Professional Documents
Culture Documents
CLIENT:
Mr. Daifallah Al-Harbi
1
Plans
Sheet Title
A
Basement & Ground Floor 2
3
Ground Floor - Floors Plan
Ground Floor - Ceilings Plan
.2
.3
.4
.5
ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
ALL FINISHES REFER TO SCHEDULES OF FINISHES
DO NOT SCALE FROM THIS DRAWING.
CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
4 Ground Floor - Furniture Plan .6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
Shop Drawing 5
6
Ground Floor - Electrical Plan
Ground Floor - Water Supply
.7
.8
.9
CONSTRUCTION.
CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
300
NEEDED.
7 Ground Floor - Drainage
B Jalsah
GF 01 Area=25.6m2 D Ground Floor
440 8 GF-01-Dining - Elevation A
9 GF-01-Dining - Elevation B
10 GF-01-Dining - Elevation C
11 GF-01-Dining - Elevation D
A 12 GF-01-Hall Sitting - Elevation A
13 GF-01-Hall Sitting - Elevation B
14 GF-01-Hall Sitting - Elevation D
15 GF-01-Hall Sitting - Kitchen D
16 GF-01-Hall Sitting - Kitchen C
17 GF-01-Hall Sitting - Kitchen A
18 GF-01-Hall Stair - Stair C
19 GF-01-Hall Stair - Stair B&D
A A
20 GF-01-Hall Stair - Sitting C
21 GF-01-Hall Stair - Sitting B&D
B Corridor
D
160
GF 01 Area=6.7m2
22 GF-01-Hall Stair - Sitting A
420
23 GF-01-Hall Stair - Sitting B'
C 24 GF-01-Hall Stair - Sitting C'
25 GF-01-Hall - Wall Name Plan
26 GF-01-Hall - Floor Plan
27 GF-01-Hall - Ceiling Plan
28 GF-01-Hall - Furniture Plan
29 GF-01-Hall - Electrical Plan
30 GF-01-Hall - Corridor A
31 GF-01-Hall - Corridor B&D
A 32 GF-01-Hall - Corridor C
33 GF-01-Hall - Lobby C&D
B Hall Stair
D
450
GF 01 Area=19.8m2
B Dinning
D
820
440
GF 01Area=37.7m2 34 GF-01-Hall - Lobby A&B
Hall Sitting 460
GF 01 Area=76.3m2 35 GF-02-Women Bath - Plans
36 GF-02-Women Bath - Bath A&B
B D
1358
600
37 GF-02-Women Bath - Wash A
B Women Wash
D
350
GF 02 Area=6.3m2
38 GF-02-Women Bath - Wash C
180
39 GF-02-Women Bath - Plumbing
40 GF-02-Women Bath - Bath C&D
C 41 GF-02-Women Bath - Wash D
42 GF-02-Women Bath - Wash B
A 43 GF-03-Men Entrance - Wall Name Plan
C
44 GF-03-Men Entrance - Floor Plan
A 45 GF-03-Men Entrance - Ceiling Plan
A Kitchen
D
180
GF 01 Area=4.7m2
46 GF-03-Men Entrance - Furniture Plan
B Lobby
D
130
260
GF 01 Area=2.4m2
47 GF-03-Men Entrance - Electrical Plan
181
48 GF-03-Men Entrance - Elevation A
C C C
49 GF-03-Men Entrance - Elevation B
B Women Bath
D No. Revision/Issue Date
250
GF 02 Area=4.5m2
50 GF-03-Men Entrance - Elevation C
180 A A A
51 GF-03-Men Entrance - Elevation D
52 GF-03-Men Dining - Wall Name Plan
53 GF-03-Men Dining - Floor Plan
C
54 GF-03-Men Dining - Ceiling Plan
55 GF-03-Men Dining - Furniture Plan
Drawn By: SA Checked By: HM
56 GF-03-Men Dining - Electrical Plan
57 GF-03-Men Dining - Elevation A
58 GF-03-Men Dining - Elevation B PROJECT NAME: DHV - PRIVATE VILLA
GF 03Area=27.6m2 GF 03Area=22.8m2 61 GF-03-Men Sitting - Wall Name Plan CLIENT: Daifallah Al-Harbi
460 380
62 GF-03-Men Sitting - Floor Plan
B Men Sitting
D
700
GF 03Area=30.8m2
63 GF-03-Men Sitting - Ceiling Plan
440
64 GF-03-Men Sitting - Furniture Plan Drawing Title:
Hall , Sittings & Dining 65 GF-03-Men Sitting - Electrical Plan
66 GF-03-Men Sitting - Elevation A GROUND FLOOR - WALL NAME PLAN
67 GF-03-Men Sitting - Elevation B
68 GF-03-Men Sitting - Elevation C SHEET NO.:
Kitchens , Baths , Washes 69 GF-03-Men Sitting - Elevation D Date : 01 / 04 / 2021
1
Laundry & Storage 70 GF-04-Men Bath - Plans
71 GF-04-Men Bath - Bath A&B Scale : 1:50 REV. No. 1
C C
72 GF-04-Men Bath - Wash A&B Paper Size : A1
73 GF-04-Men Bath - Wash C&D
A A Bedrooms & Dressing 74 GF-04-Men Bath - Plumbing
C 75 GF-04-Men Bath - Bath C&D
Basement
B Men Wash
D B Men Bath
D
200
200
GF 04 Area=4.0m2 GF 04 Area=3.6m2
200 180
76 BF-01-Sitting - Wall Name Plan
Terraces , Balcony & Roofs 77 BF-01-Sitting - Floor Plan
78 BF-01-Sitting - Ceiling Plan
C C
79 BF-01-Sitting - Furniture Plan
80 BF-01-Sitting - Electrical Plan
81 BF-01-Sitting - Elevation A&C
Un Designed Zones 82 BF-01-Sitting - Elevation B&D
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
02-Gravel 02-Gravel
SP
SP
Drawing Title:
SHEET NO.:
2
Date : 01 / 04 / 2021
Paper Size : A1
SP
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Ceiling Symbols
Hidden Light
Decorative Gyps
Golden Frames
Section Line
Spot Light
Pendant Lights
Mirror
Glass
Drawing Title:
SHEET NO.:
3
Date : 01 / 04 / 2021
Paper Size : A1
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Drawing Title:
SHEET NO.:
4
Date : 01 / 04 / 2021
Paper Size : A1
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
M ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
NOTE :
1- ALL DIMENSIONS ARE IN CENTIMETER .
2- ALL SWITCHES NEXT TO DOORS ARE FAR 15 CM
FROM DOORS EDGES .
3- blue numbers refers to command port .
4- magenta numbers refers to responded device .
5- All Symbols colors Refers To its High From
Finishing Floor
Movement Sensor
M
Ventilation Point
P Interphone
Switch
Telerupteur
Bell
U.S. Outlet
Choco Outlet
Safety Outlet
Main Board
Phone Outlet
Sound Outlet
Sound Inlet
Receiver Outlet
V Receiver Inlet
Net Outlet
Ceiling Level
Floor Level
Drawing Title:
SHEET NO.:
5
Date : 01 / 04 / 2021
Paper Size : A1
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
D7
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
D7
D8
D8
D6
D6
D8
D8
Water Supply Symbols Schedule No. Revision/Issue Date
D8
SYMBOL Description High
Drawing Title:
Hot & Cold Water Supply (60 cm High)
Ground Floor - Water Supply
Paper Size : A1
D6
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
D7
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
D7
D8
D8
D6
D6
D8
D8
Drainage Symbols Schedule No. Revision/Issue Date
D8
SYMBOL Description Size
Drawing Title:
5% SLOP WASTE PIPE (4" inches)
Ground Floor - Drainage
GULLY TRAP
(30X30 cm)
(30 cm) HIGH
DHV - Design Development
DHV - Design Development
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
30
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
70
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
15 5 20
NEEDED.
FCL.-50CM
10
Gypum Cornice Detail 06
160 10 250 10 30
340
Key Plan
W1 W1 W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
20 10
Drawing Title:
GF-01-Dining - Elevation A
SHEET NO.:
8
Date : 01 / 04 / 2021
Paper Size : A3
10 cm Dumping Sand
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
Spot Light .3
.4
.5
ALL FINISHES REFER TO SCHEDULES OF FINISHES
DO NOT SCALE FROM THIS DRAWING.
CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
Space High .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
H=465.0CM NEEDED.
30
FCL.-30CM
70
15 5 20
FCL.-50CM LED Strip Light
10
13 10
65
12 mm Green Gypsum Board
Jotun : Morning Fog 9918
5
140
85
13 150 10 70 10 147 10 70 10 200 130
Gypsum Frame
10 15
10
Key Plan
315
W1 W1 W1
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
215
Drawn By: SA Checked By: HM
Drawing Title:
GF-01-Dining - Elevation B
SHEET NO.:
9
Date : 01 / 04 / 2021
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM
30
FCL.-30CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
70
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
15 5 20
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
10
Gypum Cornice Detail 06
Gypsum Frame
Mirror
340
Applique
Key Plan
30 10 100 10 190 10 100 10
W1 W1 W1
W1 W1 W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
190
No. Revision/Issue Date
20 10
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
GF-01-Dining - Elevation C
SHEET NO.:
10
20 cm Afyon White Skirting Date : 01 / 04 / 2021
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
30
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
FCL.-30CM EXECUTION OF WORK.
50
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
70
NEEDED.
15 5 20
FCL.-50CM LED Strip Light
20
Gypum Cornice Detail 05
10
Gypum Cornice Detail 06
Sen Wood
170
Afyon White 160 5 60 50 50 50 50 50 50 50 50 60 5 130
Gypsum Frame
370
Key Plan
110
W1 W1 W1
W1 W1 W1
Width
W1
Width
W1
W1
Width
Width
W1
W1
Width
Width
W1
W1
Width
Width
W1
W1
Width
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
30
130
130
No. Revision/Issue Date
5 45 55 55 45 60 60 45 55 55 45 5
83
90
25
D Sectional Elevation
1/30 D-D
25
Drawn By: SA Checked By: HM
8
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
30 mm Thikness Marble
GF-01-Dining - Elevation D
20 mm Cement Mortar
SHEET NO.:
10 cm Dumping Sand 11
Date : 01 / 04 / 2021
Paper Size : A3
30
01 Hotrizontal Section
1/30
DHV - Design Development
DHV - Design Development
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
30
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
FCL.-30CM .5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
70
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
15 5 20
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Sen Wood
Afyon White
230
Key Plan
W1 W1 W1
Width Width Width
W1 W1 W1
Width Width Width
Width
W1
Width
W1
Width
W1
Width
W1
125 200 75 110 110
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
60
No. Revision/Issue Date
90
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
12
Date : 01 / 04 / 2021
Paper Size : A3
30 mm Thikness Marble
A Sectional Elevation
1/25 20 mm Cement Mortar
A-A
10 cm Dumping Sand
Space High
#########
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
30
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
FCL.-30CM .5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
70
EXECUTION OF WORK.
15 5 20
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
10
Gypum Cornice Detail 06
10 80 10 115 10 135 10
Gypsum Frame
03
Detail
Applique
340
Key Plan
W1 W1 W1
Width Width Width
W1 W1 W1
Width Width Width
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
20 10
Drawing Title:
SHEET NO.:
13
Date : 01 / 04 / 2021
Paper Size : A3
30 mm Thikness Marble
B Sectional Elevation
1/25 B-B 20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM
30
General Notes
FCL.-30CM .1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
70
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
15 5 20
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
10
Gypum Cornice Detail 06
95
95
Sen Wood
100 100 100 60 10 120 10
5
30
30
Gypsum Frame
5
30
5
340
30
5
Key Plan
30
W1 W1 W1
Width Width Width
205
W1 W1 W1
5
Width Width Width
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
30
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
5
Width Width Width
W1 W1 W1
30
No. Revision/Issue Date
5
30
Drawn By: AK Checked By: HM
5
Sectional Elevation
5
D DHV - PRIVATE VILLA
PROJECT NAME:
1/25 D-D
10
PROJECT No.: RI-20-111
30
30
LOCATION: DAMMAM - KSA
20
CLIENT: Daifallah Al-Harbi
5
5
Drawing Title:
SHEET NO.:
14
Date : 01 / 04 / 2021
Paper Size : A3
30 mm Thikness Marble
20 mm Cement Mortar
5 65 5 45 5 50 5 45 5 65 5
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
50
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
FCL.-50CM .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
15
12 15
Gypum Cornice Detail 06
Gypsum Frame
195
40 10 200 10
Applique
315
Key Plan
W1 W1 W1
Width Width Width
W1 W1 W1
Width Width Width
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
100
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
190
90 Drawn By: SA Checked By: HM
20 10 12
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
16
Date : 01 / 04 / 2021
Paper Size : A3
20 cm Afyon White Skirting
30 mm Thikness Marble
20 mm Cement Mortar
C Sectional Elevation
1/25 C-C 10 cm Dumping Sand
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
50
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-50CM
15
Gypum Cornice Detail 06
Sen Wood
Afyon White
195
LED Hidden Light
55 55 55 55 40
Key Plan
W1 W1 W1
W1 W1 W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
100
Width
W1
Width
W1
W1 W1 W1
90
LOCATION:
CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
17
Date : 01 / 04 / 2021
Paper Size : A3
A Sectional Elevation
1/25 A-A
DHV - Design Development
DHV - Design Development
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
Space High .3
.4
ALL FINISHES REFER TO SCHEDULES OF FINISHES
DO NOT SCALE FROM THIS DRAWING.
H=860.0CM .5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
35
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-35CM
10 10 5 15 5 10
FCL.-50CM
FCL.-70CM
12 mm Green Gypsum Board
125 10 13 30 13 10 10 220 10
170
Jotun : Morning Fog 9918
5
Gypsum Frame
85
Mirror
65
20
13 10 10 15
Key Plan
W1 W1 W1
W1 W1 W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
150
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
20 10 13
15
Drawn By: WB Checked By: HM
SHEET NO.:
18
Date : 01 / 04 / 2021
10 cm Dumping Sand
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
Space High Space High .3
.4
ALL FINISHES REFER TO SCHEDULES OF FINISHES
DO NOT SCALE FROM THIS DRAWING.
H=860.0CM H=860.0CM .5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
35
35
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-35CM FCL.-35CM
13 10 5 15 5 10
10 10 5 15 5 10
FCL.-50CM FCL.-50CM
FCL.-70CM FCL.-70CM
12 mm Green Gypsum Board 12 mm Green Gypsum Board
170
Jotun : Morning Fog 9918
230
Gypsum Frame 5 30 5 10 170 10 5 50 5
5
Applique
85
65
155
20
12 10 10 15
Key Plan
200 10 13 5 13 10 13 88 12 10 13 82 13 10
W1 W1 W1
Spot Light
20 10 13
W1 W1 W1
Width
W1
10 13 90 13 10 13 75 13 10 13 10 13 10 200
Width
W1
Width
W1
Width
W1
Jotun : Morning Fog 9918
Width
W1
Width
W1
W1
Width
Golden Frame
Width
W1
13 10 10 15
Gypsum Frame
Width
W1
Spot Light
Width
W1
Width
W1
Width Width Width
W1 W1 W1
150
Width
W1
90
90
Width
W1
Width
W1
W1 W1 W1
20 10 13
290
150
15
10 30 10 113 10 107 10
Drawn By: WB Checked By: HM
5
20 10 13
290
PROJECT NAME: DHV - PRIVATE VILLA
Sen Wood RI-20-111
PROJECT No.:
112
LOCATION: DAMMAM - KSA
Spot Light CLIENT: Daifallah Al-Harbi
42
20 90
Spot Light
Drawing Title:
13
12
30
30
GF-01-Hall Stair - Stair B&D
SHEET NO.:
19
Date : 01 / 04 / 2021
30
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
FCL.-30CM .9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
15 5 20
FCL.-50CM LED Strip Light
Key Plan
360
Drawing Title:
SHEET NO.:
20
Date : 01 / 04 / 2021
Paper Size : A3
30
.4 DO NOT SCALE FROM THIS DRAWING.
40
FCL.-30CM .5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
20
CONSTRUCTION.
12 10 15 5 10
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
FCL.-50CM LED Strip Light EXECUTION OF WORK.
15 5
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
Gypum Cornice Detail 06 .9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Gypum Cornice Detail 05
Gypsum Frame
10 13 175 13 5 10 120 10 5 13 10 13 5 40 10 190 40 95 22 100 20 100 93
Art Work
315
360
01
Sec
20 10 13
20
20 cm Afyon White Skirting Key Plan
B Sectional Elevation 30 mm Thikness Marble
1/25 B-B W1
Width
W1
Width
W1
Width
40
10
20 mm Cement Mortar
W1 W1 W1
Width
W1
Width
W1
10 cm Dumping Sand
Width
W1
Hotrizontal Section 10
01
Width
W1
Width
W1
1/25
Width
W1
W1
Width
Width
W1
Space High 10 190 40
Width
W1
H=465.0CM
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
30
FCL.-30CM
12 10 15 5 20
No. Revision/Issue Date
FCL.-50CM LED Strip Light
Gypsum Frame
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
Art Work CLIENT: Daifallah Al-Harbi
Applique
Drawing Title:
315
70 260 200 140 40 10 110 10 180 10 13 295 13 10
GF-01-Hall Stair - Sitting B&D
SHEET NO.:
21
Date : 01 / 04 / 2021
Paper Size : A1
20 10 13
55
20 cm Afyon White Skirting
D Sectional Elevation 30 mm Thikness Marble
1/25 D-D
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
30
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
FCL.-30CM .9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
15 5 20
FCL.-50CM LED Strip Light
Key Plan
W1 W1 W1
360
W1 W1 W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
W1 W1 W1
Drawing Title:
55
20
SHEET NO.:
22
Date : 01 / 04 / 2021
Paper Size : A3
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
50
50
NEEDED.
FCL.-50CM
15 5
3 20
20
Gypum Cornice Detail 05
Golden Frame
Mirror
285
15 20 19 31 60 3 60 3 60 31 19 20 Key Plan
360
375
W1 W1 W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
Width
W1
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
3 25 3 25 3 23 3 Width
W1
Width
W1
Width
W1
140
5
Drawn By: WB Checked By: HM
90
Drawing Title:
15 3 SHEET NO.:
23
Date : 01 / 04 / 2021
Paper Size : A3
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
30
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
FCL.-30CM .9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
50
NEEDED.
20
15 5 20
FCL.-50CM LED Strip Light
20
Gypum Cornice Detail 06
10 10
Gypum Cornice Detail 05
90
Afyon White Marble
3
Gypsum Frame
44
LED Hidden Light
3
Sen Wood Key Plan
65
10 290 10 40 150 50 40 10 W1
Width
W1
Width
W1
Width
W1 W1 W1
360
Width
W1
Width
W1
Width
W1
Width
W1
230
Width
W1
Width
W1
3
W1
Width
Width
W1
Width
W1
Width
W1
Width
W1
Width Width Width
W1 W1 W1
Width
W1
Width
W1
Width
W1
65
No. Revision/Issue Date
3 45 3 50 3 45 3
3
Drawn By: WB Checked By: HM
44
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
60
SHEET NO.:
24
Date : 01 / 04 / 2021
15
Paper Size : A3
20 mm Cement Mortar
10 cm Dumping Sand
A General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
300
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
B Jalsah
GF 01 Area=25.6m2 D
440
A A
B Corridor
D
160
GF 01 Area=6.7m2
420
Key Plan
B Hall Stair
D
450
GF 01 Area=19.8m2
B Dinning
D
820
GF 01Area=37.7m2
440
Hall Sitting 460
GF 01 Area=76.3m2
B D
1358
600
No. Revision/Issue Date
GF 01 Area=4.7m2
B Lobby
D
130
260
GF 01 Area=2.4m2
Drawing Title:
181
SHEET NO.:
25
Date : 01 / 04 / 2021
Paper Size : A2
C
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
830
01-Afyon White
60
Key Plan
60
840
SP
Drawing Title:
SHEET NO.:
26
Date : 01 / 04 / 2021
Paper Size : A2
02 Floor Plan
1/50
13 35 10 10
3 17
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
13 5
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
10 10 35 13 200 13 35 10 40 .7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
17 3 5 13 13 5 3 17 .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
150
NEEDED.
FCL.-50 CM
5 13
15 13
13 45 10 20
3 17
90
13 5
FCL.-50 CM
5
FCL.-50 CM
15
FCL.-50 CM
17 4 4 16
30 10 340 10 21
430
FCL.-30 CM
50 15 9 383 9 15 50 55 13 195 11 55 10 30
7 40 34 7 3 5 10 11 5 3 17
Key Plan
5 13
17 3 45 13
FCL.-30 CM
10 10
40
20
11 10
5
3 26
15
3 16
11
FCL.-50 CM
100
10 40
13
FCL.-50 CM
120
FCL.-50CM
16 3 3 16 FCL.-30 CM
10 11 90 11 10 SHEET NO.:
365
27
16 3
10 11
Date : 01 / 04 / 2021
Paper Size : A2
16 3 5 13 13 5 3 16
10 11 40 13 180 13 40 11 10
5 13
11 40 13
03 Ceiling Plan
1/50
16 3
15
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Key Plan
Drawing Title:
SHEET NO.:
28
Date : 01 / 04 / 2021
Paper Size : A2
04 Furniture Plan
1/50
M
General Notes
78
79
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
12 12 .2
WALLS, FLOORS AND CEILINGS
ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
15 .4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
14 .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
205
12 13 12 NEEDED.
78 255 108
12
12 12
M
15
90 80 60
84
50
98
11
188
6 6 1+2+3+4+5+6+7+8
80
11
37
11 220 11 220 11 180
6 6
11+12+13+14+15
18+19+20+21 25+26+27
M 30
93
15
80
34
11 11 25 150 25 130 25 80
260
80
100
485
8 26
133
27
11 11 11 11 24 24
105
110 140 140 110 11
10 10
6 6
5 Key Plan
98 415 88
160
16+17
6
6 6
24 19 24
105
21
88
6
5
40
160
3
16
90
90
18
7
85 1 200 100 98 245 118
24 24
65
105
18+19+20+21
110
13
3 PROJECT NAME: DHV - PRIVATE VILLA
80
65
9 9 10
110
3 3
60
2 3 22 90 22 50
9
110
9 9 10 Drawing Title:
65
35 60 310
40
23
1 9+10 20 20 22+23 GF-01-Hall - Electrical Plan
90
3 SHEET NO.:
420
4
1+2+3+4+5+6+7+8 29
Date : 01 / 04 / 2021
55
Paper Size : A2
3 235 3 83
140
05 Electrical Plan
110
110
1/50
88
Space High
H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
55
FCL.-50CM
15
Gypum Cornice Detail 01
5 10
12 mm Green Gypsum Board
3 5
Gypsum Frame
Key Plan
315
No. Revision/Issue Date
Drawing Title:
GF-01-Hall - Corridor A
20
SHEET NO.:
30
Date : 01 / 04 / 2021
Paper Size : A3
20 mm Cement Mortar
10 cm Dumping Sand
Space High Space High
H=465.0CM H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
55
55
FCL.-50CM FCL.-50CM
15
15
Gypum Cornice Detail 01 Gypum Cornice Detail 01
2 3
5
12 mm Green Gypsum Board 12 mm Green Gypsum Board
Key Plan
370
No. Revision/Issue Date
220
Drawing Title:
SHEET NO.:
31
Date : 01 / 04 / 2021
Paper Size : A3
55
FCL.-50CM
5 10 15
Gypum Cornice Detail 01
3 5
35
Jotun : Morning Fog 9918
5 2
5 10 5
2 3
Gypsum Frame
Applique
Key Plan
290
No. Revision/Issue Date
10 13 155 13 10 10 144 10 5 3 3 5
Drawn By: SA Checked By: HM
10 5 10 5 11
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
GF-01-Hall - Corridor C
SHEET NO.:
32
Date : 01 / 04 / 2021
Paper Size : A3
20 mm Cement Mortar
10 cm Dumping Sand
Space High Space High
H=465.0CM H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
55
55
FCL.-50CM FCL.-50CM
15
15
Gypum Cornice Detail 01 Gypum Cornice Detail 01
160
160
Key Plan
220
Drawn By: SA Checked By: HM
Drawing Title:
SHEET NO.:
33
Date : 01 / 04 / 2021
Paper Size : A3
55
55
FCL.-50CM FCL.-50CM
5 15
35 5 10 15
Gypum Cornice Detail 01 Gypum Cornice Detail 01
2 3
12 mm Green Gypsum Board 12 mm Green Gypsum Board
Gypsum Frame
Key Plan
315
370
20 10 5 52
Drawing Title:
SHEET NO.:
34
Date : 01 / 04 / 2021
Paper Size : A3
30 10
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
10
160
01-Afyon White
FCL.-50CM
90
SP
20
110
06-Black Taurus
1 1
45
10
10
30 120 30
40
1 1
A 2
60 1+2
1 1
15
60
20
170
55 1 65
90
Key Plan
SP
80
B 10 30 100 30 10
125
1
B Women Wash
D
350
GF 02 Area=6.3m2
10 30
35
180
3+4
30
3 3 No. Revision/Issue Date
25 20
95
02 Floor Plan Ceiling Plan
03
1/50 C 1/50
3 3
Drawn By: MH Checked By: HM
90
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
35 3 115 3 30
35
4 Drawing Title:
B Women Bath
D GF-02-Women Bath - Plans
250
GF 02 Area=4.5m2
Paper Size : A3
C
05 Electrical Plan
1/50
25
25
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
FCL.-25CM FCL.-25CM .6
BEFORE ANY CONSTRUCTION COMMENCES.
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
25
25
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
15
15
Gypum Cornice Detail 01
135
165
90 Travertino Romano Classico
Key Plan
15 65 80 80 10
65 110 5
220
Mirror
130
PROJECT NAME: DHV - PRIVATE VILLA
15
Drawing Title:
30
SHEET NO.:
36
Date : 01 / 04 / 2021
Paper Size : A3
25
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
FCL.-25CM .6
BEFORE ANY CONSTRUCTION COMMENCES.
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
25
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
5 15
Gypum Cornice Detail 01
55 7
Jotun : Stone 0555
Applique
231
295
5 7 55 46 55 7 5 80 10 Key Plan
7 55
No. Revision/Issue Date
65
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
20
SHEET NO.:
37
Date : 01 / 04 / 2021
Paper Size : A3
20 cm (marble) Skirting
A Sectional Elevation
1/25 A-A 30 mm Thikness Marble
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
25
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
FCL.-25CM .6
BEFORE ANY CONSTRUCTION COMMENCES.
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
25
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
8 10 15
Gypum Cornice Detail 01
10 8 85 8 10 10 8 25 8 10
130
10 8
10
Key Plan
200
No. Revision/Issue Date
220
Drawn By: MH Checked By: HM
Drawing Title:
20
GF-02-Women Bath - Wash C
SHEET NO.:
38
Date : 01 / 04 / 2021
Paper Size : A3
C Sectional Elevation
1/25 C-C 30 mm Thikness Marble
20 mm Cement Mortar
10 cm Dumping Sand
W1
Width
W1
Width
General Notes
58
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
115
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
35
20
24
65
105
34
Width
W1
Width
W1
Key Plan
55
Drawing Title:
COLD WATER PIPE ___
5% SLOP WASTE PIPE (4" inches)
PVC GF-02-Women Bath - Plumbing
SHEET NO.:
39
HOT WATER PIPE ___ Date : 01 / 04 / 2021
VERTICAL WASTE PIPE
(4" inches)
PVC Scale : 1:50 REV. No. 1
Paper Size : A3
25
25
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
FCL.-25CM FCL.-25CM .6
BEFORE ANY CONSTRUCTION COMMENCES.
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
25
25
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
15
15
Gypum Cornice Detail 01 Gypum Cornice Detail 01
Black Taurus
Key Plan
01
Sec
Drawing Title:
SHEET NO.:
40
Date : 01 / 04 / 2021
Paper Size : A3
20 mm Cement Mortar
15
1/25
40 100 40
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
25
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
FCL.-25CM .6
BEFORE ANY CONSTRUCTION COMMENCES.
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
50
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
25
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
8 10 15
50
10 8
Jotun : Stone 0555
147
Art Work
Key Plan
110
300
No. Revision/Issue Date
PROJECT NAME:
10 187 8 10 135 PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
41
Date : 01 / 04 / 2021
Paper Size : A3
20 cm (marble) Skirting
D Sectional Elevation
1/25 D-D 30 mm Thikness Marble
20 mm Cement Mortar
10 cm Dumping Sand
Space High
H=465.0CM
General Notes
25
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
FCL.-25CM ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
50
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
25
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
10 15
NEEDED.
8 9
12 mm Green Gypsum Board
130
10 8 30 8 10 8 30 8 10 5 30 5 55 5 13 4 13 5 55 5 13 4 13 5
275
10 8
Gypsum Frame
Mirror
Key Plan
Sink
200
15 10 5
20
Drawn By: MH Checked By: HM
01
Sec PROJECT NAME: DHV - PRIVATE VILLA
Drawing Title:
Paper Size : A3
01 Hotrizontal Section
60
Key Plan
B Men Entrance
D
600
GF 03Area=27.6m2
460
Drawing Title:
SHEET NO.:
43
Date : 01 / 04 / 2021
Paper Size : A3
300
Key Plan
230
SP
60
60
No. Revision/Issue Date
01-Afyon White
Drawing Title:
SHEET NO.:
44
Date : 01 / 04 / 2021
Paper Size : A3
02 Floor Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
80
40 10
FCL.-50 CM
30
5 30
Key Plan
FCL.-25 CM
25
290
10 38 3 30 30 5 230 5 30 30 3 38 10
30 5
30 Drawn By: AK Checked By: HM
Drawing Title:
SHEET NO.:
45
Date : 01 / 04 / 2021
Paper Size : A3
03 Ceiling Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Key Plan
Drawing Title:
SHEET NO.:
46
Date : 01 / 04 / 2021
Paper Size : A3
04 Furniture Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
1 1 4
85
1 1
Key Plan
115
377
2 1
1
115
No. Revision/Issue Date
1 1
85
4 Drawn By: AK Checked By: HM
60 85 170 85
4 1 1 PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
83
LOCATION: DAMMAM - KSA
1+2+3+4+5
60
53
Drawing Title:
SHEET NO.:
47
Date : 01 / 04 / 2021
Paper Size : A3
05 Electrical Plan
1/50
Space High
H=465.0CM General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
25
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
FCL.-25CM CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
50
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
25
NEEDED.
FCL.-50CM
5 8 10 8
2
Gypum Cornice Detail 10
2
LED Strip Light
55
LED Hidden Light 35 55 55 35
5
Mirror
55
Walnut Mexican
5
Golden Frame
55
Sand Mirror
5
55
Key Plan
5
55
SHEET NO.:
48
Date : 01 / 04 / 2021
Paper Size : A3
40
45
80
30 5 60 5 25 15 180 15 25 5 60 5 30
01 Hotrizontal Section
1/30
Space High
H=465.0CM
General Notes
25
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
FCL.-25CM .2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
50
50
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
25
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
FCL.-50CM NEEDED.
15 10
30
Gypum Cornice Detail 10
5
12 mm Green Gypsum Board
Jotun : Candle Wax 1774
55
Gypsum Frame
5
10 85 10 325 10 Art Work
70 10 35 45
55
5
310
55
Applique
5
Key Plan
55
5
No. Revision/Issue Date
55
Drawn By: AK Checked By: HM
10 15
70
B Sectional Elevation LOCATION: DAMMAM - KSA
Daifallah Al-Harbi
1/25 B-B
CLIENT:
40
Drawing Title:
SHEET NO.:
49
Date : 01 / 04 / 2021
Paper Size : A3
40 cm Afyon White Skirting
30 mm Thikness Marble
20 mm Cement Mortar
10 cm Dumping Sand
12
B Sectional Elevation
1/25 B-B
105 25 275 25 90 35 45
Space High
H=465.0CM
General Notes
25
FCL.-25CM .1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
50
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
25
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
FCL.-50CM .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
25
NEEDED.
93
400
105
360
Key Plan
140
Drawn By: AK Checked By: HM
95
40
C Sectional Elevation CLIENT: Daifallah Al-Harbi
1/25 C-C
Drawing Title:
SHEET NO.:
50
Date : 01 / 04 / 2021
30 mm Thikness Marble
20 mm Cement Mortar
10 cm Dumping Sand
12
25 145 25
Space High
H=465.0CM
General Notes
25
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
FCL.-25CM WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
50
50
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
25
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
FCL.-50CM .9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
10
NEEDED.
30
Gypum Cornice Detail 10
5
12 mm Green Gypsum Board
Jotun : Candle Wax 1774 55
Walnut Mexican
5
Applique
55
5
45 35 10 80 15 230 10 165 10
340
55
Gypsum Frame
5
Key Plan
55
5
190
10
PROJECT NAME: DHV - PRIVATE VILLA
70
40
D-D
Drawing Title:
SHEET NO.:
51
Date : 01 / 04 / 2021
Paper Size : A3
01 Hotrizontal Section
12
1/25
30
Key Plan
B Dinning
D
600
GF 03Area=22.8m2
380
Drawing Title:
SHEET NO.:
52
Date : 01 / 04 / 2021
Paper Size : A3
60
23
100 15 3 135 3515 100
5
01-Afyon White
Key Plan
Start Point From Entrance
435
05-First Brown
Drawing Title:
SHEET NO.:
53
Date : 01 / 04 / 2021
Paper Size : A3
02 Floor Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
30 25 10
15
FCL.-50 CM
5 30
FCL.-25 CM
Key Plan
370
25
10 25 30 35 150 35 30 10 25
15 15
30 5
Drawn By: AK Checked By: HM
10 25 30
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
15
Drawing Title:
SHEET NO.:
54
Date : 01 / 04 / 2021
Paper Size : A3
03 Ceiling Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Key Plan
Drawing Title:
SHEET NO.:
55
Date : 01 / 04 / 2021
Paper Size : A3
04 Furniture Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
60
1 1
165
60
190
1 1
120
4
3
1 1
Key Plan
M
270
220
120
1 1
190
1+2+3+4
120
No. Revision/Issue Date
2 3
4
2 1 1
60
60 60 1 140 1 60 PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
35 310 CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
56
Date : 01 / 04 / 2021
Paper Size : A3
05 Electrical Plan
1/50
Space High
H=465.0CM
General Notes
25
FCL.-25CM .1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
70
25
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
FCL.-50CM
Gypum Cornice Detail 10 .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
20
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
10
LED Strip Light
340
Key Plan
Drawing Title:
SHEET NO.:
57
Date : 01 / 04 / 2021
10 cm Dumping Sand
Space High
H=465.0CM
25
General Notes
FCL.-25CM
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
50
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
25
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
FCL.-50CM EXECUTION OF WORK.
Gypum Cornice Detail 10 .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
20
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
10
LED Strip Light
Golden Frame
Mirror
Gypsum Frame
Applique
340
Key Plan
10 85 10 40 40 230 40 40 10 85 10
190
20 10
DAMMAM - KSA
B Sectional Elevation LOCATION:
CLIENT: Daifallah Al-Harbi
1/25 B-B
Drawing Title:
SHEET NO.:
58
Date : 01 / 04 / 2021
Paper Size : A3
12
01 Hotrizontal Section
1/25
185 25 180 25 185
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
25
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
FCL.-25CM .6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
70
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
25
NEEDED.
FCL.-50CM
Gypum Cornice Detail 10
20
Gypum Cornice Detail 08
10
LED Strip Light
Walnut Mexican
Mirror
10 50 10 40 160 40 10 50 10
Golden Frame
340
Gypsum Frame Key Plan
20 10
Drawing Title:
SHEET NO.:
59
Date : 01 / 04 / 2021
Paper Size : A3
10 cm Dumping Sand
Space High
H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
25
CONSTRUCTION.
FCL.-25CM .7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
50
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
25
FCL.-50CM
Gypum Cornice Detail 10
20
Gypum Cornice Detail 08
10
LED Strip Light
Gypsum Frame
Key Plan
340
No. Revision/Issue Date
Drawing Title:
10
GF-03-Men Dining - Elevation D
20
SHEET NO.:
60
Date : 01 / 04 / 2021
Paper Size : A3
30 mm Thikness Marble
D Sectional Elevation
1/25 D-D 20 mm Cement Mortar
10 cm Dumping Sand
DHV - Design Development
DHV - Design Development
DHV - Design Development
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Key Plan
B Men Sitting
D
700
GF 03Area=30.8m2
440
Drawing Title:
C GF-03-Men Sitting - Wall Name Plan
SHEET NO.:
61
Date : 01 / 04 / 2021
Paper Size : A3
120
23
01-Afyon White
5 5
90 15 3 195 3 15 110
Key Plan
Start Point From Entrance
435
05-First Brown
Drawing Title:
SHEET NO.:
62
Date : 01 / 04 / 2021
Paper Size : A3
02 Floor Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
40 10
FCL.-50 CM
30
35
FCL.-25 CM
25
Key Plan
450
10 40 30 35 210 35 30 40 9
Drawing Title:
30
SHEET NO.:
63
Date : 01 / 04 / 2021
Paper Size : A3
03 Ceiling Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Key Plan
Drawing Title:
SHEET NO.:
64
Date : 01 / 04 / 2021
Paper Size : A3
04 Furniture Plan
1/50
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
120
1
130
85
5
5
1 1+2+3+4+5 1
345
130
1 1
Key Plan
438
220
130
3
430
1 1
130
No. Revision/Issue Date
1 1
5 60 85 150 85 5 Drawn By: AK Checked By: HM
85
PROJECT NAME: DHV - PRIVATE VILLA
PROJECT No.: RI-20-111
1 1 LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
80
Drawing Title:
4
GF-03-Men Sitting - Electrical Plan
SHEET NO.:
65
Date : 01 / 04 / 2021
Paper Size : A3
05 Electrical Plan
1/50
Walnut Mexican
Space High
H=465.0CM
25
FCL.-25CM General Notes
50
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
25
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
FCL.-50CM CONSTRUCTION.
10
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
First Brown 03
Detail
Gypsum Frame
10 45 15 10 15 250 15 10 60 10
360
Key Plan
20 10
1/25 A-A PROJECT No.: RI-20-111
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
66
Date : 01 / 04 / 2021
20 cm Afyon White Skirting
Scale : 1:25 REV. No. 1
20 mm Cement Mortar
10 cm Dumping Sand
01 Hotrizontal Section
1/25
10
10 60 300 60 10
Space High
H=465.0CM
General Notes
25
FCL.-25CM .1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
50
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
25
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
FCL.-50CM .8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
10
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
First Brown
Golden Frame
Art Work
20 45 15 10 100 11 309 10 100 10 15 45 10
Gypsum Frame
360
Applique
Key Plan
190
20 10
LOCATION: DAMMAM - KSA
1/25 B-B CLIENT: Daifallah Al-Harbi
Drawing Title:
SHEET NO.:
67
Date : 01 / 04 / 2021
Paper Size : A3
01 Hotrizontal Section
1/25
10
10 60 560 60 10
Space High
H=465.0CM
25
FCL.-25CM
50
25
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
FCL.-50CM ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
Gypum Cornice Detail 10 .4
.5
DO NOT SCALE FROM THIS DRAWING.
CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.8
CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
12 mm Green Gypsum Board
95
Jotun : Candle Wax 1774
First Brown
Golden Frame
10 45 15 60 200 40 15 45 10
220
Key Plan
65
Drawn By: AK Checked By: HM
Sectional Elevation
20
C DHV - PRIVATE VILLA
PROJECT NAME:
1/25 C-C RI-20-111
PROJECT No.:
LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
Drawing Title:
Paper Size : A3
10 cm Dumping Sand
10
General Notes
LED Hidden Light First Brown
25
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
FCL.-25CM ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
50
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
25
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
FCL.-50CM BUILDING PRIOR TO COMMENCEMENT OF WORK.
10
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
Walnut Mexican
Gypsum Frame
Applique
360
10 60 10 80 10 325 10 105 10 15 45 20
Key Plan
20 10
CLIENT: Daifallah Al-Harbi
D Sectional Elevation
1/25 D-D
Drawing Title:
SHEET NO.:
69
Date : 01 / 04 / 2021
Paper Size : A3
01 Hotrizontal Section
10
12
1/25
10 60 100 25 275 25 135 60 10
DHV - Design Development
DHV - Design Development
DHV - Design Development
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
FCL.-50CM
200
200
90
SP
60
100
60 200 180
Key Plan
A A
40
40
40 120 40 40 85 55
1 1 4 4
Drawn By: MH Checked By: HM
B D B D
120
120
Men Wash Men Bath
200
200
25
200 180 LOCATION: DAMMAM - KSA
16
1+2+3 6 Daifallah Al-Harbi
CLIENT:
1 1 4 4 5
6 98
C C 3 3 Drawing Title:
25
25
2 5
GF-04-Men Bath - Plans
SHEET NO.:
70
Date : 01 / 04 / 2021
Paper Size : A3
05 Electrical Plan
1/50
01 Wall Name Plan
1/50
Space High Space High
H=465.0CM H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
50
50
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-50CM FCL.-50CM
180
Key Plan
85 110 5
Drawing Title:
SHEET NO.:
71
Date : 01 / 04 / 2021
Paper Size : A3
50
50
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-50CM FCL.-50CM
12 mm Green Gypsum Board
180
Key Plan
75 110 15
Drawing Title:
SHEET NO.:
72
Date : 01 / 04 / 2021
Paper Size : A3
50
50
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-50CM FCL.-50CM
12 mm Green Gypsum Board
25
12 mm Green Gypsum Board
180
Calacatta Gold
5 110 85
280
Key Plan
10 180 10
Pendant Light
Black Taurus
Mirror
10
Sink Drawn By: MH Checked By: HM
25
130
20
PROJECT No.:
LED Hidden Light LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
15
Drawing Title:
25
GF-04-Men Bath - Wash C&D
SHEET NO.:
73
Date : 01 / 04 / 2021
Paper Size : A3
55
Width
Width
W1
W1
48 80
20
100 50 50
20
20
06 Water Supply 07 Drainage
1/50 1/50
Key Plan
Drawing Title:
Paper Size :
: 1:50 REV. No. 1
A3
1/50
(80 cm) HIGH
GULLY TRAP
(30X30 cm)
(30 cm) HIGH
Space High Space High
H=465.0CM H=465.0CM
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
50
50
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-50CM FCL.-50CM
12 mm Green Gypsum Board 12 mm Green Gypsum Board
160
305
80
Key Plan
01 Pendant Light
Sec
10
160
25
Wall Mounted WC
DHV - PRIVATE VILLA
40cm High PROJECT NAME:
RI-20-111
20
PROJECT No.:
Toilet Role Holder LED Hidden Light LOCATION: DAMMAM - KSA
CLIENT: Daifallah Al-Harbi
15
Drawing Title:
25
GF-04-Men Bath - Bath C&D
SHEET NO.:
75
Date : 01 / 04 / 2021
Paper Size : A3
20 mm Cement Mortar
15
10 cm Dumping Sand
50 80 10 35 25
BASEMENT FLOOR
INTERIOR SHOP DRAWINGS
DHV - Design Development
DHV - Design Development
DHV - Design Development
DHV - Design Development
DHV - Design Development
DHV - Design Development
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
B Hall
BF 01 Area=98.8m2 D
1340
920
No. Revision/Issue Date
C
Drawn By: MS Checked By: HM
SHEET NO.:
76
Date : 01 / 04 / 2021
Paper Size : A3
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
400 NEEDED.
01-Afyon White
519
680
440
880
No. Revision/Issue Date
02 Floor Plan
1/50 Drawing Title:
SHEET NO.:
77
Date : 01 / 04 / 2021
Paper Size : A3
155 435
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
15
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
15
15
15
FCL.-25 CM
15 15
15 1280 15
620
15
860
10
15
15
15
Drawn By: MS Checked By: HM
03 Ceiling Plan
1/50 Drawing Title:
SHEET NO.:
78
Date : 01 / 04 / 2021
Paper Size : A3
15
15
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
SHEET NO.:
79
Date : 01 / 04 / 2021
Paper Size : A3
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
EXECUTION OF WORK.
.8 CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
BUILDING PRIOR TO COMMENCEMENT OF WORK.
90 90 8 130 .9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
60
60
233 207
75
120 1 200 1 1 1
200 120
60
160
160
6
2 1 2
200 200 450
260
220
2 2
180
1+2+3+4+5+6+7
220
7 9 9
200
200
350 220
180
2 2
60 60
259
224
6
35
120 1 200 1 5 2 2 5 4 4
60
80 280 80
160
160
No. Revision/Issue Date
3 3 4 4
90 200 200 90
60
80
1+2+3+4+5+6+7 6 153
145 Drawn By: MS Checked By: HM
6
25 6
BF-01-Sitting - Electrical Plan
SHEET NO.:
78 3 80
Date : 01 / 04 / 2021
Paper Size : A3
90
78 6
General Notes
.1 ALL DIMENSIONS SHOWN ARE BASED ON BLOCKWORK ONLY
ACTUAL DIMENSION ON SITE WILL REFER TO FINAL FINISH LEVEL OF
WALLS, FLOORS AND CEILINGS
.2 ALL DIMENSIONS & SIZES SHOWN ARE IN CENTIMETERS.
.3 ALL FINISHES REFER TO SCHEDULES OF FINISHES
.4 DO NOT SCALE FROM THIS DRAWING.
.5 CONTRACTOR TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS
BEFORE ANY CONSTRUCTION COMMENCES.
.6 CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE PRIOR TO
CONSTRUCTION.
.7 CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO
Space High .8
EXECUTION OF WORK.
CONTRACTOR SHALL CONFIRM THE FINISH FLOOR LEVEL OF
H=280.0CM BUILDING PRIOR TO COMMENCEMENT OF WORK.
.9 CONTRACTOR TO PREPARE ADDITIONAL SHOP DRAWINGS IF
NEEDED.
FCL.-10CM
25
25
FCL.-25CM
15
45
10
Jotun : Candle Wax 1774 Art Work
40
Gypsum Frame Details 03 TV
10
180
4 10 261 10 15 15 15 15 360
45
125 15 15 10 95 10 315 10 40
SIZE
Wall Paper
Wood 40
90
15
10
20
20 cm high Marble Skirting
30 mm Thikness Marble
Space High
H=280.0CM No. Revision/Issue Date
FCL.-10CM
25
25
FCL.-25CM
15
20
LED Strip Light
15
Applique 12 mm Green Gypsum Board Drawn By: MS Checked By: HM
80
PROJECT No.: RI-20-111
15 15
Gypsum Frame Details 03 LOCATION: DAMMAM - KSA
20 370 20
CLIENT: Daifallah Al-Harbi
180
Wall Paper
15
15 15 80 15 20 15 15 10 20 10 120 10 20 10 440
20
Drawing Title:
10 255 10 5 10 10 105 10 15 15 15 15 15 15 20
171
70
Wood
SHEET NO.:
15
81
10
Date : 01 / 04 / 2021
20
20
Scale : 1:50 REV. No. 1
Paper Size : A3
30 mm Thikness Marble
Space High
H=280.0CM
FCL.-10CM
25
FCL.-25CM
15
LED Strip Light
185
15 15 10 171 10 15 15 125
10 210 10 15 15 10 254 10 50
Afyon Marble
15
10
20
20 cm high Marble Skirting
30 mm Thikness Marble
20 mm Cement Mortar
10 cm Dumping Sand
B Sectional Elevation
1/50 B-B
Space High
H=280.0CM
FCL.-10CM
Drawn By: MS Checked By: HM
25
25
FCL.-25CM
15
101
Jotun : Candle Wax 1774 CLIENT: Daifallah Al-Harbi
Art Work
15
Wall Paper
BF-01-Sitting - Elevation B&D
10
15 15 15 15 15 15 60 15 15 20 20
98
Wood Scale : 1:50 REV. No. 1
15
Paper Size : A3
10
20
16
30 mm Thikness Marble