting kΩ Date:…........ Sign.:……


…………...

- Alarm 2 reference set point 100 kΩ Actual setting kΩ Date:…........ Sign.:……


…………...

- Simulate an earth fault and check signal to PSR Date:…........ Sign.:……

Note: Simulation test by connecting the output converter “⊕ Bus” or “ Bus” to ground by a temporary.
2
Test cable (2.5 mm )……………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

7.6.1.2 Rotor Thermal Overload


Set the trip value of the overload relay
Current transformer ratio : 800A/1A.
Overload relay range : 0.4A – 0.63A.
Excitation current 425Adc or 347Aac. (Conversion factor is 0.817)
Recommended setting value : 130% nominal of excitation current.

130% × 347 Aac × 1A


Overload setting = = 0.56 A
800 Aac

- Adjusted value:.......................... Date:...............Sign.:……


- Simulate a thermal overload fault. Date:...............Sign.:……

Note: Simulation test by pressing the test button on overload relay………………..………..……………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 60
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

7.6.2 Stator Protection

7.6.2.1 Stator Earth Fault Supervision


Set the alarm and trip threshold values of the Stator protection relay “IRDH 275-435” (use operating manual)

- Alarm 1 reference set point 100 kΩ Actual setting kΩ Date:…........ Sign.:……


…………...

- Alarm 2 reference set point 100 kΩ Actual setting kΩ Date:…........ Sign.:……


…………...

- AGH to 204AK160 Actual setting Date:…........ Sign.:……


…………...

- Language to English Actual setting Date:…........ Sign.:……


…………...

- Simulate an earth fault and check signal to PSR Date:…........ Sign.:……

Note: Simulation test by connecting the output converter to ground by a temporary.


2
Test cable (2.5 mm )……………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 61
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

7.7 Hardware Protections


Stator over current protection
CS A463 Analogue Signal Supervision Unit (+A 09 / Tier: 06)

Check threshold voltage for stator over current detection Date:...............Sign.:


Set point for over current protection check cycloconverter design data

Î>>: Set point:.....................................6 400 A peak value


Îg: Rated Current................................3 164 A peak value

ΙHWLimit 6 x6400
U Th=6V× = =12.1380V
Îg 2x 2237

Analog Input U threshold [V] I>> [A] R2[k ] R3 [k ] Remarks


CSA463 Peak value
1 12.138 6400 300 15
2 12.138 6400 300 15
3 12.138 6400 300 15
4 12.138 6400 300 15
5 12.138 6400 300 15
6 12.138 6400 300 15

U2 =10V
10 kohm

Uk +

R3 -
R2 680 kohm

U Th
U1 =15.3 V 22 kohm
U k= =6.0690
2
1
k= = 0.020408 1
48 R2 // R3 = =14274.975
1+ 1 15.3V 1
Uk ⋅ −1 −
1+ 22kΩ U k (1−k ) 680kΩ
680 kΩ

Calibration of Time delay until fault detection Date:...............Sign.:


The time delay is set to t= 0.56 ms and is generated with a R-C circuit.
(RC- connection with a constant capacitor; C= 0.1µF)

t 0.56 ms
t =R⋅C R= = =5.6 kΩ
C 0.1µF

R = R 228; R 230; R 272; R 274; R 316; R 318 = 5.6 k

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 62
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
The time delay for circuit breaker is set to t= 700 ms and is generated with a R-C circuit.
(RC- connection with a constant capacitor; C= 1 µF)
t 700ms
t = R ⋅C R= = = 700kΩ
C 1000nF

Cv = C171 = 1 µF Ω
Rv=R353 = 680 kΩ

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 63
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

8 PSR2 Drive Protection Settings


8.1 General drive requirements:

Net voltage variations:


Nominal line voltage:..................V
Max line voltage:........................V
Min line voltage:.........................V
Nominal line frequency:.............Hz
Max line frequency:....................Hz
Min line frequency:.....................Hz

Ring motor requirements:


Minimum speed:.................... rpm
Maximum speed:....................rpm
Inching speed:........................rpm
Creeping speed:................... .rpm

Starting torque:................................IA / IN
Starting torque duration:..................s...............times per hour
Overload:.........................................%
Overload duration:...........................s

Frozen charge:
- Minimum speed for observing that material is cascading...................................rpm
- Ramping time to start the mill to that min speed.............….................................s
- Min. time to stay at this min speed after material was cascading….....................s
- Maximal angle where the material must cascade................................................°

Remarks:
.............................................................................................................................................................................
.............................................................................................................................................................................
.............................................................................................................................................................................
.............................................................................................................................................................................
..........................................................................................................................................................................

8.2 Stator and Thyristor Protection Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Stator over current fault
1 of ixR1, ixR2, ixS1, 1 S04 ix>-Limit
ixS2, ixT1, ixT2
Thermal overload of
2 thyristor for phase R – 1 S05 Constant
S–T

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 64
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
8.3 Excitation Protection Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Excitation over current Exci-Limit-
1 1 S06
fault Fault
Excitation under current
2 1 S06 Ie<-limit
fault
Excitation current iwe-
3 2 S27
reference limit max.lim

8.4 Network Protection Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Analogue input network
voltage Unet-R-
1 0 S07
Network under voltage Lowlimit
fault of phase R – S – T
Analogue input network
voltage.
Unet-Low-
2 Network voltage <95% 0 S07
delay6
for 60 seconds fault of
phase R – S – T
Analogue input network
voltage /UN/-Low-
3 0 S07
Network voltage <95% Limit
speed control limit.
Reading of GDB Card
4 Network over voltage 1 S06 Constant
>110%
Reading of GDB Card
5 Network under voltage 1 S06 Constant
<85%
Reading of GDB Card
6 Network voltage <95% 1 S06 Constant
for 60 seconds
Reading of GDB Card Frequency
7 0 S07
Over frequency fault -Hi-lim
Reading of GDB Card Frequency
8 0 S07
Under frequency fault -Lo-lim

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 65
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
8.5 Ring Motor Air gap Protection Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Alarm: Air gap no. 1
AGC-
1 and 2, Bottom side from 2 S29 % - - mm
Warn1
feed end view
Alarm: Air gap no. 3 – 4
AGC-
2 and 5, Right side from 2 S29 % - - mm
Warn1
feed end view
Alarm: Air gap no.6 and mm
AGC-
3 7, Top side from feed 2 S30 % - -
Warn1
end view
Alarm: Air gap no. 8 mm
AGC-
4 and 9, Left side from 2 S30 % - -
Warn1
feed end view
Fault: Air gap no. 1 and mm
5 2, Bottom side from 2 S29 AGC-Trip1 % - -
feed end view
Fault: Air gap no. 3 – 4 mm
6 and 5, Right side from 2 S29 AGC-Trip1 % - -
feed end view
Fault: Air gap no.6 and mm
7 7, Top side from feed 2 S30 AGC-Trip1 % - -
end view
Fault: Air gap no. 8 and mm
8 9, Left side from feed 2 S30 AGC-Trip1 % - -
end view

8.6 Frozen Charged Protection Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Maximum Torque Limit
Iw-DCP-
1 (Pickup value of 2 S34
Limit
protection)
Maximum Angle Limit
POLE-
2 (corresponding to 2 S34
NUMBER1
machine supplier)

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 66
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

8.7 Cycloconverter Cooling Protection Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
CT002, Internal cooling
cool-tmp-
1 temperature outlet B S04
cvout-A
“Alarm”
CT002, Internal cooling
cool-tmp-
2 temperature outlet B S04
cvout-T
“Fault”
CF001, Internal water cool-flow-
3 B S04
low flow “Fault” conv-T
CF001, Internal water cool-press-
4 B S04
low pressure “Fault” conv-A
CD001, Internal water cool-cond-
5 B S04
conductivity low “Alarm” A
CD001, Internal water cool-cond-
6 B S04
conductivity low “Fault” T
CL001, Internal water cool-level-
7 B S04
level low “Alarm” A
CL001, Internal water cool-level-
8 B S04
level low “Fault” T

8.8 Cycloconverter Current Control Phase R-S-T Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
1 Rectifier limit 1 S16 GR-limit
I-
P-Gain, Proportional
2 1 S16 CONTROL
gain
-R:kp
I-CONT-
3 I-Gain, Integration time 1 S16
R:T0/TN
I-
4 Multiplication factor KN 1 S16 CONTROL
-R:KN
I-
5 Multiplication factor K% 1 S16 CONTROL
-R:K%

8.9 Cycloconverter Speed Control Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Iw-Max-
1 Torque limit during start 2 S14
Start-Lim
Torque limit during Iw-Max-
2 2 S14
running Run-Lim
P-Gain, Proportional CONT-
3 2 S14
gain during start N:kp-start

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 67
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
P-Gain, Proportional CONT-
4 2 S14
gain during run N:kp-runn
CONT-
5 I-Gain, Integration time 2 S18
N:integ
6 Multiplication factor KN 2 S17 Constant
7 Multiplication factor K% 2 S17 Constant
Over speed forward Overspeed
8 2 S14
limit -forwar
Over speed reverse Overspeed
9 2 S14
limit -revers
Over speed
Overspeed
10 forward/reverse limit in 2 S14
-incCre
inching/creeping mode
Nx-
Speed actual
11 2 S13 manipulati
manipulation
on
Speed reference limit 1
Nw-
12 in Normal mode 2 S14
Anfahren
“Anfahren”
Speed reference limit 1
Anfahren-
13 in Inching mode 2 S14
Inching
“Anfahren”
Speed reference limit 1
Anfahren-
14 in Creeping mode 2 S14
Creep
“Anfahren”
Speed reference limit 2
15 2 S14 Nw-min
in Normal mode
Speed reference limit 2
16 2 S14 Nw-inching
in Inching mode
Speed reference limit 2 Nw-
17 2 S14
in Creeping mode creeping

8.10 Cycloconverter Low Speed Control “Phase Correction” Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
1 Speed Actual: 0% 1 S12 Constant
2 Speed Actual: 8% 1 S12 Constant
3 Speed Actual: 16% 1 S12 Constant
4 Speed Actual: 24% 1 S12 Constant
5 Speed Actual: 32% 1 S12 Constant

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 68
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
8.11 Cycloconverter Low Speed Control “Amplitude Correction” Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
1 Speed Actual: 0% 2 S05
2 Speed Actual: 8% 2 S05
3 Speed Actual: 16% 2 S05
4 Speed Actual: 24% 2 S05
5 Speed Actual: 32% 2 S05

8.12 Delta psi-T and Network Voltage >85%<95% Speed Control Limit Function

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
Speed limit at +Delta-psi-
1 2 S15
Del psi-T: 16% or -25% Lim5
Speed limit at +Delta-psi-
2 2 S15
Del psi-T: 14% or –20% Lim4
Speed limit at +Delta-psi-
3 2 S15
Del psi-T: 12% or –15% Lim3
Speed limit at +Delta-psi-
4 2 S15
Del psi-T:10% or -14% Lim2
Speed limit at +Delta-psi-
5 2 S15
Del psi-T: 0% Lim1
Speed limit at Unet-Limit-
6 2 S15
Network voltage 85% 85%
Speed limit at Unet-Limit-
7 2 S15
Network voltage 95% 95%
Speed limit at Unet-Limit-
8 2 S15
Network voltage 96% 96%
Speed limit at
9 2 S15 Constant
Network voltage 110%
Delta-psi-
10 Counter to limit speed 2 S15
count
Set point to unlock Speed-
11 2 S15
speed limit Reset
Iw-
12 Torque overload limit 2 S15
OverLoad
Converter output
TRAPEZ:
13 voltage high limit 1 S24
UPLIM
“Fault”
Converter output TRAPEZ:
14 1 S24
voltage low limit “Alarm” LOLIM

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 69
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
8.13 Cycloconverter Internal Calculation Settings

Physical
PSR Setting Time Delay Confirmed
No Description INT Segm Parameter Value
Value Unit Value Unit Value Unit Date Sign
PHASSHI
1 Phase shift 1 1 S12
FT:dt1
2 Phase shift 2 1 S13 Delta-T2
Phase shift 1 for low
3 1 S13 Delta-T3
speed control

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 70
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
9 Energizing Power Transformer

9.1 Energizing Excitation Transformer


The main circuit breaker of excitation transformer can be operated by command of PSR2 test program
no.1 at the control panel.
- Line voltage & MVD2 tested and available. Date:...............Sign.:……
- Protection & Supervision of the transformer must be tested and activated. Date:...............Sign.:……
- 24 hours energizing and check the temperature. Date:...............Sign.:……

Energizing Winding Oil Energizing Winding Oil


Time Temperature Temperature Time Temperature Temperature
at at at at
Hour Thermometer Thermometer Hour Thermometer Thermometer
Date Time on on Date Time on on
Transformer Transformer Transformer Transforemer
°C °C °C °C
1 13

2 14

3 15

4 16

5 17

6 18

7 19

8 20

9 21

10 22

11 23

12 24

Note: ………………………………………………………………………………………..………..……………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 71
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

9.2 Energizing Cycloconverter Transformer


The main circuit breaker of cycloconverter transformer can be operated by command of PSR2 test
program no.3 at the control panel.
- Line voltage & MVD1 tested and available. Date:...............Sign.:……
- Protection & Supervision of the transformer must be tested and activated. Date:...............Sign.:……
- 24 hours energizing and check the temperature. Date:...............Sign.:……

Energizing Winding Oil Energizing Winding Oil


Time Temperature Temperature Time Temperature Temperature
at at at at
Hour Thermometer Thermometer Hour Thermometer Thermometer
Date Time on on Date Time on on
Transformer Transformer Transformer Transformer
°C °C °C °C
1 13

2 14

3 15

4 16

5 17

6 18

7 19

8 20

9 21

10 22

11 23

12 24

Note: ………………………………………………………………………………………..………..……………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 72
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

10 Load Test “Rotor Circuit”

10.1 Start up Excitation Converter


- Download the relevant parameter settings. Date:...............Sign.:……
- Checked interface signal, Analogue input/output Date:...............Sign.:……
- Checked interface signal, Digital input/output Date:...............Sign.:……

Note: The current set point between PSR2 “Drive Controller System” and DCF500/600 “Excitation
Converter” is 0 – 10V = 0 – 900 A dc.

10.2 DC Current injection on rotor circuit.

For Testing the rotor circuit use PSR-FUPLA: “Drive Controller Software (PSR2)” Test program
No.: 1. The Set point for the Field can be adjusted with the Control Panel Board, with the keys
“Faster” and “Slower”. Adjust the current limit before switching on the Excitation Converter, which
is corresponding to the table below.

Adjust the current controller and make step responses, the step response can be done via DCF
Software. (More detail please sees at User’s Manual of Excitation Converter).

- Excitation Current Injection Tested. Date:...............Sign.:……

Current Current Calculated Measurement Measurement Analogue Digital


Limit in Limit in (A Set point DCF current clamp With Recorder meter Display
(%) dc) iwe ixe ixe ixe (AFC094)
of nominal of nominal “Analogue input (A) “Analogue input (A) ixe
Rotor Rotor on I/O board on I/O board (A)
current current UAC 326” UAC 326”
“PSR2 “Calculation” (V) (A)
Setting”
20%

40%

60%

80%

100%

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 73
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
- Record of Excitation DC Current Injection. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 74
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
10.3 Dis-excitation Function

Creating a dis-excitation pulse and checking the pulse length and pulse shape at the excitation over voltage
arrester by Hioki Recorder, check also the de-excitation current by a clamp-ampere meter and Hioki
Recorder. The pulse can be created by:

- “Main Circuit Breaker” OFF Command


- “Trip” Signal

T T = 200 - 1000 µs
48 V

- 18 V

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 75
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of de-excitation DC Current Injection. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 76
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
11 Synchronisation of Reference Voltage to Power

Connect the Reference voltage (Uref) via differential input to the hioki recorder.
Connect the cycloconverter input voltage via differential input to the hioki recorder.

Check the phase shifting between Uref at the GDB “Gate Control Units” input and Ucyclo, for all phases (R-S,
S-T, T-R), due to the vector group Dyn1 of the voltage detection device UUA 358, the cycloconverter input
voltage (transformer delta connection) should be 30° ahead the reference voltage. The cycloconverter input
voltage of the transformer star connection must be in phase.

If the 30° are not reachable, adjust the angle by the angle shifter FM9925a-E with its analogue input signal.
Adjustable with the PSR2 software parameter: ParamGrp_Angle-shifting

Descriptions Tested Date Name

Phase Shifting: Ucyclo 0° is leading Uref for 30° …………………….. ……………………..

Phase Shifting: Ucyclo 30° is in phase Uref 0° …………………….. ……………………..

ParamGrp_Angle-shifting:
“At INT:BACKGROUND\S10” ………………………… Degrees. …………………….. ……………………..

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 77
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of Phase Shifting Ucyclo 0° is leading Uref by 30° Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

……………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 78
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of Phase Shifting: Ucyclo 30° is in phase Uref 0° Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

……………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 79
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
12 Load Test Stator (without Excitation)
Sinusoidal current test:
For this current load test use test program No.: 3.

The PSR Software “Service Function” gives the different current reference values with the panel
display keys. The current reference can be limited with a PSR parameter setting for the amplitude of
iw (ParamGrp_SB: AMPL-UPLIM).
-Change test program to No.: 3
-Release the service box function by pressing F8 and F16 for 5sec
-Switch on the auxiliaries (F1)
-Switch on the main breakers (F2)
-Switch on the function “Iaw Man on” (F5)
-Select “amplitude” (F14)
-Push value> to adjust the amplitude set point (F4)
-Select “frequency”(F6)
-Push “Is-on” to release the pulses (F3)
-Push “value>“ to set the frequency of the current
-To block the pulses push “Is-off” (F11)

Load test of Sinusoidal Stator current (0 - 12 V): 6V ~ Îg (Îg =..............) Date:...............Sign.:……

Motor Current Current Bridge Current Measured Voltage of The Current Actual Signal Actual Actual
Phase set Limit Ref. Current Current
point (A (%) Value Current of 0° Current of 30° Clamp Analog.
peak) IwR** [max] Meter
[peak] At Meas. Calcu. At Meas. Calcu. (A) [rms]
(V)) (Input) (V peak) (A peak) (Input) (V peak) (A peak) (A)

RA
200 A
RB
RA
400 A
Phase RB
AI:…….. AI:……..
R RA
600 A
RB
RA
800 A
RB
SA
200 A
SB
SA
400 A
Phase SB
AI:…….. AI:……..
S SA
600 A
SB
SA
800 A
SB

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 80
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

Motor Current Current Bridge Current Measured Voltage of The Current Actual Signal Actual Actual
Phase set Limit Ref. Current Current
point (%) Value Current of 0° Current of 30° Clamp Analog.
(Apeak) IwR** [max] Meter
[peak] At Meas. Calcu. At Meas. Calcu. (A) [rms]
(V) (Input) (Vpeak) (Apeak) (Input) (Vpeak) (Apeak) (A)

TA
200 A
TB
TA
400 A
Phase TB
AI:…….. AI:……..
T TA
600 A
TB
TA
800 A
TB

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

……………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 81
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of Sinusoidal Current Injection 400 Amps. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 82
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of Sinusoidal Current Injection 800 Amps. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 83
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of the zero current during the bridge changing. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 84
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

13 Ring Motor Test


Put the drive Mode to E-House and activate Test program 0,
That is the PSR-Software under normal operation, (No Test Program) Date:...............Sign.:……
All Interlocks between PSR and PLC must be tested and healthy Date:...............Sign.:……

Connect Recorder to the relevant analogue signals, connect an ext. trigger signal e.g. (Sum. Fault Signal)

Start the Mill at the E-House Control Panel with minimum speed and take readings

Recommended measuring signals during starting:

Description Measuring Point


Nx, Actual speed “+A37” UA C326 Card / Analogue output 1
IxR1, Actual motor current phase R/0° “+A37” UA C326 Card / Analogue input 1
UxMR, Actual motor voltage phase R “+A37” UA C326 Card / Analogue input 7
Iex, Actual excitation current “+A37” UA C326 Card / Analogue input B
AGP6, Actual Air gap no. 6 “+A41” UA C326 Card / Analogue input 6
psi-x, Actual flux vector “+A41” UA C326 Card / Analogue output 6
psi ∝, Actual Flux Vector in ∝/β coordinate system “+A41” UA C326 Card / Analogue output 7
psi β, Actual Flux Vector in ∝/β coordinate system “+A41” UA C326 Card / Analogue output 8

Recommended measuring signals during running:

Description Measuring Point


Nx, Actual speed “+A37” UA C326 Card / Analogue output 1
IxR1, Actual motor current phase R/0° “+A37” UA C326 Card / Analogue input 1
UxMR, Actual motor voltage phase R “+A37” UA C326 Card / Analogue input 7
Iex, Actual excitation current “+A37” UA C326 Card / Analogue input B
U∝, Firing angle control phase R/0° “+A57” GD B021 Card / U∝ output
psi-x, Actual flux vector “+A41” UA C326 Card / Analogue output 6
psi ∝, Actual Flux Vector in ∝/β coordinate system “+A41” UA C326 Card / Analogue output 7
psi β, Actual Flux Vector in ∝/β coordinate system “+A41” UA C326 Card / Analogue output 8

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 85
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
13.1 No Load Test
- Record of mill starting with no-load. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 86
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of mill running with no-load. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 87
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

- Record of mill starting with a heavy load. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 88
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

13.2 Load Test


- Record of mill running with a heavy load. Date:...............Sign.:……

Note: ………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………….

…………………………………………………………………….

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 89
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

14 Final Work
Change all Software - modifications made for testing back to original Date:...............Sign:
Change all Hardware - modifications made for testing back to original Date:...............Sign:
Remove jumpers and toggle switches Date:...............Sign:
Check schematic diagram (red-blue) modifications complete Date:...............Sign:
Disconnect all test cables Date:...............Sign:
Clean all the Panels / E-House Date:...............Sign:

PSR-Software Back-up / Path:.......................................................Date:................. Date:...............Sign:

DCF-Software Back-up / Path:.......................................................Date:................. Date:...............Sign:

PLC-Software Back-up / Path:.......................................................Date:.............…. Date:...............Sign:

VMS-Software Back-up / Path:......................................................Date:................. Date:...............Sign:

Photos / Path:…………………………………………………………………………….. Date:...............Sign:

Loading all Software Back-up to the network


Path:........................................................................................................................ Date:...............Sign:

................................................................................................................................. Date:...............Sign:

................................................................................................................................. Date:...............Sign:

................................................................................................................................. Date:...............Sign:

................................................................................................................................ Date:...............Sign:

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 90
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System

15 Attachment logbook.

15.1 Hardware Modification log book.

Reference Removed

Temporary

Permanent
Change

Change
No. Description Drawing no. Page Date Sign Date Sign.

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 91
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc
Commissioning Report
ABB Switzerland Ltd GMD System
15.2 Software Modification log book.

Reference Removed

Temporary

Permanent
Change

Change
No. Description INT Segment Date Sign Date Sign.

Title Project
Primary Sulfide Project
Commissioning Report GMD System Equipment
“Part A” BALL MILL 3 / 12 MW
Document identity Lang. Rev. ind.
Sheet 92
ABB Switzerland Ltd 3BHS 215357 E 0
No. of
sheets 92
File: 3BHS215357_Commiss Report Cerro Verde GMD_BM3_PartA_rev0.doc