Khyber City by Laws
Khyber City by Laws
KHYBER CITY has introduced innovative models of modern living. By bringing together modern
designs in construction of houses, infrastructure and essential associated facilities, it has offered
world-class amenities to its residents. This can be credited to the strict building bylaws implemented
by the upscale housing society in addition to other construction rules & laws in Pakistan.
As per the building bylaws in KHYBER CITY, these are the standard sizes of residential plots in the
area:
• Maximum size of residential plots is 1 kanal. As per the bylaws, if the size of your plot is
increased or decreased due to re-planning of the society, you would have to either pay the
price or claim refund of every square foot as applicable.
• Two plots can be combined; however, the maximum size of the plot should not exceed 1
kanal.
• You are only allowed to build one house on a plot. If you want to make a subdivision, you
would have to submit an application with the required documents to get a permit from
KHYBER CITY.
BY LAWS TO OBEY
An oversight in scrutiny of drawings at the time of approval of the Building Plan does not entitle the
owner to violate the building by laws
Approved elevations are to be followed strictly by clients or contractor as per design otherwise serious
action will be taken by the KHYBER CITY. The front elevation restriction include.
• Gate Design
• Boundary Wall
• 5 feet space for green area
• Aluminum Frames of windows for front facade & glass
• Floor finishes level 2’ – 0” from load level
• Height of the building 30’
• Porch Level = 9”
• Porch Depth minimum 12’ or max 380 sq ft area
ALLOWABLE COVERED AREA
125 Sq. Yds 250 Sq. Yds 500 Sq. Yds 1000 Sq. Yds
PLOT SIZE ▼ (25’x45′)▼ (35’x70′) ▼ (50’x90′)▼ ▼
U.G.W. T 6’x6’x4′ 7’x5’x6 8’x5’x6 8’x5’x7′
Note:
1. It is mandatory that boundary wall should be build up at D.P.C level & get checked
2. It is mandatory to get your inspection card signed by the site engineer on every state
3. After plaster, before exterior finished, please contact color consultant in design wing.
5. Clients are advised to award construction work the constructors who has qualified
6. Storm water drain will not be connected with sewerage system of KHYBER CITY.
All Payments deposited are refundable with 10% deduction.
All payments are valid for One year only. Payments are to be made in advance.
Please make your payments (in the form of Cash/Pay Order/ Demand Drafts).
Process of Design:
• Advance Payment for Design Section.
• Soil Test to be done by the client from any soil registered with PEC.
Documents Required:
• ID card copy
• Allotment Letter
• In case of client absence, the person collecting drawings and inspection card should
mandatory.
• Client has to submit 2 sets of soil test, structural drawings, structural stability
• It is mandatory to get the approvals of exterior finishes from the Finish ed Expert /
• Any kind of fencing is not allowed to erect outside the housed and the green belts.
• Project must be started inside of 15 days of the workorder received and the whole
• Losing the original inspection card requires you to get a duplicate for PKR 30,000.
• In case you miss the signage once, you’ll be required to provide an affidavit on PKR 100