You are on page 1of 36

1

ts
o n ten
C

00 About me

Title of work Advisor List

X
01 桿件構築的可拆卸性
Reversibility of rod constrcution Adivsed by 曾韋翔 01

Y
02 高層建築藝術性思考
The tall building artistically considered Adivsed by 戴祖亮 14

Z
03 尼泊爾雪巴育幼院 ( 逢甲小書屋 )
Nepal Sherpa Children home
與王銘鴻建築師事務所
Design with WAA studio 20

X
04 寂者之家
House lonesome Adivsed by 莊志遠 24

Y
05 礁與時 / 落成
Pavillion : Reef / Pavillion : Foliage Adivsed by 莊志遠 / 陳秀珠 28

Z
06 日日書局
Day by day bookstore Adivsed by 陳秀珠 30

3
ME
UT
ABO

江泓陞
Hong Sheng, Jiang
1998.10.18

College senior in FengChia University


School of Architecture

johnhao1018@gmail.com

Interest | Graphic Design , Photography , Reading , Movie

4
Education Architectural Skill

西螺農工 2015-2017 practised Photoshop, Illustrator, Indesign,


(National Siluo Agricultural After effects, Autocad, Rhinoceros,
Industrial High School) Corona render, Microsoft Word, Excel,
Powerpoint
逢甲大學建築專業學程 2017-
(Department of Architecture of fundamental Revit, Grasshopper, Sketch up, 3Dsmax,
FengChia University ) Houdini, Solidworks

Intern Publish

王銘顯建築師事務所 2019 Summer | 7-8 RE- 逢甲大學建築系 2020-2021 實驗性構築 2021


(Ming-Hsien Wang Architects & Associates) 組作品合集 _ 總編輯
(RE-) editor in chief
王銘鴻建築師事務所 2020 Summer | 7-8
(Ming-Hung Wang Architects & Associates)

Experience

院學會文書部副部長 2019
(Vice Director of Student Association
of Artistic Design Department)

畢委會畢刊部副部長 2021
(Vice Director of Student Association
of Artistic Design Department)

Workshop

築巢 - 兒童建築與空間體驗營 _ 領隊 2018
(Buildthenest - Children's Architecture
and Space Experiencing Camp_Tour Escort)

彎折面材工作營 2020
(Bending Sheet:Topological Penetration
And Fabrication)

111 年度教育部藝術與設計菁英
海外培訓計畫工作營 2021
(MOE Scholarship Program for Overseas Study
in Arts and Design)

Award

遠東建築新人獎入圍 2018
(FarEast Architecture New talent Award
Nomination)

5
4th GRADE | 2021
01 桿件構築的可拆卸性
寂者之家
REVERSIBILITY OF ROD
HOUSE
CONSTRUCTION
LONESOME

Construction could change from an industry that extracts, transports, uses,


and disposes of materials to a service industry that cares for living materials
—Christoph Küffer , The Material book

+372 +372

Design
+276 +276
Process

Material Connection

-concrete -bolts
+180 +180
-timber -steel plate

-steel -Tensioning straps


Deconstruction

-bamboo -3D printer

+101 +101

Existing building stock Buildings

-open building design


+1 +1 GL
-quantification -modular grid
+0 +0

-quality of embodied -seperate system 281.74 281.74


materials
-etc.

Construction

Albert Einstein once proposed the "theory of relativity". The contemporary thinking about the architectural cycle is
By assuming that our mindset and actions will be still solidified. People are always anxious to see the finished
questioned, if we alter the Hypothesis, the corresponding side of things; instead, the "process" of forming is the thing
logic will be changed accordingly. that needs to be discussed the most.

Today about 50% of the world's resources are Therefore, the design process of contemporary architecture
consumed by the construction industry and account must include thinking about how to maintain the quality
for 35% of the waste produced. People seem to be and robustness of materials into the next cycle to continue
responding to the consumption of environmental this circular economy thinking, for surviving in the era of
resources.The consideration of periodicity of materials resource depletion.
has also become a major consideration in design.
The so-called "sustainability" should have moved
away from the traditional regulatory-compliant"green
building"thinking, through the discourse and practice of
DFD (design for deconstruction) , Re-material-ization has
become the issue that today's architectural designers
concern.

6
Finding the possible of re-materialization

Through the research of "physical bonding", we In the second test, we progressed to the three-
try to bond the hornbeam physically . Since most dimensional composition.In the case the size are
of the assembly methods of wood (drill,joggling) different from the previous one, the objects we
will directly damage the fiber of the material itself. experiment with must be selected precisely.The
I searched for an object within my reach as the experiment was conducted with two different
object to study. sizes of elastic hooks and it requires two people
working together during the experiment to
Firstly, we imitated the structure of the people's stabilize the structure.
pavilion and made a two-dimensional mini-
model, using the rubber bands as our bonding After this experiment, we felt the need to
object, the friction of the wood will interact with experiment with other material possibilities, new
the binding force of the rubber band, making the assembly method, and to challenge non-vertical
model as a structure form with limited flexibility horizontal forms of construction to achieve the
and disassembly. After the records by video and level of material "transcendence".
photo, we can see exactly how they looked after a
week of testing.

7
Material compatibility Material compatibility Material compatibility
Test-A Test-B Test-C

Stainless steel wire + 304 Stainless steel Fully-Threaded Spring wire +


round transparent acrylic tube Bolts + Galvanized steel cable+ Hot shinkable sleeve
Cable Clamp + Copper Sleeve

In this experiment, the main purpose According to the strength of steel wire, In the Test-C we used Spring steel wire
was to test the bending of the metal the strength of steel wire is quite high as the rod material. Using its elasticity
within its elastic limit. I used The . Steel wire is mostly heat treated or and the thin geometry of the wire, we
highly elastic acrylic tube as the cold worked to achieve high strength. experimented with a heat shrinkable
cladding material, and the highly After wire weaving, steel wire manifest sleeve as a physical joint to attach
formability white iron wire is the main a flexible and bendable material a frictional force on each wire. The
molding material, manifesting the behavior. friction at these nodes allows the wire
interplay between white iron wire to deform within its limits of elasticity.
and the acrylic tube. The aim is to In the Test-B, the steel cable provides
experiment the possibility of joining strong tension to deform the bolts
different materials and geometric elastically, and the bolts will return to
compatibility. its original shape when the cable is
released.

Test-A Test-B

Test-C

8
Bamboo slices
High Carbon
Steel

Mechanical properties
Medium Carbon Steel

Low Carbon Steel

Cast Iron

STRESS
由 Autodesk 由 由 由 由 由
Plastic

The mechanical properties of a material manifest


the relation between the material and its STRAIN

deformation under stress. Strength, hardness,


ductility and elasticity are some of the mechanical
properties

The common mechanical properties of metals


are elasticity, stress, strain and strength, of
which there are eight different types of strength
depending on the way the force is applied.
Therefore, in our search for a suitable material for
rods. The tensile strength, yield strength become
the criteria to determine the metal or other
suitable material.

The criteria of material selection must be easily


bend and able to resist strong bending, at the
由 Autodesk 由 由 由 由 由

same time not easily achieve the yield point. After


screening, the mechanical properties of the high-
carbon steel and bamboo match the design
requirements.

Fiber

In the selection of materials, we compare each The cost of standardization is also a major issue. The solid nature of
material characteristics of wood and bamboo, like the processed wood will makes it easy to process, in terms of volume
bamboo, the material organisation is composed comparison or the material itself. Defects and product stability during the
by long linear fibrae, providing the material high normalization process will be more controllable than the initial state of
tensile performance, great flexibility and resilience, the bamboo. The outer layer of the skin of the bamboo will be ground off
由 Autodesk 由 由 由 由 由

which cannot be found in wood. Besides that, Asia after it is processed into bamboo sticks. Though some of the skin has been
is the world's bamboo production area, accounting removed in the process, it still maintained its great flexibility and bending
for about 90% of the total, so wood is more often resistant than wood because it is mainly composed of "bast fiber". Thus,
used in the construction industry than bamboo. we chose bamboo as one of our rod material.

9
Tower A Model 1:3 In this operation of structure, the main
issue we want to operate is "provisional
construction" and we have continued
the structural thinking of DFD (Design
for Deconstruction), from the selection
of materials, method of assembly, form
finding, and the quality of embodied
materials, as the key points to be
considered in the design.

Tower A is the first structure we built,


using 2mm bamboo rods and 2mm
spring steel wires as the material for small-
scale simulation. The objective of this
construction is to understand the physical
properties of the material, the relationship
between the rods and joints, the strain
conditions, and try to find the logic of
vertical development from its materiality.

Column A Model 1:1

From the 1:3 prototype of Tower A, we used Tower A's construction logic as a
reference, and changed from 9 directions to 3 directions for the real construction,
trying to find the possibility of the vertical construction and face its authenticity.
The material was adjusted to 1:1 according to the ratio of Tower A. The size of the
bamboo rod was replaced by 2mm and 5mm, and the spring metal rod was replaced
by 2mm and 4mm, and the connector was also changed from the heat shrinkable
sleeve and strap to the standard customizable solid printing connector.

10
Material Joint System

Bamboo stick
2mm;45cm Nylon Cable Tie
1:3
TE Connectivity Raychem
Cable Protection
Spring wire Electrical tape
2mm;45cm

Bamboo stick
5mm;120cm
1:1 Nylon Cable Tie
PLA(Polylactic Acid)
Spring wire 3d printer Photosensitive resin
4mm;120cm FLEXIBLE TPU

11
Tower Cocoon Model 1:1

In this project, we try to find out the possibility of


three-dimensional forming of the rod, avoiding
the flat and three-dimensional forming as in
Tower A. Therefore, we propose the Tower
Cocoon, which uses a circle surrounded by
bamboo rods as the boundary of the layering.
With the binding force of the circle, the size of the
circle can be freely set and determine the shape
of the tower.

The parametric software Grasshopper was used


in the form-finding and attempt to simulate the
materiality and possibilities of the rod. Tower
Cocoon tries to provide a spatial possibility
for the rapid transport and reversibility of the
stem construction in the field of temporary
architecture.

三頭式接頭
Three-headed connector
Tower Cocoon Numbering 四頭式接頭+束環
Four-headed connector+Strap

兩頭式接頭 connector
Two-headed 交叉式接頭
Crossed connector+Strap
束帶
Strap

四頭式接頭+束環
Four-headed connector+Strap

四頭式接頭 connector
Four-headed

12
Joint Ver.2

After constructing TowerA, we take a complete


review on the design of joint, and summarize
several problems. 1. the vertical intersection
is too long, resulting in easy damage from the
compression force. 2. the offset width of the joint
is too small, so that the joint is easily damaged. 3.
the crossed joint is more easily damaged by split
molding than by one-piece molding.

After solving the above issues,we create the


second version of the connector. besides to the
two-headed joint, we have abandoned all the
jointing method and replaced it with a flexible
and tough light-curing element that is put at each Joint_2
四頭式接頭+束環
Joint_3
四頭式接頭+束環
Joint_4
end of the rod, trying to secure it by friction. Four-headed
三頭式接頭 Three-headed
交叉式接頭 Crossed
交叉式接頭

兩頭式接頭

束帶

四頭式接頭+束環

四頭式接頭

DLP(UV Resin) / FDM(Material Extrusion) / DLP (Elastic Resin)

During the construction cycle of this structure, the PLA is one of the material for FDM 3d printer,
rods are all secondary processing products which which has lower precision in printing than
are standardized, and allowed to be replaced stereolithography, and it is easier to have
and customized.The connectors, which are the uncontrollable conditions.In the test printing
connecting ends, also need to be standardized of Stereolithography, we found that elastic
before they can enter the construction cycle. As photopolymer resin and standard UV
mentioned on the previous page, the joint unit photopolymer resin have their own characteristics
must be precise and integrated, so CAM (Computer- and disadvantages respectively.
aided manufacturing) will be our process direction Elastic photopolymer resins are quite flexible
in manufacturing. after curing and it clings to the rod by generating
friction, but they are less tough and can be brittle
After analyzing the advantages and disadvantages, when put excessive force on it. In the other hand,
we chose 3D printing as our process tool. First, we UV resin is harder but not flexible. According to
experimented different 3D printing processes and the characteristics of these two materials, we let
materials to compare. The printing process were them show their characteristics separately. The
FDM (Fused deposition modeling) and DLP (Digital components printed by UV resin are used as the
light processing), and the materials were PLA, main body of the connector, while the components
standard UV liquid photopolymer resin, and elastic printed by elastic photopolymer resin are used as
liquid photopolymer resin. the sleeve unit to assist joint in fixing.
13
3rd GRADE | 2019
02 高層建築藝術性思考
寂者之家
THE TALL BUILDING ARTISTICALLY
HOUSECONSIDERED
LONESOME

02 01 07

MacBook Pro

Evolved from the small space of countinghouse to the factory model of


complete efficiency to today's office cultures. Office culture is a utopian
evolution, where people specialize in how to optimize capital and efficiency
through space and appliances.In Taiwan's employment environment, to
manage and control easily, many offices still have separate offices and cubicle
systems with a factory-type culture. In 2020, People are being forced to get
used to a new office culture. Working from home, showing the popularity of
remote offices, the gradual disappearance of architectural forms, the future
office is destined to be more flexible and personalised.

"Multizoned Office" is a new type of office, meaning that in the case of partial
openness, the company will provide additional individual office seats for
employees to concentrate on, so that employees also have the option to
temporarily detach themselves from the workspace, allowing the "Multizoned
Office" to regain the sense of security lost in the open office.

The demands of the labor culture of each era are adjusting the way people
interact with each other, the way they are managed, and how power is
distributed. As we move through the millennium, when mobility and
openness are becoming the trend, I believe that dividing up space with a
balance between efficiency and rights creates the best performance in the
14 office and provides a flexible and mobile space for employees.
Shared
Open
Semi-Open Plan

Closed Cluster

Multizoned Office

FUNCTIONAL  OVERLAY

Facilities Facilities
Hotel Office

Bath Shower room

Private Area

Private Area
Conference Exercise room

Restaurant Restaurant

Gym Gym

Lobby Open Area

Rooms Persornal Seats

Staff Room Conference

Server room

Ornamantal Shared Public

"The tall building artistically considered" written in Hotel. A place for people to stay for a period of time. It is a dwelling
1896 by Louis Sullivan indicate that contemporary space with a relatively high mobility. In addition to providing a
high-rise buildings have shifted from the technical to private space for the guests, after the 20th century hotels gradually
the artistic level of thinking. Then I started to study began to pay attention to the quality of the public areas, so that
in Seagram building by Mies van der rohe, The plan the public areas of hotels have gradually become the main part of
is symmetric with 8.5m grid structure, separating hotel.My design aims to functionally overlap the public spaces from
the exterior facade from the interior. Facing the city, hotels and the public space from the open office system, including
bronze I-beams are used on the exterior facade, sports spaces, shower spaces (swimming pool) and open social
and the I-beams serve no stuctural purpose. As spaces and public shared office spaces.
decoration, it tries to articulate the building itself
through the exterior facade. The lift creates a vertical shift. My plan uses two cores as the main
transportation medium of the building, serving each private space
Here, I try to liberate the vertical, horizontal interface of the hotel and the office (e.g., individual seating areas, hotel
of the high-rise. The bracing system, which was rooms), and dividing the intersecting space vertically in a three-
originally structural, becomes a decoration here, story unit. With the superposition of functions, the space will not be
detaches itself from the internal structural system wasted in today's excess office space and will be able to respond to
and becomes an external interface, presenting both the high mobility of the company.
structural vision and surreal state.

Volume

Core Loft Merge Intersection Void Mount Shaped

15
dn

PUBLIC PUBLIC PUBLIC


STUDIO STUDIO STUDIO

dn 共用工作坊 共用工作坊 共用工作坊

UP
DN

DN
DN UP
DN
UP UP

PLAN 1F 1:400

UP
DN

DN
DN UP
DN
UP UP

PLAN B1F 1:400

UP
DN

DN
DN UP
DN
UP UP

PLAN B2F 1:400

16
UP
DN
UP
DN

DN
UP
DN DN
UP DN
UP UP
DN DN
UP UP

OFFICE+HOTEL
PLAN 6F 1:200

UP
DN

UP
DN
UP
DN

DN
UP
DN DN
UP UP

DN
UP
DN DN
UP DN
UP UP
DN DN
UP UP

GYM + LOUNGE
PLAN 11F 1:200

UP
DN

DN
UP
DN DN
UP UP

BATHHOUSE+OFFICE+HOTEL 17
PLAN 12F 1:200
SECTION B'-B" 1:500 SECTION A'-A" 1:500

共用工作坊

18
19
3rd GRADE | 2019-2020 80
14
60
14
03 尼泊爾雪巴逢甲小書屋
寂者之家
Cooperated with WAA NEPAL SHERPA
HOUSE
CHILDREN
LONESOME
HOME

0
8
4
1

0
2
4
1

Kathmandu

The deep eaves are designed to provide shelter from the rain
and sun, but create a light architectural style.。In the history of
Nepalese architecture, as Nepal entered an era influenced by
globalization, the status of traditional architecture gradually
receded and was replaced by a neo-classical palace architecture
of the Rana period and the localized modernist architecture.
Thus, the status of complexity and heterogeneity in today's
Kathmandu is similar to Taiwan's streetscape.

With the situation that i cannot be there and only a few live photos,
Context I started to research the local history of Kathmandu, Nepal, the
local architecture, and the challenges of traditional and modern
architecture. Then I tried to extract elements from Newar architecture
for development.

Thinking At a time when traditional


Spatial requirements
architecture is being revived
and surrounded by modern
reinforce concrete buding, we
should interpret those traditional
Bed At least 24 beds Localization
element in a new framework,
instead of completely borrowing
from traditional architecture.

2 separate bathrooms for


Bath male and female
As there has the rainy season in
Kathmandu, single-pitched roofs
are commonly used as the main
roof form. ①
Amount of indoor
lighting After discussion, the structure
Earthquake-resistant will be mainly steel structure and
the roof will be wood structure.
The reason why we chose wood
A learning stairs and study as one of the materials in the
Public space room required building is because of its strong
dynamic loads that can resist
earthquakes very well.

The users were mainly orphans


Symbolic displaced by the earthquake,
and "shelter" was the image we
wanted to create, so we created
a symbolic roof in the shape of
20 a house.
40
Bathroom
14
Living

20
14

00 Self-Study room
14

Bathroom

80
13

Living room Library


+
Disscussion
Open space Area

Restaurant
13
80 Hallway

Watertank

13
60
SITE LOCATION : Dharmasthali Ward No.4, Kathmandu
AREA : 160.1416 m2
BUDING COVERAGE : 70%

Element #1

① Typical Newar house type

A traditional Newar-style building is divided by a central load-bearing wall into two


spaces, one facing the interior and one facing the exterior. In this case, I designed a
book wall to divide the servant and service spaces replacing the load-bearing wall that
we no longer needed, creating an interface between the spaces.

Element #2

② The public house (pati)

Pati/Sattal is a type of public rest house in the Newar neighborhood of Nepal.


It is used by the locals as a community hub, located from neighborhood to
neighborhood, where locals rest and socialize, and as an emergency shelter during
earthquakes.

21
Plan 1F Plan 3F

From the sketch to plan to the house

Plan 4F

22
perspective

Section

23
1st GRADE | 2017
04 (2017 FarEast Architecture New
寂者之家
talent Award Nomination) HOUSE LONESOME

In this project, the thesis required of casestudy


an architect and then develop a forming method
to create a building with my own translation in
architectural language.
And UNStudio is the architect i chose.

Starting from the development of the form,


I found that UNstudio has incorporated the
concept of temporality into the form, whether
the 24 hours of action can form a cycle then
organize volumes into a circular space.

24
cross-section

Model perspective

25
Plan Drawing

DN

DN

UP

UP

1F PLAN

N
2F PLAN N

1:500 1:500

0 2m 10m 0 2m 10m

DN

DN
UP

3F PLAN N
4F PLAN N

1:500 1:500

0 2m 10m 0 2m 10m

26
27
1st GRADE | 2017
05 寂者之家
礁與時
HOUSE
PAVILLION
LONESOME
: REEF

polypropylene board(P.P)

The Pavillion design specifies the use of the polypropylene panel as the
main material, which is a sandwich material on either side of the panel
with a vertical support, resulting in a high degree of rigidity.I try to find
a way to break the vertical and horizontal composition of this surface
material, also breaking the imagination of people on the material. I use
two cutting lines to split the discontinued short part and the continuous
long part. If the short part is connected by joints, the unit will be slightly
bent from the pressure on the board surface. Through this little bent, I try
to assemble an irregular and enveloping space. Through the restrictive
force and connectivity of the unit assembly, it generates its supportiveness.

28
2nd GRADE | 2018
05 寂者之家
落成
PAVILLION
HOUSE LONESOME
: FOLIAGE

In second grade, we have another Pavillion


design, using polypropylene board as the main
material again. This time I wanted to challenge
the materiality of the board surface. The
polypropylene board is composed of two layers
of plastic plates, and when light penetrates and
overlaps with different transparency, it provides
an interface that blurs the light like a leaf surface,
and the vertical support material also provides
support for the surface material like a leaf vein.

29
2nd GRADE | 2018
06 寂者之家
日日書局
DAY BY
HOUSE
DAY BOOKSTORE
LONESOME

Original structure system Wing wall system reinforce original The origin staircase is the core
structure. And reduce the small of the building , showing an axial
beam, creating core space relationship with the main door

Beam Frame Structure Core Sunlight Shape Loft Extract Adaptive Connect
and the skin disffuse space framework subdivision points

This project aimed to renovate an abandoned teacher's dormitory, which limited


to the function of a bookstore. The dorm is situated next to an alley leading to a
small community, and there is a wall surrounding the building. I tried to liberate this
corner space and make it a new public space shared with the community.

30
31
32
N

site plan

Book storage
space

Restaurent

Light
Tower

Personal
Reading Zone

Bar

33
PUBLICATION
07 RE - 實驗性構築組作品集
RE- EXPERIMENTAL TECTONIC STUDIO
HOUSECOLLECTION
LONESOME

Full ver. e-book

Re- is the key word that can summarizes this two-


semester studio. As a media for exhibiting our
Experimental Tectonic projects. We have shrunk
the page size to A5, in order to streamline the size
of the words and images, and trying to simplify the
amount of information contained within a page to
clarify the steps of our research .

34
36

You might also like