Sr . No.Structure EL Upto Work Done Certified SECC
12 Dia 16 Dia 25 Dia 32 Dia Total Claimed Diffrence Remarks
Left Bank
1 Pier -1 146 4.16 68.61 143.91 216.68 203.42 -13.26
2 Pier -2 146 2.64 68.32 145.11 216.07 199.84 -16.23
3 Pier - 3 139.3 1.88 47.51 126.86 176.25 174.77 -1.48
4 Pier -4 143.9 2.53 61.04 141.45 205.01 207.30 2.29
5 Pier - 5 130 1.24 41.53 94.90 137.67 142.67 5.00
6 Pier - 6 130 0.78 33.75 69.74 104.27 105.98 1.71
7 Pier - 7 130 0.49 31.14 69.05 100.68 105.52 4.84
8 Pier 8 & 9 130 0.34 5.33 88.61 265.77 360.04 368.29 8.25
9 Left Abutment U/s & D/s 146.50/146 1.29 81.24 13.85 96.38 94.001 -2.38
10 Left Bank FOW U/s Complete 31.50 0.00 0.00 31.50 27.647 -3.85
11 Left Bank FOW D/s 137 4.85 0.17 0.00 5.02 5.531 0.51
Stilling Basin & Bay Left Side
12 (Excluding Bay 4 Top Mate) 12.11 300.98 0.13
336.35
Rock Anchoring for Left Side Stilling
13 Basin 0.00 0.00 23.13 337.58 1.23
Dia Wise Total 0.34 68.79 822.90 1093.89 1972.55
Bank Total 1985.92
Right Bank
Reinforcement on
Hold for Lift 143.90 to
146.00 as Concrete
1 Pier -15 143.9 2.50 65.69 152.80 220.99 227.80 6.81 not Completed
2 Pier -14 143.9 2.50 65.14 157.60 225.24 225.36 0.12
3 Pier -13 143.9 2.50 72.66 169.28 244.44 243.90 -0.54
4 Pier -12 132.4 1.51 52.32 118.10 171.92 171.96 0.03
5 Pier -11 130 42.31 90.13 132.44 131.60 -0.84
6 Pier -10 130 0.78 30.87 71.62 103.27 103.25 -0.01
7 Right Abutment U/s 145.5 1.39 36.45 5.15 42.99 36.89 -6.10
8 Head Regulator Footing 141.5 12.19 48.28 2.10 62.57 95.19 32.62
9 Right Abutment d/s 146.5 18.71 18.71 13.93 -4.78
Right Abutment U/s & D/s 130/133.5 45.46 11.5 56.96 56.96 0.00
10 RB FOW U/S Section 1 137 5.99 5.99 6.66 0.67
11 RB FOW U/S Section 2 134 4.40 4.40 5.01 0.61
12 RB FOW U/S Section 3 127 2.21 2.21 2.24 0.03
13 RB FOW U/S Section 4 131.5 4.82 4.82 4.90 0.08
14 RB FOW D/S Section 1 134.5 6.05 6.05 5.34 -0.72
10 Right Abutment U/s & D/s 124 130.00/133.2 45.46 11.5 56.96
10A Head Regulator Footing 139 141.5 12.19 48.28 2.1 62.57
10B Right Abutment U/s
130 132.4 0.263 4.49 1.36 6.11
132.4 134.7 4.94 1.36 6.30
134.7 137 0.18 4.93 1.36 6.47
137 139.4 0.17 5.87 1.07 7.11
139.4 141.5 0.21 6.72 6.93
141.5 143.8 0.21 5.72 5.93
143.8 145.5 0.36 3.78 4.14
10C Right Abutment D/s 133.2 146.5 18.71 18.71
Structure Total 181.23
11 Right Bank FOW U/s
11A RB FOW U/S Section 1 123 137 5.99 5.99
11 B RB FOW U/S Section 2 123 134 4.40 4.40
11 C RB FOW U/S Section 3 123 127 2.21 2.21
11 D RB FOW U/S Section 4 123 131.5 4.82 4.82
Structure Total 17.43
12 Right Bank FOW D/s
12A RB FOW D/S Section 1 123 134.5 6.05 6.05
Structure Total 6.05
SEECPL Left Bank Grand Total of Reinforcement Upto 01/07/2016
Sr. No Description From EL To EL 12 Dia 16 Dia 25 Dia 32 Dia Sub Total Remarks
1 Pier -1 139.3 3.14 53.31 119.69 176.14
139.3 141.6 0.28 5.94 9.03 15.25
141.6 143.9 0.28 4.95 8.83 14.06
143.9 146 0.46 4.41 6.36 11.23
Structure Total 216.68
2 Pier -2 132.4 1.23 38.68 82.85 122.76
132.4 134.7 0.13 4.56 11.82 16.51
134.7 137 0.13 4.56 11.82 16.51
137 139.3 0.13 5.22 13.58 18.93 1.078
139.3 141.6 0.28 5.94 10.85 17.07
141.6 143.9 0.28 4.95 7.83 13.06
143.9 146 0.46 4.41 6.36 11.23
Structure Total 216.07
3 Pier -3 130 1.16 28.61 75.91 105.68
130 132.4 0.33 4.56 11.82 16.71 0.506667
132.4 134.7 0.13 4.56 11.82 16.51
134.7 137 0.13 4.56 13.73 18.42 40
137 139.3 0.13 5.22 13.58 18.93 174
Structure Total 176.25
4 Pier -4 130 1.2 30.75 71.59 103.54 180
130 132.4 0.33 5.06 11.96 17.35
132.4 134.7 0.18 4.56 11.82 16.56 32.45
134.7 137 0.13 4.56 15.50 20.19 162.25
137 139.3 0.13 5.22 12.54 17.89 625.3115
139.3 141.6 0.28 5.94 10.85 17.07
141.6 143.9 0.28 4.95 7.19 12.42
Structure Total 205.01
5 Pier 5 0.78 31.91 70.89 103.58
130 132.4 0.33 5.06 12.19 17.58
132.4 134.7 0.13 4.56 11.82 16.51
Structure Total 137.67
6 Pier -6 130 0.78 33.32 69.74 103.84
Shear Zone 0.439 0.44
Structure Total 104.27
7 Pier -7 130 0.49 30.72 69.05 100.26
Shear Zone 0.42 0.42
Structure Total 100.68
8 Pier 8 & 9 (Zone 1) 130 0.82 41.37 103.42 145.61
Pier 8 & 9 (Zone 2) 128.5 28.42 77.43 105.85
128.5 130 2.03 8.3 10.33
Pier 8 & 9 (Zone 3) 130 0.34 4.51 16.79 76.62 98.25
Structure Total 360.04
Reinforcement used for
9 mould casting 1.426 1.43
10 Rock Anchoring for Right Side Stilling Basin 23.13 23.13
11 Stilling Basin and Bay 12.11 300.98 0.13 313.22
1250
8250 25 250 35 1 35 18.100 633.50 0.000 2.439 0.000
6500
Main Reinforcement Provided
on upstream 850 8.25 5.5 6.75
SD 1250
7500
25 250 17 1 17 8.750 148.75 0.000 0.573 0.000
Side Distribution rod Provided
from U/s End to 0.00 33 132
1250
7600 25 250 18 1 18 13.450 242.10 0.000 0.932 0.000
Main Reinforcement Provided 5000
on upstream from Chainage
19.90. to 24.40 850 7 18
1250
1250
6750 25 250 166 1 166 11.100 1842.60 0.000 7.094 0.000
Main Reinforcement Provided 3500
on upstream from Chainage
24.40. to 64.40 850 6.75
Side Distribution rod Provided SD1 64.40 + 6 Laps 25 250 23 1 23 71.500 1644.50 0.000 6.331 0.000
from U/s End to 0.00 TO 64.40
FROM EL 123.00 to 128.50 0.75 22
Side Distribution SD 64.40 + 6 Laps 25 250 14 1 14 71.500 1001.00 0.000 3.854 0.000
Reinforcement Provided in
Slope Section & Bottom 6.375 40
Side Distribution SD 22.150 + 1 Laps 25 250 6 1 6 23.400 140.40 0.000 0.541 0.000
Reinforcement Provided in
Slope Section & Bottom 6.375 40 44.3
Bay 15( u/S End From 0.00 to 32.50)
8500
Top reinforcement Provided Td 400 25 250 131 1 131 9.400 1231.40 0.000 4.741 0.000
Across the river 500
3690 2180 880
400 1250
Td1 25 250 35 1 35 36.000 1260.00 0.000 4.851 0.000
Top reinforcement Provided 12000 1720 680 4750
Along the river 7250 Upto 31.65-1.25 -5 130
Support Rods 25 8 1 8 3.700 29.60 0.000 0.114 0.000
25 24 1 24 3.300 79.20 0.000 0.305 0.000 31.65
25 5 1 5 3.200 16.00 0.000 0.062 0.000 14.44
25 35 1 35 2.200 77.00 0.000 0.296 0.000
25 9 1 9 2.500 22.50 0.000 0.087 0.000
Dowel Rods on Construction 16 100 1 100 1.600 160.00 0.253 0.000 0.000
Joint
Sub -total 0.253 38.455 0.000
1250
8250 25 250 30 1 30 18.100 543.00 0.000 2.091 0.000
6500
Main Reinforcement Provided
on upstream 850 8.25 5.5 6.75
1250
9250 25 250 30 1 30 20.100 603.00 0.000 2.322 0.000
7500
Main Reinforcement Provided
on upstream 850 8.25 5.5 6.75
1250
9750 25 250 30 1 30 21.100 633.00 0.000 2.437 0.000
8000
Main Reinforcement Provided
on upstream 850
1250
8250 25 250 31 1 31 18.100 561.10 0.000 2.160 0.000
6500
Main Reinforcement Provided
on upstream 850
1250
6250 25 250 31 1 31 14.100 437.10 0.000 1.683 0.000
4500
Main Reinforcement Provided
on upstream 850
1250
6250 25 250 33 1 33 14.100 465.30 0.000 1.791 0.000
4500
Main Reinforcement Provided
on upstream 850
Stilling Basin Top Mate Chainage 32.50 to 64.40 and north south length 102.75 M From RA upto P8&9 Zone 2 (Complete)
TD1 102.75 400 25 250 119 1 119 116.500 13863.50 0.000 53.374 0.000
Top reinforcement Provided +10 Laps 850
Across the river 32.50 to 61.90
Distribution Reinforcement TD1 102.75 1250 25 250 23 1 23 116.500 2679.50 0.000 10.316 0.000
Provided in End Sill Upto +10 Laps
128.00 including Slope 10+2+11 18.75
400
80
3400
13103.6
Work Done Quantity for Right Abu
SL. Bar Dia. Specing
Description of Bar Size and Shape of Bar
No Mkd. (mm) (mm)
1 2 3 4 5 6
Right Abutment D/s From EL 128.50 to 146.50
1.35
18 + 25 250
4 Laps
Main Renforcement Vertical
Provided
6 25 250
Main Renforcement Vertical
Provided
7.50.30
.30 19.70
0.80
20 .00+
+ 12Lap
Lap .30
+2 Laps
Quantity for Right Abutment D/s
No of No of Total Cut. Length Total Length Dia Wise Weight in MT
Members Remark's
Bar Bar (mtr) (mtr) 16 mm 25 mm 32 mm
7 8 9=7*8 10 11=9*10 12 = 11* Unit Weight 13
Deduction of 1.50
152 1 152 22.850 3473.20 0.000 13.372 0.000 M for
Reinforcement
from Footing
4.75
3.789474 37.9
4.7
Work Done Quantity for Left bank Stil
SL. Bar Dia. Specing
Description of Bar Size and Shape of Bar
No Mkd. (mm) (mm)
1 2 3 4 5 6
Bay 1 Cut Off Trench U/s End to 0.00 to 0.00
1250
1250
5000 25 250
3500
Main Reinforcement Provided
on upstream 850
SD 1250
7500 25 250
Side Distribution rod Provided
from U/s End to 0.00
1250
5000 25 250
Main Reinforcement Provided 3500
on upstream from Chainage
0.00 to 19.50 850
1250
1250
4250 25 250
Main Reinforcement Provided 2750
on upstream from Chainage
19.90. to 24.40 850
1250
1250
3500 25 250
Main Reinforcement Provided 2000
on upstream from Chainage
24.40. to 64.40 850
1250
5000 25 250
3500
Main Reinforcement Provided
on upstream 850
1250
5000 25 250
3500
Main Reinforcement Provided
on upstream 850
Stilling Basin Top Mate Chainage 32.50 to 64.40 and north south length 102.75 M From RA upto P8&9 Zone 2 (Co
400
80
3400
13103.6
y for Left bank Stilling basin Complete
No of No of Total Cut. Length Total Length Dia Wise Weight in MT
Bar Members Bar (mtr) (mtr) 16 mm 25 mm 32 mm
7 8 9=7*8 10 11=9*10 12 = 11* Unit Weight
13
33 132
19
60 11.5
8.5 18
4.25 6.75
6 0.75 22
6.375 40
6.375 40 44.3
31.65
14.44
31.65
14.44
8.25 5.5 6.75
31.65
14.44
Upto 31.65-1.25
Upto 31.65-1.25
Upto 31.65-1.25
8.5 1 8.5
7.5 5 37.5
8.75 1 8.75
31.9 -29.4
60
0
#DIV/0!
29.4 61.9 #DIV/0!
61.9
5.158333
Work Done quantity for Piers
SL. Bar Dia. Specing No of
Description of Bar Size and Shape of Bar
No Mkd. (mm) (mm) Bar
1 2 3 4 5 6 7
Pier 2 (EL 130.00 to 140.50)
1.35
18 + 25 250
4 Laps
Main Renforcement Vertical
Provided
25
Left Abutment Us 139.50 to
146.50
25
25
25
25
Shear Reinforcement 139.50 to 141.00 32
141.00-146.00 16
16
Abutment Verticals 25
25
1.40
19.50 + 5 Laps 16 250
Main Reinforcement Provided 0.80
in from EL 129.50
.50 20.10 + 1 Laps .50
Distribution Reinforcement 16 250
Frrom (129.50 to 148.50)
inclined Average Length 19.50
1.40
23.30 + 6 Laps 16 250
Main Reinforcement Provided 0.80
in from EL 129.50
1.40
20.10 + 5 Laps 16 250
Main Reinforcement Provided 0.80
in from EL 129.50
1.40
12.85 + 4 Laps 16 250
Main Reinforcement Provided 0.80
in from EL 129.50
Deduction of 1.50
75 1 75 6.000 450.00 0.000 1.733 0.000 M for
Reinforcement
from Footing
4.75
1.5
6.5
26
22.4
20
39.18 4.875
46.84
23.42
5.855
93.6 41.3
20.65
40.2
82 41.7
20.85
80.4
26.24
13.12