PANYNJ Newark Liberty International Airport

Terminal One Redevelopment Program

Type FBE Roof – Supplemental Structural Reinforcement at Slab Openings


Shop Drawings, Design Calculations

Prepared for:

Transcontinental Steel, Inc.


265 Pacific Street
Newark, NJ

Revision 1.3
November 20th, 2020

Jose Moncayo, NJPE (#24GE04889400)

Prepared By:

Mirmax Engineering, P.C.


8 Hillside Avenue, Suite 205
Montclair, NJ 07042
(973) 233 4242
Shop Drawing –Type 1 FBE Roof Reinforcement at Slab Openings
ME-130
STV INCORPORATED

EWR TERMINAL 1 REDEVELOPMENT


8 7 6 5 4 3 2 1

SUBMITTAL NO.
055000-073-00

APPROVED FOR CONSTRUCTION

APPROVED FOR CONSTRUCTION AS


X CORRECTED

D NOT APPROVED
Matthew Sangen D

REVIEWED BY (PRINT): Michael Roncevic

REVIEWED BY (SIGN): MR
DATE: 9/18/2020
THIS DOCUMENT HAS BEEN REVIEWED FOR
GENERAL CONFORMANCE WITH THE DESIGN
DRAWINGS AND SPECIFICATIONS.
SPAN SCHEDULE
TYPE LOCATION SPAN 1 LENGTH "A" DIMENSION Any review
Any review does
does not
not relieve
relieve the
the contractor
contractor oror any
any
TYP1‐32/33 NORTH PIER 24'‐0" 12'‐0" subcontractor of
subcontractor of responsibility
responsibility forfor full
full compliance
compliance
TYP1‐30/31 NORTH PIER 22'‐0" 11'‐0" with contract requirements; for correctness
with contract requirements; for correctness of of
TYP1‐28/29 NORTH PIER 24'‐6" 12'‐3"
dimensions, clearances
dimensions, clearances and and material
material quantities;
quantities;
for proper
for proper design
design of of details,
details, for
for proper
proper fabrication
fabrication
TYP1‐5/6 SOUTH PIER 34'‐0" 17'‐0"
and construction techniques; for
and construction techniques; for proper proper
TYP1‐3/4 SOUTH PIER 25'‐0" 12'‐6" coordination with
with other
other trades;
trades; and
and for
for providing
providing
coordination
TYP1‐26/27 MAIN TERMINAL 23'‐7" 11'‐9 1/2" required forfor safe
safe and
and satisfactory
satisfactory
all devices required
TYP1‐8/7 MAIN TERMINAL 25'‐8 1/4" 12'‐10 1/8" construction and
and operation.
operation.

2'-6" "A" (V.I.F.) NOTES:


1. REFERENCE CONTRACT DRAWINGS:
A TPP TO COORDINATE
WITH DUCT OPENING S03.001 DATED 7/22/2020
(E) W16 x 31 S07.040 DATED 7/22/2020
2. TOP OF STEEL ELEVATION: 41'-3"
3. MATERIAL:
C C
REINFORCEMENT AT SLAB OPENINGS (TYPE 1) 1. BEAMS SHALL BE PER ASTM A992
ISOMETRIC VIEW 2. PLATE AND ANGLE SHALL BE PER ASTM A36
4. FINISH:
ONE COAT OF SHOP PRIMER
3 3
8" PLATE x 6" x 78"
 738" A 1'-0"
WITH 2x " A325 BOLTS SECT A-A
(VERIFY) 4'-4" PLAN NORTH THE FOLLOWING NOTES ARE AN INTEGRAL PART OF THIS DRAWING AND
IN HORIZONTAL LONG SLOTTED HOLES 1 OUR CONTRACT:
2" 2"
212"
2'-0" 1) THE G C IS TO RETURN THR MARKED-UP SEPIA TO OUR OFFICE. We require by both the architect and engineer.
2) If Architect/Engineer marks up drawing "REVIEWED" we will construe this action to mean we are in compliance with contract

(E) W12 x 26 (VERIFY) documents and, in fact these drawings are "APPROVED" or "APPROVED AS NOTED" unless specifically stated otherwise.
(N) L6" x 3-1/2" x 3/8" (LLV)
B B
3) These drawings are our interpretation of what is necessary to meet your specifications. It is most important therefore
that they are checked by the G.C./Architect/Engineer against drawings provided by other trades to assure proper installation
to those surrounding materials.
W8x15 4) This drawing is for the exclusive use of Transcontinental.

3" 5) Work areas must br free of duct, pipe, electrical work, etc. prior to installation of steel.
6) Chopping, patching, dry pack, grout, fireproofing or field painting/ touch-up are by others (U. N.)
7) Location of holes, clips, cuts for other trades, if required by contract. MUST be shown or verified by others on
this drawing when submitted for approval.
8) Do not scale this drawing.
9) New steel is shown as [________________________], existing steel is shown as [______ ______ ______].

(N) L6" x 3-1/2" x 3/8" (LLV)


STEEL PAINT HOLES BOLTS ELECTRODES
214"
12'-1 1/2" A36 ONE COAT

3'-10"
15
(N) W8 x 15
200 lbs/ft 290 lbs/ft 3'-9" A992 SHOP PRIMER
16" U.O.N.
7
8" U.O.N. E70XX

FM BY FM CHECK BY ORDERED BY OK TO FAB BY OK TO ERECT BY


1/4" (INITIAL & DATE) (INITIAL & DATE) (INITIAL & DATE) (INITIAL & DATE) (INITIAL & DATE)
TYP.
1/4" (N) L6" x 3-1/2" x 3/8" (LLV) 200 lbs/ft
W8x15
6
SECTION A-A (E) W16 x 31 5

TYPICAL CONNECTION DETAIL 4

2'-0"
B 2'-8" 6'-0" 1'-10" B
(N) W8 x 15 TO (E) W16 x 31 200 lbs/ft 19'-0"
3
2
1
W8x15
(N) L6" x 3-1/2" x 3/8" (LLV) NO. DATE COMMENTS NO. DATE ISSUED FOR

(N) L6" x 3-1/2" x 3/8" (LLV) 145 lbs/ft REVISIONS PRINT RECORD

7'-4" (VERIFY)
TRANSCONTINENTAL STEEL
1'-0"
(VERIFY) 256 PACIFIC STREET, NEWARK, N.J. 07114 TEL: (973) 596-0148 FAX: (973) 596-0679
(N) L6" x 3-1/2" x 3/8" (LLV) 334"
1" (E) W12 x 26 (N) L6" x 3-1/2" x 3/8" (LLV)
STRUCTURAL STEEL FABRICATIONS
STAIRS AND HEAVY WELDING SPECIALIST
DWG TITLE
(N) W8 x 15 TYPE 1 FBE ROOF
REINFORCEMENT AT SLAB OPENINGS
PROJECT NAME

3/16"
NEWARK LIBERTY
TYP.
3/16" INTERNATIONAL AIRPORT
(E) W12 x 26
(E) W12 x 26 ARCH'T

(E) W16 x 31 ENG'R


A A
SECTION B-B
TYPICAL CONNECTION DETAIL CONT'R

1 3
(N)L6"x 3 2" x 8" (LLV) TO (E)W12 x 26 DRN BY CHK'D BY JOB NO. SEARCH DWG NO.
REINFORCEMENT AT SLAB OPENINGS (TYPE 1) JMS
PLAN VIEW DATE
8/20/2020
DATE
19033
ME-130 0

8 7 6 5 4 3 2 1
Calculations – Reinforcement required For Slab Openings
C1-1 to C1-3
XS-01
Job Newark AP-FBE Strengtheining
SHEET XS-01 OF
BY GSN DATE 12-24-20
8 Hillside Ave-Montclair NJ-07042 CHECKED DATE

Z Y

V
U

Section element Rotation Mirror Material E


angle (kip/inch^2)
Unequal Angles L6X3-1/2X3/8 180.0 Steel 29732.747
Unequal Angles L6X3-1/2X3/8 Steel 29732.747

The overall dimensions of the section are 7.0 x 8.0 inch

Basic geometry of the section


Parameter Value
A Cross sectional area 6.838 inch2
 Angle between Y-Z and U-V axes 20.684 deg
Iy Moment of inertia about axis parallel to Y 52.08 inch4
passing through centroid
Iz Moment of inertia about axis parallel to Z 11.006 inch4
passing through centroid
It Torsional moment of inertia (St. Venant) 0.352 inch4
iy Radius of gyration about axis parallel to Y 2.76 inch
passing through centroid
iz Radius of gyration about axis parallel to Z 1.269 inch
passing through centroid
Wu+ Max elastic modulus about U-axis 11.833 inch3
Wu- Min elastic modulus about U-axis 11.833 inch3
Wv+ Max elastic modulus about V-axis 2.095 inch3
Wv- Min elastic modulus about V-axis 2.095 inch3
Wpl,u Plastic modulus about U-axis 17.43 inch3
Wpl,v Plastic modulus about V-axis 4.455 inch3
Iu Moment of inertia about U-axis 58.908 inch4
Iv Moment of inertia about V-axis 4.178 inch4
iu Radius of gyration about U-axis 2.935 inch
iv Radius of gyration about V-axis 0.782 inch
au+ Centroid to edge of compression zone along +ve 0.306 inch
U-axis
au- Centroid to edge of compression zone along -ve 0.306 inch
U-axis
av+ Centroid to edge of compression zone along +ve 1.73 inch
V-axis
av- Centroid to edge of compression zone along -ve 1.73 inch
V-axis
yM Distance to centroid along Y-axis -3.87313e-00
7
zM Distance to centroid along Z-axis -4.0 inch
yP Distance to equal area axis along Y-axis -0.006 inch
zP Distance to equal area axis along Z-axis -3.931 inch
STAAD Model - 13'-0" Max Span
Job No Sheet No Rev
Elevator PIt St 1
Part
Software licensed to Newmark Engineering, P.C.
Job Title St Nicholos Church Ref

By GSN Date11-2-20 Chd

Client TRANSCONTINENTAL File REPAIR.std Date/Time 02-Nov-2020 14:20

Beam Maximum Moments


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max My d Max Mz
(ft) (ft) (kip-ft) (ft) (kip-ft)
1 1 2.667 2:LOAD CASE Max +ve 0.000 0.00
Max -ve 0.000 0.00 2.667 -3.57
2 2 6.000 2:LOAD CASE Max +ve 0.000 0.00
Max -ve 0.000 0.00 3.500 -5.54
3 3 4.333 2:LOAD CASE Max +ve 0.000 0.00 4.333 -0.00
Max -ve 0.000 0.00 0.000 -4.78

Print Time/Date: 02/11/2020 14:22 STAAD.Pro V8i (SELECTseries 5) 20.07.10.64 Print Run 1 of 1
Monday, November 02, 2020, 02:14 PM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro V8i SELECTseries5 *
* Version 20.07.10.64 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 2, 2020 *
* Time= 14: 6:26 *
* *
* USER ID: Newmark Engineering, P.C. *
****************************************************

1. STAAD SPACE
INPUT FILE: REPAIR.STD
2. START JOB INFORMATION
3. ENGINEER DATE 11-2-20
4. JOB NAME ST NICHOLOS CHURCH
5. JOB CLIENT TRANSCONTINENTAL
6. ENGINEER NAME GSN
7. JOB NO ELEVATOR PIT STEEL
8. END JOB INFORMATION
9. INPUT WIDTH 79
10. UNIT INCHES KIP
11. JOINT COORDINATES
12. 1 0 0 0; 2 32 0 0; 3 104.004 0 0; 4 156 0 0
13. MEMBER INCIDENCES
14. 1 1 2; 2 2 3; 3 3 4
15. DEFINE MATERIAL START
16. ISOTROPIC STEEL
17. E 29000
18. POISSON 0.3
19. DENSITY 0.000283
20. ALPHA 6E-006
21. DAMP 0.03
22. TYPE STEEL
23. STRENGTH FY 36 FU 58 RY 1.5 RT 1.2
24. END DEFINE MATERIAL
25. UNIT FEET KIP
26. MEMBER PROPERTY AMERICAN
27. 1 TO 3 TABLE ST W8X15
28. CONSTANTS
29. MATERIAL STEEL ALL
30. UNIT INCHES KIP
31. SUPPORTS
32. 1 PINNED
33. 4 FIXED BUT MY MZ
34. UNIT FEET POUND
35. LOAD 2 LOADTYPE LIVE TITLE LOAD CASE 2 LL
36. UNIT FEET KIP

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 1 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 2

37. MEMBER LOAD


38. 2 UNI GY -0.29
39. 1 3 UNI GY -0.2
40. UNIT INCHES KIP
41. PERFORM ANALYSIS PRINT ALL

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS 4 NUMBER OF MEMBERS 3


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 2

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 1/ 1/ 12 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 17
TOTAL LOAD COMBINATION CASES = 0 SO FAR.
SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 322640.8 MB

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 2 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 3

LOADING 2 LOADTYPE LIVE TITLE LOAD CASE 2 LL


-----------

MEMBER LOAD - UNIT KIP FEET

MEMBER UDL L1 L2 CON L LIN1 LIN2

2 -0.2900 GY 0.00 6.00


1 -0.2000 GY 0.00 2.67
3 -0.2000 GY 0.00 4.33

MEMBER LOAD - UNIT KIP INCH

MEMBER UDL L1 L2 CON L LIN1 LIN2

FOR LOADING - 2
APPLIED JOINT EQUIVALENT LOADS
JOINT FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM-Z
1 0.00000E+00-2.66667E-01 0.00000E+00 0.00000E+00 0.00000E+00-1.42222E+00
2 0.00000E+00-1.13671E+00 0.00000E+00 0.00000E+00 0.00000E+00-9.01894E+00
3 0.00000E+00-1.30335E+00 0.00000E+00 0.00000E+00 0.00000E+00 6.68618E+00
4 0.00000E+00-4.33300E-01 0.00000E+00 0.00000E+00 0.00000E+00 3.75498E+00

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 2


LOADTYPE LIVE TITLE LOAD CASE 2 LL

CENTER OF FORCE BASED ON Y FORCES ONLY (INCH).


(FORCES IN NON-GLOBAL DIRECTIONS WILL INVALIDATE RESULTS)

X = 0.762805201E+02
Y = 0.000000000E+00
Z = 0.000000000E+00

***TOTAL APPLIED LOAD ( KIP INCH ) SUMMARY (LOADING 2 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -3.14
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= 0.00 MZ= -239.52

***TOTAL REACTION LOAD( KIP INCH ) SUMMARY (LOADING 2 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 3.14
SUMMATION FORCE-Z = 0.00

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 3 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 4

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= 0.00 MZ= 239.52

MAXIMUM DISPLACEMENTS ( INCH /RADIANS) (LOADING 2)


MAXIMUMS AT NODE
X = 0.00000E+00 0
Y = -1.05856E-01 3
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= -2.45187E-03 1

EXTERNAL AND INTERNAL JOINT LOAD SUMMARY ( KIP INCH )-

JT EXT FX/ EXT FY/ EXT FZ/ EXT MX/ EXT MY/ EXT MZ/
INT FX INT FY INT FZ INT MX INT MY INT MZ

SUPPORT=1
1 0.00 -0.27 0.00 0.00 0.00 -1.42
0.00 -1.34 0.00 0.00 0.00 1.42 111000

4 0.00 -0.43 0.00 0.00 0.00 3.75


0.00 -1.10 0.00 0.00 0.00 -3.75 111100

************ END OF DATA FROM INTERNAL STORAGE ************

42. PRINT ALL

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 4 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 5

JOINT COORDINATES
-----------------
COORDINATES ARE INCH UNIT

JOINT X Y Z

1 0.000 0.000 0.000


2 32.000 0.000 0.000
3 104.004 0.000 0.000
4 156.000 0.000 0.000

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 5 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 6

MEMBER INFORMATION
------------------

MEMBER START END LENGTH BETA


JOINT JOINT (INCH) (DEG) RELEASES

1 1 2 32.000 0.00
2 2 3 72.004 0.00
3 3 4 51.996 0.00

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 6 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 7

MATERIAL PROPERTIES.
--------------------
ALL UNITS ARE - KIP INCH

MATERIAL
KIND E POIS DENS ALPHA DAMP G

STEEL
1D 2.90000E+04 0.300 2.83000E-04 6.00000E-06 0.030 1.11538E+04

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 7 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 8

MATERIAL PROPERTIES.
--------------------
ALL UNITS ARE - KIP INCH

MEMBER E G DEN ALPHA

1 29000.0 11153.8 0.00028300 0.00000600


2 29000.0 11153.8 0.00028300 0.00000600
3 29000.0 11153.8 0.00028300 0.00000600

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 8 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 9

MEMBER PROPERTIES. UNIT - INCH


-----------------

MEMB PROFILE AX/ IZ/ IY/ IX/


AY AZ SZ SY

1 ST W8X15 4.44 48.00 3.40 0.14


1.99 1.69 11.84 1.69
2 ST W8X15 4.44 48.00 3.40 0.14
1.99 1.69 11.84 1.69
3 ST W8X15 4.44 48.00 3.40 0.14
1.99 1.69 11.84 1.69

SUPPORT INFORMATION (1=FIXED, 0=RELEASED)


-------------------
UNITS FOR SPRING CONSTANTS ARE KIP INCH DEGREES

JOINT FORCE-X/ FORCE-Y/ FORCE-Z/ MOM-X/ MOM-Y/ MOM-Z/


KFX KFY KFZ KMX KMY KMZ

1 1 1 1 0 0 0
0.0000E+00 0.0000E+00 0.0000E+00 0.000E+00 0.000E+00 0.000E+00
4 1 1 1 1 0 0
0.0000E+00 0.0000E+00 0.0000E+00 0.000E+00 0.000E+00 0.000E+00

************ END OF DATA FROM INTERNAL STORAGE ************

43. PARAMETER 1
44. CODE AISC
45. PARAMETER 2
46. CODE AISC
47. FINISH

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 9 of 10


Monday, November 02, 2020, 02:14 PM
STAAD SPACE -- PAGE NO. 10

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= NOV 2,2020 TIME= 14: 6:26 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2014 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR.anl Page 10 of 10


STAAD Model - 17'-0" Max Span
\
Job No Sheet No Rev
Elevator PIt St 1
Part
Software licensed to Newmark Engineering, P.C.
Job Title St Nicholos Church Ref

By GSN Date11-2-20 Chd

Client TRANSCONTINENTAL File REPAIR17.std Date/Time 20-Nov-2020 10:10

Beam Maximum Moments


Distances to maxima are given from beam end A.
Beam Node A Length L/C d Max My d Max Mz
(ft) (ft) (kip-ft) (ft) (kip-ft)
1 1 2.667 2:LOAD CASE Max +ve 0.000 0.00 0.000 0.00
Max -ve 0.000 0.00 2.667 -4.78
2 2 6.000 2:LOAD CASE Max +ve 0.000 0.00
Max -ve 0.000 0.00 5.500 -8.79
3 3 8.333 2:LOAD CASE Max +ve 0.000 0.00
Max -ve 0.000 0.00 0.000 -8.72

Print Time/Date: 20/11/2020 10:20 STAAD.Pro V8i (SELECTseries 5) 20.07.10.64 Print Run 1 of 1
Friday, November 20, 2020, 10:31 AM
PAGE NO. 1

****************************************************
* *
* STAAD.Pro V8i SELECTseries5 *
* Version 20.07.10.64 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= NOV 20, 2020 *
* Time= 10:10:24 *
* *
* USER ID: Newmark Engineering, P.C. *
****************************************************

1. STAAD SPACE
INPUT FILE: REPAIR17.STD
2. START JOB INFORMATION
3. ENGINEER DATE 11-2-20
4. JOB NAME ST NICHOLOS CHURCH
5. JOB CLIENT TRANSCONTINENTAL
6. ENGINEER NAME GSN
7. JOB NO ELEVATOR PIT STEEL
8. END JOB INFORMATION
9. INPUT WIDTH 79
10. UNIT INCHES KIP
11. JOINT COORDINATES
12. 1 0 0 0; 2 32 0 0; 3 104.004 0 0; 4 204 0 0
13. MEMBER INCIDENCES
14. 1 1 2; 2 2 3; 3 3 4
15. DEFINE MATERIAL START
16. ISOTROPIC STEEL
17. E 29000
18. POISSON 0.3
19. DENSITY 0.000283
20. ALPHA 6E-006
21. DAMP 0.03
22. TYPE STEEL
23. STRENGTH FY 36 FU 58 RY 1.5 RT 1.2
24. END DEFINE MATERIAL
25. UNIT FEET KIP
26. MEMBER PROPERTY AMERICAN
27. 1 TO 3 TABLE ST W8X15
28. CONSTANTS
29. MATERIAL STEEL ALL
30. UNIT INCHES KIP
31. SUPPORTS
32. 1 PINNED
33. 4 FIXED BUT MY MZ
34. UNIT FEET POUND
35. LOAD 2 LOADTYPE LIVE TITLE LOAD CASE 2 LL
36. UNIT FEET KIP

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 1 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 2

37. MEMBER LOAD


38. 2 UNI GY -0.29
39. 1 3 UNI GY -0.2
40. UNIT INCHES KIP
41. PERFORM ANALYSIS PRINT ALL

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS 4 NUMBER OF MEMBERS 3


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 2

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 1/ 1/ 12 DOF


TOTAL PRIMARY LOAD CASES = 1, TOTAL DEGREES OF FREEDOM = 17
TOTAL LOAD COMBINATION CASES = 0 SO FAR.
SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 12.0/ 254520.0 MB

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 2 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 3

LOADING 2 LOADTYPE LIVE TITLE LOAD CASE 2 LL


-----------

MEMBER LOAD - UNIT KIP FEET

MEMBER UDL L1 L2 CON L LIN1 LIN2

2 -0.2900 GY 0.00 6.00


1 -0.2000 GY 0.00 2.67
3 -0.2000 GY 0.00 8.33

MEMBER LOAD - UNIT KIP INCH

MEMBER UDL L1 L2 CON L LIN1 LIN2

FOR LOADING - 2
APPLIED JOINT EQUIVALENT LOADS
JOINT FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM-Z
1 0.00000E+00-2.66667E-01 0.00000E+00 0.00000E+00 0.00000E+00-1.42222E+00
2 0.00000E+00-1.13671E+00 0.00000E+00 0.00000E+00 0.00000E+00-9.01894E+00
3 0.00000E+00-1.70335E+00 0.00000E+00 0.00000E+00 0.00000E+00-3.44662E+00
4 0.00000E+00-8.33300E-01 0.00000E+00 0.00000E+00 0.00000E+00 1.38878E+01

STATIC LOAD/REACTION/EQUILIBRIUM SUMMARY FOR CASE NO. 2


LOADTYPE LIVE TITLE LOAD CASE 2 LL

CENTER OF FORCE BASED ON Y FORCES ONLY (INCH).


(FORCES IN NON-GLOBAL DIRECTIONS WILL INVALIDATE RESULTS)

X = 0.973401530E+02
Y = 0.000000000E+00
Z = 0.000000000E+00

***TOTAL APPLIED LOAD ( KIP INCH ) SUMMARY (LOADING 2 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = -3.94
SUMMATION FORCE-Z = 0.00

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= 0.00 MZ= -383.52

***TOTAL REACTION LOAD( KIP INCH ) SUMMARY (LOADING 2 )


SUMMATION FORCE-X = 0.00
SUMMATION FORCE-Y = 3.94
SUMMATION FORCE-Z = 0.00

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 3 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 4

SUMMATION OF MOMENTS AROUND THE ORIGIN-


MX= 0.00 MY= 0.00 MZ= 383.52

MAXIMUM DISPLACEMENTS ( INCH /RADIANS) (LOADING 2)


MAXIMUMS AT NODE
X = 0.00000E+00 0
Y = -3.29984E-01 3
Z = 0.00000E+00 0
RX= 0.00000E+00 0
RY= 0.00000E+00 0
RZ= -5.17609E-03 1

EXTERNAL AND INTERNAL JOINT LOAD SUMMARY ( KIP INCH )-

JT EXT FX/ EXT FY/ EXT FZ/ EXT MX/ EXT MY/ EXT MZ/
INT FX INT FY INT FZ INT MX INT MY INT MZ

SUPPORT=1
1 0.00 -0.27 0.00 0.00 0.00 -1.42
0.00 -1.79 0.00 0.00 0.00 1.42 111000

4 0.00 -0.83 0.00 0.00 0.00 13.89


0.00 -1.05 0.00 0.00 0.00 -13.89 111100

************ END OF DATA FROM INTERNAL STORAGE ************

42. PRINT ALL

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 4 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 5

JOINT COORDINATES
-----------------
COORDINATES ARE INCH UNIT

JOINT X Y Z

1 0.000 0.000 0.000


2 32.000 0.000 0.000
3 104.004 0.000 0.000
4 204.000 0.000 0.000

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 5 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 6

MEMBER INFORMATION
------------------

MEMBER START END LENGTH BETA


JOINT JOINT (INCH) (DEG) RELEASES

1 1 2 32.000 0.00
2 2 3 72.004 0.00
3 3 4 99.996 0.00

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 6 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 7

MATERIAL PROPERTIES.
--------------------
ALL UNITS ARE - KIP INCH

MATERIAL
KIND E POIS DENS ALPHA DAMP G

STEEL
1D 2.90000E+04 0.300 2.83000E-04 6.00000E-06 0.030 1.11538E+04

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 7 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 8

MATERIAL PROPERTIES.
--------------------
ALL UNITS ARE - KIP INCH

MEMBER E G DEN ALPHA

1 29000.0 11153.8 0.00028300 0.00000600


2 29000.0 11153.8 0.00028300 0.00000600
3 29000.0 11153.8 0.00028300 0.00000600

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 8 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 9

MEMBER PROPERTIES. UNIT - INCH


-----------------

MEMB PROFILE AX/ IZ/ IY/ IX/


AY AZ SZ SY

1 ST W8X15 4.44 48.00 3.40 0.14


1.99 1.69 11.84 1.69
2 ST W8X15 4.44 48.00 3.40 0.14
1.99 1.69 11.84 1.69
3 ST W8X15 4.44 48.00 3.40 0.14
1.99 1.69 11.84 1.69

SUPPORT INFORMATION (1=FIXED, 0=RELEASED)


-------------------
UNITS FOR SPRING CONSTANTS ARE KIP INCH DEGREES

JOINT FORCE-X/ FORCE-Y/ FORCE-Z/ MOM-X/ MOM-Y/ MOM-Z/


KFX KFY KFZ KMX KMY KMZ

1 1 1 1 0 0 0
0.0000E+00 0.0000E+00 0.0000E+00 0.000E+00 0.000E+00 0.000E+00
4 1 1 1 1 0 0
0.0000E+00 0.0000E+00 0.0000E+00 0.000E+00 0.000E+00 0.000E+00

************ END OF DATA FROM INTERNAL STORAGE ************

43. PARAMETER 1
44. CODE AISC
45. FYLD 36 ALL
46. MAIN 1 ALL
47. BEAM 1 ALL
48. TRACK 1 ALL
49. CHECK CODE ALL

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 9 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 10

STAAD.Pro CODE CHECKING - (AISC 9TH EDITION) v1.0


***********************

ALL UNITS ARE - KIP INCH (UNLESS OTHERWISE Noted)

MEMBER TABLE RESULT/ CRITICAL COND/ RATIO/ LOADING/


FX MY MZ LOCATION
=======================================================================

1 ST W8X15 (AISC SECTIONS)


PASS AISC- H1-3 0.204 2
0.00 T 0.00 -57.39 32.00

-----------------------------------------------------------------------
| MEM= 1, UNIT KIP-INCH, L= 32.0 AX= 4.44 SZ= 11.8 SY= 1.7|
| KL/R-Y= 36.6 CB= 1.00 YLD= 36.00 ALLOWABLE STRESSES: FCZ= 23.76 |
| FTZ= 23.76 FCY= 27.00 FTY= 27.00 FC= 19.46 FT= 21.60 FV= 14.40 |
-----------------------------------------------------------------------

2 ST W8X15 (AISC SECTIONS)


PASS AISC- H1-3 0.413 2
0.00 T 0.00 -105.51 66.00

-----------------------------------------------------------------------
| MEM= 2, UNIT KIP-INCH, L= 72.0 AX= 4.44 SZ= 11.8 SY= 1.7|
| KL/R-Y= 82.3 CB= 1.00 YLD= 36.00 ALLOWABLE STRESSES: FCZ= 21.60 |
| FTZ= 21.60 FCY= 27.00 FTY= 27.00 FC= 15.10 FT= 21.60 FV= 14.40 |
-----------------------------------------------------------------------

3 ST W8X15 (AISC SECTIONS)


PASS AISC- H1-3 0.472 2
0.00 T 0.00 -104.67 0.00

-----------------------------------------------------------------------
| MEM= 3, UNIT KIP-INCH, L= 100.0 AX= 4.44 SZ= 11.8 SY= 1.7|
| KL/R-Y= 114.3 CB= 1.00 YLD= 36.00 ALLOWABLE STRESSES: FCZ= 18.71 |
| FTZ= 21.60 FCY= 27.00 FTY= 27.00 FC= 11.09 FT= 21.60 FV= 14.40 |
-----------------------------------------------------------------------

50. FINISH

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 10 of 11


Friday, November 20, 2020, 10:31 AM
STAAD SPACE -- PAGE NO. 11

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= NOV 20,2020 TIME= 10:10:25 ****

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2014 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************

C:\NEWMARK\PROJECTS\E17030-TRASNCONTINENTAL CALL IN\NEWARK TERMINAL 1\FBE ROOF\STAAD\REPAIR17.anl Page 11 of 11


Miscellaneous Technical References
From: Charlie Chin
To: Glenn Newmark
Cc: Glenn Newmark; Doron Brand
Subject: FW: RFI #11 FBE RTU Pipe Supports Installed Angle vs reviewed W8x15
Date: Wednesday, October 14, 2020 1:51:15 PM
Attachments: W8x15.pdf

Glenn,

Please see attached.


We are waiting for location of the 3,5000 lb load on the beam.
Please set up model to analyze the (3) green beams and on how to locally reinforce them where
need be.
For the 3 green beams:
We installed L6x 3-1/2” x 3/8”
Option 1: replace with W8x15
Option 2: Sister it with L6x3-1/2” x 3/8”, “They would need to be bolted together for shear
transfer (3/4” A325 bolt @ 12” OC).” Per email below

Please try these solutions:


For dimension A = 12’-10-1/8” or less, see where is overstressed provide localized
reinforcement. This is the bulk of work because we have (6) pier locations
For dimension A = 17’-0”, there is only one location, work on this last.

Thank you,
Charlie

From: Charlie Chin


Sent: Wednesday, October 14, 2020 1:37 PM
To: Frank Duba <FDuba@perini.com>
Cc: Doron Brand <doron@transsteel.net>; Terry Flynn <TFlynn@perini.com>; Ahmed Ali
<AAli@perini.com>
Subject: RE: RFI #11 FBE RTU Pipe Supports Installed Angle vs reviewed W8x15

Frank,

We won’t be able to do the back-to-back for the middle beam.


Please markup and show point loads, 3500 lbs, etc. on the drawing, so my engineer can analyze and
reinforce where need be and submit an alternate solution for review.

Need point load ASAP please.

Thank you,
Charlie
From: Frank Duba <FDuba@perini.com>
Sent: Tuesday, October 13, 2020 4:37 PM
To: Charlie Chin <cchin@transsteel.net>
Cc: Doron Brand <doron@transsteel.net>; Terry Flynn <TFlynn@perini.com>; Ahmed Ali
<AAli@perini.com>
Subject: RE: RFI #11 FBE RTU Pipe Supports Installed Angle vs reviewed W8x15
 
STV has rejected the use of the single angle in-lieu of the W8.
 
They do provide the following option: 
 
“To get it to work for the ~3500 lb units, we would need a double angle. So if one angle is already
installed, you could add a second back-to-back angle. They would need to be bolted together for
shear transfer (3/4” A325 bolt @ 12” OC).”
 
I reviewed this issue with Ahmed and Terry, and Ahmed provided the attached email to Doron
showing that the pieces in question were taken off as W8x15’s. I was not involved in Ahmed’s and
Doron’s conversations scoping the work, but would think that this would have been flagged if there
was any question.
 
 
 
 
From: Charlie Chin [mailto:cchin@transsteel.net]
Sent: Wednesday, September 23, 2020 1:15 PM
To: Frank Duba <FDuba@perini.com>
Cc: Doron Brand <doron@transsteel.net>
Subject: RFI #11 FBE RTU Pipe Supports Installed Angle vs reviewed W8x15
 
Frank,
 
Attached, please find the RFI #11 FBE RTU Pipe Supports Installed Angle vs reviewed W8x15.
 
Thank you,
Charlie
 
From: Frank Duba <FDuba@perini.com>
Sent: Wednesday, September 23, 2020 7:42 AM
To: Doron Brand <doron@transsteel.net>; Charlie Chin <cchin@transsteel.net>
Cc: Ahmed Ali <AAli@perini.com>
Subject: Returned Submittals
 
Please see attached.
 
 
Frank Duba
Tutor Perini Civil Group
1000 Main Street
New Rochelle, NY 10801
T: 914-739-1908
C: 914-441-3743
 
 

This email message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any
unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply
email and destroy all copies of the original message.

THIS COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER AND PROVIDES OPPORTUNITIES TO SMALL, WOMAN OWNED,
MINORITY OWNED, LOCALLY OWNED, VETERAN OWNED, DISABLED OWNED, AND DISADVANTAGED BUSINESSES (M/F/V/D).
 

This email message is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any
unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply
email and destroy all copies of the original message.

THIS COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER AND PROVIDES OPPORTUNITIES TO SMALL, WOMAN OWNED,
MINORITY OWNED, LOCALLY OWNED, VETERAN OWNED, DISABLED OWNED, AND DISADVANTAGED BUSINESSES (M/F/V/D).