100mm THK.

FLOOR FINISH
RCC COL. RCC COL.
100mm THK.P.C.C M-10

SOLING 150MM THK WEEP HOLES TO BE


AS/PLAN AS/SCH. PROVIDED AT 6M C/C BASEMENT - 2
COMPACTED EARTH FILLING AS/SCH.
AS/PLAN STEEL PL. STEEL PL. (T.O.S.) -0.81M

Ld 600

1100
Ld Ld Ld

150

Ld
Ld

350
Ld
Ld

AS/PLAN 500 500


500 500
REINF. IN 1st LAYER EXT. AT 2nd LAYER AS/PLAN
SOIL ANCHOR 9470 SOIL ANCHOR EXT. AT 2nd LAYER REINF. IN 1st LAYER
100mm THK.P.C.C M-7.5 EXT. AT 2nd LAYER
WATER PROOFING

RAFT FILLING METHODOLOGY

1. THE SOIL FILLED OVER THE RAFT AND WEEP HOLES (WITHIN THE SOIL FILLING)
6000

4 NOS OF 150MM DIA AT EACH GRID AT 6M SPACING


SHALL BE PROVIDED FOR THE MOISTURE TO ESCAPE.THIS SHALL BE DONE BY PLACING
SUITABLE PVC PIPE AND REMOVING THEM.
2770

2.THE WEEP HOLE IS LEFT OPEN FOR 30DAYS


AFTER SOLING AND PCC IS LAID TO HELP SOIL
6000

TO DRAIN COMPLETELY WITHOUT ANY MOSTURE


3. AFTER 30 DAYS THE WEEP HOLES ARE FILLED WITH LIME
2770

TO ENSURE NO MOISTURE IS LEFT OVER AS THE LIME


HAS CHARACTERISTIC TO OBSORB THE MOISTURE IN THE
SOIL
6000

4. AT FINAL STAGE WEEP HOLES ARE PACKED WITH CONCRETE (1:3:6) OF SIZE 20MM DOWNGAUGE
BEFORE THE FLOOR FINISH.
5000 4470 5000 4470 5000