PT.

METITO INDONESIA
TESTING REPORT
Project : Revitalisasi WWTP PLTU Barru
Date : 03 November 2021

TESTING
AMPERE VIBRATION
NO DESCRIPTION TAG NAME CHECK POIN  PRESSURE  DOKUMENTASI REMARK
TEMP (°C) DE NDE
(TIME) R S T (BAR)
V H A V H A
1 NETO 65.40-250 14.55 14.7 14.8 13.7 0.2 0.2 0.3 0.4 0.3 0.6
S/N : 21-0494/2
15.20 14.8 14.7 13.8 0.2 0.2 0.3 0.8 0.3 0.3
PUMP A1 2.3 37.0-50.0

15.50 14.9 14.8 13.6 0.2 0.2 0.3 0.6 0.6 0.4

2 NETO 65.40-250 14.57 14.8 14.8 13.7 0.2 0.4 0.4 0.6 0.3 0.6
S/N : 21-0494/1
15.21 14.6. 14.7 13.6 0.2 0.4 0.4 0.3 0.4 0.3
PUMP B1 2.3 35-47.7

15.51 14.8 14.8 13.6 0.2 0.4 0.4 0.6 0.4 0.4

3 NETO 65.40-250 16.05 14.7 14.8 13.7 0.2 0.2 0.3 0.6 0.3 0.6
S/N : 21-0494/3
16.35 14.8 14.7 13.8 0.2 0.2 0.3 0.6 0.4 0.6
PUMP 2A 2.3 39.0-50.5

16.55 14.9 14.8 13.6 0.2 0.2 0.3 0.8 0.8 0.8

4 NETO 65.40-250 16.10 11.9 11.8 13.7 0.2 0.6 0.4 0.2 0.3 0.4 No Load
S/N : 21-0494/4
16.36 11.6 11.5 13.6 0.2 0.4 0.4 0.1 0.3 0.4
PUMP 2B 35.5-48.9

17.05 14.6 14.8 13.6 0.3 0.2 0.3 0.2 0.3 0.3

Tested By Withnessed by:


PT. METITO INDONESIA PT. INDONESIA POWER

( ANDI ZULHAJ ) (…………………………………)