Professional Documents
Culture Documents
GENERAL
All center to be aligned and respected as requested.
Contractor to verify floor joist layouts prior to construction so
as to avoid layout conflict with recess lighting.
SUB CONTRATORS
GENERAL ARRANGEMENT - UPPER LEVEL Working drawings for all cabinets and stone works required
1 Scale: 1/4” = 1’ - 0” for Client and Dejager Design approval.
Finish samples are required for all finishing and surfaces for
Client and Dejager Design approval prior to placing orders.
Sub contractor to provide fabricated samples of marble edge
details foe Dejager Design approval.
Sub contractor to filed verify all dimensions prior to production.
All variations to this plan to be confirmed with designer.
YESO
TERRACE
MORTERO FINO
GYM BATH
PIEDRA
MADERA
BATH 5
OTROS RECUBRIMIENTOS: BEDROOM 5
LAMBRIN, MARMOL, AZULEJO,
VER DISEÑO DE INTERIORES
GARAGE
GYM
WIC 5
ELEVATOR
OPEN TO BELOW
OPEN TO BELOW
TERRACE
WIC 6
MASTER
GOFT CART BATH 6 PAVILION BEDROOOM WIC 2
WIC 4 BEDROOM 4
MASTER BATH 2
BATH 4
TERRACE
ID.P.200
1 _ _ /_ _ /_ _ ... SCALE: AS SHOWN
BUENA VISTA 2 _ _ /_ _ /_ _ ... SHEET:
_ _ /_ _ /_ _
...