Report Dated : 7/12/21

B Shift Report :

Power generation STG-1 : 61.110 MWH


Power generation STG-2 : 0.000 MWH
Total power generation : 61.110 MWH
Power export PLN : 20.416 MWH
Power export BCT: 21.100 MWH
Power export industries: 5.280 MWH
Auxiliary consumption : 14.314 MWH
Auxiliary percentage: 23.42%
Coal consumption Boiler-1 : 52.861 Tons
Coal consumption Boiler-2 : 0.000 Tons
Specific steam consumption STG-1 : 4.78 Ton/MWH
Specific steam consumption STG-2 : 0.00 Ton/MWH
PLF-1 : 50.93%
PLF-2 : 0.00%
Report dated 07.12.2021
Power generation STG-1 : 187.740 MWH
Power generation STG-2 : 0.000 MWH
Total power generation : 187.740 MWH
Power export PLN : 67.584 MWH
Power Import From PLN : 0.000 MWH
Power export BCT: 61.100 MWH
Power export to Industries : 15.840 MWH
Auxiliary consumption : 43.216 MWH
Auxiliary percentage: 23.02%
Coal consumption Boiler-1 :159.603 Tons
Coal consumption Boiler-2 : 0.000 Tons
Boiler #1 Specific coal consumption : 0.85 Ton/MWH
Boiler #2 Specific coal consumption : 0.00 Ton/MWH
Specific steam consumption STG-1 : 4.59 Ton/MWH
Specific steam consumption STG-2 : 0.00 Ton/MWH
PLF-1 : 52.15%
PLF-2 : 0.00%
Gen Report - 07.12.2021
Power genaration STG-1 : 187.740 MWH
Power generation STG-2 : 0.000 MWH
Total power generation : 187.740 MWH
Power export PLN : 67.584 MWH
Power import from PLN : 0.000 MWH
Power export BCT : 61.100 MWH
Power export Line#4 : 15.840 MWH
Auxiliary consumption : 43.216 MWH
Auxiliary percentage : 23.02 %
Electrical dept daily report: 07.12.2021
1. Wp no.12.227 Air compressor#1,2&3 motors preventive maintenance work completed, main
contactor and feeder tightness cheked done all found normal, IR/WR value noted. Air Dryer#1&2
cleaning work completed.
2. Wp no.12.228 EOT crane system motors preventive maintenance work completed, main feeder
tightness cheked all found normal and IR/WR value noted.
3. RW transfer#2 trail load taken by wtp operation, current and temperatur noted.
Temp DE: 56.4 Body 65.7 NDE: 47.9 in degC. Load current: 20.4 amp. Trail up to 1hrs 30mints.
Electrical planning work today: 08.12.2021
1. Unit#1 Boiler sootblower RSB/LRSB preventive maintenance.

Date : 8.12.2021
A Shift Report :
Power generation STG-1 : 49.455 MWH
Power generation STG-2 : 0.000 MWH
Total power generation : 49.455 MWH
Power export PLN : 19.008 MWH
Power export BCT: 12.300 MWH
Power export industries: 3.520 MWH
Auxiliary consumption : 14.627 MWH
Auxiliary percentage: 29.58%
Coal consumption Boiler-1 : 43.15 Tons
Coal consumption Boiler-2 : 00.000 Tons
Specific steam consumption STG-1 : 4.63 Ton/MWH
Specific steam consumption STG-2 : 0.00 Ton/MWH
PLF-1 : 41.21%
PLF-2 : 0.00%