Monthly Report of Operations and Maintenance
For Alfil millers for both mills A & B and motor vehicles for the
month of October 2020

November 15TH, 2020

GENERAL MANAGER

ALFIL MILLERS LTD

Dear Sir:

The maintenance team is pleased to present the attached Monthly report. Included is a detailed
report of operation and maintenance of Mill B and motor vehicle for the month of October. The
maintenance team welcomes any comments or questions on this report.

Sincerely,

Maintenance team
Executive Summary
During last month (October), we experienced some break downs on elevator hoppers, main
separator flap, scourer screens and aspiration fan bearing for aspirator and all these were
rectified. We also carried out prevent maintenance in both mills. On motor vehicle side, we
have carried out both preventive among which was servicing of brake system & and breakdown
maintenance on several vehicles.
Preventive maintenance done at Mill A & B respectively
We carried out daily, weekly and monthly prevent maintenance on mill B during the last month
(October), as follows;

1. Daily maintenance included blowing of mill B, draining of condensed vapor from


compressor and daily inspection of mill equipments during production to identify and
rectify any fault before intensification.
2. Weekly maintenance done in October includes;
 Cleaning of magnets in both mills
 Cleaning of air filters on blowers
 Cleaning of inspection glasses for rollers since these are mainly affected by
moisture for both Mills A and B
 Cleaning dampening machine to remove rotten grain
 Blowing of low pressure fans inside mill B to avoid excessive vibrations that may
damage electric motor bearings
 Cleaning of inspection glasses for rollers since these are mainly affected by
moisture.
 Tightening of loose bolts on all equipments respectively such as vibrating motors
 Cleaning of machines with rags, and blowing of entire mills
 Maintaining and repair of sewing machines

Sewing machine
during
maintenance
3. Other maintenance work done last month includes;
 Sealing of water leakages and cleaning gutters on all roof tops of production
facility
 We installed two new scouring screens on their respective frames and installed
back on scouring machine.

New scourers inserted


onto frames ready for
installation

Damaged scourers

 Last month we replaced broken cups on bucket elevators, the metallic cups were
replaced by plastic ones.

New Plastic cups


installed

Metallic cups breaking due


to rusting
 We also replaced faulty bearings from aspirator electric motor fan

Aspirator motor fan


after change of
bearings

Aspirator fan

 We also fabricated new flap for the separator in Mill B and 25kg bag grippers

Newly fabricated and


25kg bag grippers
broken flap for elevator

 Last month we repaired broken hoppers for both elevator boot and screw conveyor

Hopper for
elevator boot

Hopper for
screw conveyor
Operations high light on motor vehicle maintenance

Vehicle NO_ Illustration Operation


UAZ 578H We installed two new driving
shafts, two upper suspension
plates, z-links and stabilizer
bushes

UBB 866W We installed new air bag and


servicing of bearings

Faulty air
bag

UBD 358G We installed new clutch plate


and new fly wheel ring gear

Fly wheel ring


gear
Super great We installed new gear
UAW 138Y softener valve

Gear softener
valve

Fuso fighter
UAE 896H

New brake
pads
installed
on brake 4 new pairs of brake
shoes cylinders also
installed

Fuso fighter We installed new brake pads


UAW 821Y and servicing of brake
cylinders with new cylinder
rubbers
PERSONNEL

The maintenance team includes one motor vehicle & one maintenance mechanic, one welder,
two technical helpers and turn men for motor vehicles. The one technical helper also works in
production shift changeovers as well. The team work hand in hand to deliver precise results.
The team also works hand in hand with productions team to ensure proper mill maintenance

You might also like