You are on page 1of 1

Project Design Matrix (PDM)

Project Title: 3rd internship Project


Duration: 3 months, from 1st November to 31st January
Partner :

Narrative Summary Objectively Verifiable Indicators Means of Verification Assumption/Risk


Overall Goal of Help
To be used for future technical report/ final thesis/ Improvement on writing and organizing the technical report or
model for junior. final thesis. Partnership monitoring
report
Project Purpose
Electrical Components Installation 1. Understand the organization structure of different Quality technical report on
responsibility in the site of the company. topic …
2. Be aware of safety in the construction site and while
installing.
3. Implementation of electrical installation.

Outputs
1. 1st page – Chapter 1: The introduction prior to 1. Making the cover of the report
the report. 2. Acknowledgements
3. Organizing the table of content

2. Chapter 2: The organization in the site and the 1. Table of management and responsibilities of each individual.
presentation of internship. 2. Explanation of internship

3. Chapter 3: Basic knowledge of components and 1. Learning the usage of equipment


equipment and the installation of the electrical 2. Understanding the safety in the site
components. 3. Learning on how to install effectively

4. Chapter 4: Conclusion of the report. Concluding the report

Activities
Preconditions:
1.1 Literature review
1.2 Lead to define scope of report
1.3 Well define table content
1.4 …

a. …
b.

You might also like