You are on page 1of 1

DOKMOKA U/S LORINGTHEPI

74500
D/S

74600
CLIENT: AUTHORITY ENGINEER : EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE : DRG. NO. CIPL/D1045/STR/BC/DWG/74+596/001
Widening/Improvement to 4 (Four) Lane with Paved
Shoulder fromkm 66+000 to km 81+000 DRAWING OF BOX CULVERT
R1 JUNE. 2021 AS PER AE. COMMENTS (Design Chainage 65+923 to 80+930) of Dokmoka – CH:74+596 DATE : JUNE - 2021 REV: R1
LoringThepi Section (Section 3) of NH-29 in the
MAR 2021 FOR APPROVAL DESIGNED DRAWN CHECKED APPROVED
R0 state of
NATIONAL HIGHWAYES AND INFRASTRUCTURE HINDUSTAN CONSTRUCTION & EARL TECHNO CONBULTANTS PVT/LTD
SKYLARK INFRA ENGINEERING PVT.LTD. CIVIL MANTRA INFRACON PVT.LTD. Assam under Bharatmala Pariyojna on EPC mode. RK SP GS SM
REV DATE DESCRIPTION A B C D DEVELOPMENT CORPORATION LIMITED. INFRASTRUCTURE CONSULTANTS SCALE : AS SHOWN PAPER SIZE : A3

You might also like