Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 10
3.0 References 3 of 10
10.0 Attachment 10 of 10
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
1.0 OBJECTIVE
• To outline the sequence of work for Earthworks (Road or Highway
Construction) and step by step construction methodology until
completion of the earthworks.
• To outline preparation or coordination required before start work
• To outline quality plan or inspection test required during project
implementation
• To perform safe working environment and compliance to the safety
requirements.
3.0 REFERENCES
• BS 8000: 1989 Part 1 – BS for Workmanship on Building Sites
Part 1: Code of Practice for excavation and filling
• BS 1377: 1990 Part 1 – BS Method for Soil for Civil Engineering Purposes
Part 1: General Requirements and Sample Preparation
• BS 1377: 1990 Part 4 – BS Method for Soil for Civil Engineering Purposes
Part 4: Compaction Related Test
➢ Mackintosh Probe Test
➢ Atterberg’s Limits – Liquid Limits and Plastic Limits
➢ California Bearing Test (CBR)
➢ Field Density Test (FDT)
• BS 1377: 1990 Part 9 – BS Method for Soil for Civil Engineering Purposes
Part 9: In-situ Tests
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 3
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
Method of
Material Items to be Checked or Inspected
Inspection
➢ Backfilling earth shall be cleaned
free from unwanted material such as
clay material, swamps, marshes,
rubbish, logs, peat, bogs, stumps or
other toxic material.
➢ Additional laboratory test (optional),
to confirm the material is suitable for
backfilling Atterberg’s Limits or Visual &
Earth suitable Proctor Test to be conducted to Test
for backfilling check the soil properties Random
Specification requirements:- Sampling
a) Liquid Limit ≥ 80%
b) Plastic Limit ≥ 55%
Refer BS 1377: Part 4 1990
➢ If the material used for the common
roadwork or highway, all the earth
stockpile shall be tested to check the
material for use CBR test ≥5%
Refer BS 1377: Part 4 1990
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 5
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 8
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
Stage of
No Frequency Checking Required Method Acceptance
Work
Work within boundary
Setting Out,
Every or ROW, Correct Within survey
1 Boundary or Survey Check
Location alignment or level tolerance
ROW check
control
Submission When
of Traffic Required Planning and
Diversion Traffic preparation required Approved by
Letter
2 for Authority Diversion for the traffic diversion Relevant
Submission
approval (Submission (Submission time frame shall Authority
(Highway follow Authority follow Authority Requirement)
Projects) Requirements)
Design
Preparation, Using temporary sheet
Review Calculation
Protection & When piles required C&S
3 Design Approved by
Temporary Required consultant approval or
Calculation Design
Work design calculations
Consultant
Conduct Testing:- Material not
Every a) Visual Check under USM
Site / Soil Random
Location b) Mackintosh Probe category such
4 Investigation Sampling and
suspected c) Proctor Test (LI/PI) swamp or clay.
(Site Condition) Test Consultant or
to be USM Item B & C required to verify
the visual inspection results Client instruction
Top soil removal
Removing Visual / Consultant or
minimum 150mm thk,
Unsuitable Review Client Approval
5 All area USM removal follow
Material / Mackintosh to proceed
Mackintosh Probe
Topsoil results Probe Results Backfilling
Excavation or
Cutting to the
Working Every
Excavation or Cutting Survey pegs/ required level or
in Cutting Cutting
6 to required level as Construction depth as per
Section or Section or
per surveyor pegs Drawing specified in
Slope Slope
Construction
Drawing
Filling or Backfilling Filling to the
according to required
Working Every Survey pegs/ required level
level as per surveyor
7 in Filling Filling Construction as per
pegs, Filling layer by
Section Section layer, minimum filling Drawing Construction
thickness 300mm layer Drawing
FDT Results
Conduct Field Density
achieved the
Compaction Test (FDT) to check
8 Random FDT Test specified
Test Degree of Compaction
as per specification degree of
compaction
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 9
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(HW)
Work Method Statement for Earthworks (Road or Highway Construction)
Your_Project_ Title
10.0 ATTACHMENT
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 10
Document Reference : Your_Company Document Date : Date_Order
Remarks / Comments:
STATUS:
Approved Approved with Comments Rejected as per comments
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 9
3.0 References 3 of 9
10.0 Attachment 9 of 9
2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
1.0 OBJECTIVE
• To outline the sequence of work for Earthworks (General Building
Construction) and step by step construction methodology until
completion of the earthworks.
• To outline preparation or coordination required before start work
• To outline quality plan or inspection test required during project
implementation
• To perform safe working environment and compliance to the safety
requirements.
3.0 REFERENCES
• BS 8000: 1989 Part 1 – BS for Workmanship on Building Sites
Part 1: Code of Practice for excavation and filling
• BS 1377: 1990 Part 1 – BS Method for Soil for Civil Engineering Purposes
Part 1: General Requirements and Sample Preparation
• BS 1377: 1990 Part 4 – BS Method for Soil for Civil Engineering Purposes
Part 4: Compaction Related Test
➢ Mackintosh Probe Test
➢ Atterberg’s Limits – Liquid Limits and Plastic Limit
➢ Field Density Test (FDT)
• BS 1377: 1990 Part 9 – BS Method for Soil for Civil Engineering Purposes
Part 9: In-situ Tests
3
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
Method of
Material Items to be Checked or Inspected
Inspection
Backfilling earth shall be cleaned free from Visual &
Earth suitable unwanted material such as clay material, Test
for backfilling swamps, marshes, rubbish, logs, peat, Random
bogs, stumps or other toxic material. Sampling
4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
• Before start excavation works, check that the following items have
been securely protected:-
➢ Protect the drains from damage and keep clear from debris at
all times to prevent drain clog which it may caused flooded.
➢ Check and report any benchmarks or any established survey
point found at the excavation areas. Do not remove or
damaged unless instructed otherwise.
➢ Underground services or overhead cables to be detected and
protected prior to start any excavation works. Recommended
to install sufficient warning sign to keep the machine operator
aware about all the services near to the work area.
➢ Any private property near to the excavation works shall be
protected to avoid any damaged or accident. Sheet piles shall
be used in the condition when the excavation work too risky
such as excavation too near/ next to private property or
excessive depth or height of slope cutting/ excavation work.
5
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
Stage of
No Frequency Checking Required Method Acceptance
Work
Work within boundary
Setting Out,
Every or ROW, Correct Within survey
1 Boundary or Survey Check
Location alignment or level tolerance
ROW check
control
Design
Preparation, Using temporary sheet
Review Calculation
Protection & When piles required C&S
2 Design Approved by
Temporary Required consultant approval or
Calculation Design
Work design calculations
Consultant
Conduct Testing:- Material not
Every a) Visual Check under USM
Site / Soil Random
Location b) Mackintosh Probe category such
3 Investigation Sampling and
suspected c) Proctor Test (LI/PI) swamp or clay.
(Site Condition) Test Consultant or
to be USM Item B & C required to verify
the visual inspection results Client instruction
Top soil removal
Removing Visual / Consultant or
minimum 150mm thk,
Unsuitable Review Client Approval
4 All area USM removal follow
Material / Mackintosh Probe
Mackintosh to proceed
Topsoil results Probe Results Backfilling
Excavation or
Cutting to the
Working Every
Excavation or Cutting Survey pegs/ required level or
in Cutting Cutting
5 to required level as Construction depth as per
Section or Section or
per surveyor pegs Drawing specified in
Slope Slope
Construction
Drawing
Filling or Backfilling Filling to the
according to required
Working Every Survey pegs/ required level
level as per surveyor
6 in Filling Filling Construction as per
pegs, Filling layer by
Section Section layer, minimum filling Drawing Construction
thickness 300mm layer Drawing
FDT Results
Conduct Field Density
achieved the
Compaction Test (FDT) to check
7 Random FDT Test specified
Test Degree of Compaction
as per specification
degree of
compaction
8
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/EAW(GB)
Work Method Statement for Earthworks (General Building Construction)
Your_Project_ Title
10.0 ATTACHMENT
9
Document Reference : Your_Company/WMS/PLG(IM) Document Date : Date_Order
Remarks / Comments:
STATUS:
Approved Approved with Comments Rejected as per comments
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 8
3.0 References 3 of 8
10.0 Attachment 8 of 8
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
1.0 OBJECTIVE
• To outline the sequence of work or construction methodology for
Piling Works (Injection Method). Methodology starts from survey setting
out until excess pile cutting until as-built drawing submission for
Consultant review.
• To outline preparation or coordination required before start work
• To outline quality plan or inspection test required during project
implementation.
• To perform safe working environment and compliance to the safety
requirements.
3.0 REFERENCES
NIL
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 3
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
Method of
Material Items to be Checked or Inspected
Inspection
RC Pile (Square Pile/ Spun Pile) shall be:-
➢ Correct Specification/ Grade
➢ Correct Size and Pipe Diameter
RC Pile (Square/ Visual
➢ Material delivered in good condition,
Spun) and Check &
no damaged.
others Random
➢ All accessories shall be available
accessories Sampling
and ready for use.
➢ Pile material: Date of casting shall
over than 28 days
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 5
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
Stage of
No Frequency Checking Required Method Acceptance
Work
Check material to be
Review Material as per
used (Grade/ Size):-
Material Catalogue or Project
1 Once • RC Piles either
Selection relevant test Specification/
square piles or
certificate Requirements
spun piles
Sample Material Product Sample
Approved by
2 Submission Once Brochure submission Submission
Client
(If applicable) approved by Client Form / Letter
Material ordered as Order Form / As per specified
Material
3 Every Order per Project Spec. / Purchase in Spec/Client
Order
Client Approval Order Approval
Material delivered as Material as per
Random
Material Every per material order, No spec, good
4 Sampling
Delivery Delivery Damaged conditions and
Check
(Quantity, Quality & Spec) no damaged.
Survey Mark and Check:-
During Visual Check Pegs per
Setting Out • Building Boundary
5 (Boundary/ Survey & Random construction
• Pile Position
pile position Setting Out Measurement drawing
pegs) • Pile (Cut-Off –Level)
Check initial piles
Pile driving as
• Correct Size
Before Pile per construction
Jacked In • Correct Grade Visual Check drawing and
Process • Correct Positions visually straight
• Straight Alignment alignment
Pile Jacked (Pile/Helmet/Hammer)
6 In (Injection Visually straight
Method) Check the all in alignment and
During Pile straight alignment and Visual Check pile joint was
Jacked In joint satisfactorily done satisfactory
and Pile done
Jointing Proper records
Ensure all pile records Visual Check
with authorized
in “Pile Records Form” & Recorded
signature
Check the following:- Pile cutting as
Upon • All the piles shall per “Cut-Off-Level”
completion be cut follow the Visual & and suitable
7 Pile Cutting
of piling marked “Cut-Off- Measured pile cutter
works Level” machine, No
• Suitable machine pile damaged.
As-Built: Surveys pick up info
All piles within
Data & Info: Upon and data for As-Built Field Survey
construction
plotting and completion drawing preparation and plotting
8 tolerances/
Consultant of pile and submission.
Acceptable by
submission cutting As-built review by C&S Review As-
Consultant
Design Consultant Built Drawing
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(IM)
Work Method Statement for Piling Works (Injection Method)
Your_Project_ Title
NIL
8.3 QC Documents or Relevant Checklist
10.0 ATTACHMENT
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 8
Document Reference : Your_Company Document Date : Date_Order
Remarks / Comments:
STATUS:
Approved Approved with Comments Rejected as per comments
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 10
3.0 References 3 of 10
10.0 Attachment 10 of 10
2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
1.0 OBJECTIVE
• To outline the sequence of work for Super Structure (RC Works) or
concreting of RC structure above ground and step by step
construction methodology until completion the RC structure works.
• To outline preparation or coordination required before start work
• To outline quality plan or inspection test required during project
implementation
• To perform safe working environment and compliance to the safety
requirements.
3.0 REFERENCES
• BS 8000: 1990 Part 2 – BS for Workmanship on Building Sites
Part 2: Code of Practice for Concrete Work
Part 2.2: Site work with In-situ and Pre-cast Concrete
3
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
Method of
Material Items to be Checked or Inspected
Inspection
➢ Ready Mixed Concrete (Grade)
Ready Mixed supplied to according to construction Slump Test
Concrete drawing/ structural design & Visual
➢ Slump Test meet the requirements
➢ All steel bar or BRC wire mesh shall
Steel Material be inspected during material
Visual &
such as delivery. Material shall in good
Test &
Reinforcement condition and no sign peeling of rust.
Review Mill
Bar / BRC wire ➢ Mill certificate shall be available for
Certificate
mesh review or checking during steel bar
material delivery
4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
For further details please refer to Work Method Statement for Piling
Works (Hydraulic Hammer Method/ Pile Injection Method)
For further details please refer to Work Method Statement for Anti
Termite Treatment
7.2 Preparation Prior Start Concreting Work (Bar Bending & Carpentry Works)
• Bar bending Works (Rebar or BRC Cutting and Bending): Material
such as steel bar or BRC shall be cut according to “Cutting Rebar/
BRC Schedule”.
• Length of rebar/BRC cutting and bending profile shall according to
construction drawing.
5
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
7.4 Installation M&E Services & Opening (Not Applicable for Exposed M&E Services)
• All the M&E services such as electrical conduits, plumbing and
sanitary services shall be installed according to approved Shop
Drawing/ Construction Drawing.
• Polystyrene installed to provide opening for M&E services crossing or
punching to the structure. Details reinforcement bar shall follow
construction drawings details.
• All the conduits or pipes shall be properly seal off to prevent concrete
flow into the pipe and cause conduits route chocked or blocked.
•
QUICK CHECK: M&E services, please check the following:-
➢ All pipes properly seal off to prevent choking or
clogging.
7.5 Fix and Install Formwork
• Formwork shall be constructed to suit structural dimension, size and
shape and shall according to Construction Shop Drawing.
• Internal formwork surface shall be cleaned and applied with approved
Oil Mould prior erection or installation of the formwork and rebar.
• Damaged formworks are not allowed to be used to avoid
unacceptable concrete surface defects such as honeycomb, loss of
grout, sticky formwork etc. Rejected timber formwork should be
segregated and removed to the designated place.
• Common reason of formwork damages:-
➢ Poor Storage, Handling and Striking: Method of storage, handling,
striking – improper method will cause formworks damaged, shorter life span
➢ System Formwork: Conventional Timber/ Aluminium System Formwork
➢ Formwork Cycle – How many times this Formwork has been used?
➢ Formwork Modification to Suit Construction – Drilling holes,
opening, cutting and others modification to suit the construction works.
➢ Low Quality of Formwork Material – Material Durability
• All gaps shall be seal off using suitable method such as sponge or
aluminium sheet to close all the gaps.
6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
8
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
Stage of
No Frequency Checking Required Method Acceptance
Work
Marking RC structure Survey check
Survey
Every position or level against Within survey
1 Setting Out/
Location according to construction tolerance
Marking
construction drawing drawing
Design Mix Once Design mix reviewed, Approved
Plant Trial Mixed Review & ** Final Approval
2 and Plant
conducted. Check slump Check subject to Trial
Trail Mixes Mixes
and cube results
Preparation Cutting, bending as Cutting and
Every
Before RC per rebar schedule. bending
Cutting,
Works Check random the Random according to
3 (Bar Cutting, Bending and
rebar schedule Check rebar schedule
Bending and Carpentry and construction
Carpentry according to
Formwork drawing
Formwork ) Construction Drawing
Formwork fixed
according to structure Correct shape,
Fixing and
Every shape, dimension and dimension, size.
4 Installing Visual Check
Casting size. No gap allowed No gap
Formwork
to prevent (Formwork)
unnecessary defects
Rebar installed
Check rebar lapping according to
Fixing
length, anchorage, construction
Rebar & Every Visual Check
5 stirrup or links installed drawing
Others Casting and Measure
according to (sufficient lapping,
Accessories construction drawing anchorage, link
spacing etc)
Concrete Check the slump Within specified
Every Random
6 Delivery requirements. Conduct Slump
Casting Check
Check test cube sampling. Requirements
Casting area
Check cleanliness, clean and rebar
rebar, spacer block fixed properly.
Placement Every tied up accordingly. Concrete
7 Visual Check
of Concrete Casting Method of pouring discharge
concrete. Vibration <1.5m and
thoroughly to the area. properly
vibrated.
Curing compound
Application Application to
Every Slab / applied to concrete
8 of Curing Visual Check all area/ evenly
Slab Surface surface to minimize
Compound shrinkage cracks distributed
Cube Witness and
Cube tested as per:- 7 & 28days
Strength Review
Every Batch a) Strength for 7 Days results meet the
9 Testing for Compressive
of Sampling b) Strength for 28 clients
(7days and 28
Days Strength
days) requirements
result
9
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/SUP(RC)
Work Method Statement for Super Structure (RC Works)
Your_Project_ Title
10.0 ATTACHMENT
10
Document Reference : Your_Company Document Date : Date_Order
Remarks / Comments:
STATUS:
Approved Approved with Comments Rejected as per comments
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(HM)
Work Method Statement for Piling Works (Hydraulic Hammer Method)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 8
3.0 References 3 of 8
10.0 Attachment 8 of 8
2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(HM)
Work Method Statement for Piling Works (Hydraulic Hammer Method)
Your_Project_ Title
1.0 OBJECTIVE
• To outline the sequence of work or construction methodology for
Piling Works (Hydraulic Hammer Method). Methodology starts from
survey setting out until excess pile cutting until as-built drawing
submission for Consultant review.
• To outline preparation or coordination required before start work
• To outline quality plan or inspection test required during project
implementation.
• To perform safe working environment and compliance to the safety
requirements.
3.0 REFERENCES
NIL
3
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(HM)
Work Method Statement for Piling Works (Hydraulic Hammer Method)
Your_Project_ Title
Method of
Material Items to be Checked or Inspected
Inspection
RC Pile (Square Pile/ Spun Pile) shall be:-
➢ Correct Specification/ Grade
➢ Correct Size and Pipe Diameter
RC Pile (Square/ Visual
➢ Material delivered in good condition,
Spun) and Check &
no damaged.
others Random
➢ All accessories shall be available
accessories Sampling
and ready for use.
➢ Pile material: Date of casting shall
over than 28 days
4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(HM)
Work Method Statement for Piling Works (Hydraulic Hammer Method)
Your_Project_ Title
6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(HM)
Work Method Statement for Piling Works (Hydraulic Hammer Method)
Your_Project_ Title
Stage of
No Frequency Checking Required Method Acceptance
Work
Check material to be
Review Material as per
used (Grade/ Size):-
Material Catalogue or Project
1 Once • RC Piles either
Selection relevant test Specification/
square piles or
certificate Requirements
spun piles
Sample Material Product Sample
Approved by
2 Submission Once Brochure submission Submission
Client
(If applicable) approved by Client Form / Letter
Material ordered as Order Form / As per specified
Material
3 Every Order per Project Spec. / Purchase in Spec/Client
Order
Client Approval Order Approval
Material delivered as Material as per
Random
Material Every per material order, No spec, good
4 Sampling
Delivery Delivery Damaged conditions and
Check
(Quantity, Quality & Spec) no damaged.
Survey Mark and Check:-
During Visual Check Pegs per
Setting Out • Building Boundary
5 (Boundary/ Survey & Random construction
• Pile Position
pile position Setting Out Measurement drawing
pegs) • Pile (Cut-Off –Level)
Check initial piles
• Correct Size Pile driving as
Before Pile • Correct Grade per construction
Driving • Correct Positions Visual Check drawing and
(X and Y Control) visually straight
Pile Driving • Straight Alignment alignment
(Hydraulic (Pile/Helmet/Hammer)
6 Hammer Check the blow Visually straight
Method) direction, shaft centres alignment and
During Pile
of hammer and pile Visual Check welding was
Driving after
are straight alignment. satisfactory
few blow
Welding workmanship. done
and Pile
Proper records
Jointing Ensure all pile records Visual Check
with authorized
in “Pile Records Form” & Recorded
signature
Check the following:- Pile cutting as
Upon • All the piles shall per “Cut-Off-Level”
completion be cut follow the Visual & and suitable
7 Pile Cutting
of piling marked “Cut-Off- Measured pile cutter
works Level” machine, No
• Suitable machine pile damaged.
As-Built: Surveys pick up info
All piles within
Data & Info: Upon and data for As-Built Field Survey
construction
plotting and completion drawing preparation and plotting
8 tolerances/
Consultant of pile and submission.
Acceptable by
submission cutting As-built review by C&S Review As-
Consultant
Design Consultant Built Drawing
7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/PLG(HM)
Work Method Statement for Piling Works (Hydraulic Hammer Method)
Your_Project_ Title
NIL
8.3 QC Documents or Relevant Checklist
10.0 ATTACHMENT
8
Document Reference : Your_Company/WMS/RFT(TB) Document Date : Date_Order
Remarks / Comments:
STATUS:
Approved Approved with Comments Rejected as per comments
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 9
3.0 References 3 of 9
10.0 Attachment 9 of 9
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
1.0 OBJECTIVE
3.0 REFERENCES
• MS 360:1991 Part 1 – Specification for Treatment of Timber with Copper/
Chrome/ Arsenic Wood Preservatives
• MS 544:2001 Part 1 – Code of Practice for Structural Use of Timber
Method of
Material Items to be Checked or Inspected
Inspection
➢ Truss material in good condition, not
damaged, acceptable quality of
Timber Roof
timber, material shall be free from Visual
Trusses
distortion, sagging, knot, sap wood
or excessive borer holes.
Sisallation Foil / ➢ Material received in good packaging
Visual
Insulation Foil and not damaged.
For further details please refer Work Method Statement for Brickworks
(Standard Brickwork)
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
7.2 Preparation for Timber Truss Installation (Complete Party Wall & Plaster,
Protruding Rebar and Installation of the Wall Plate)
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 5
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
• Brick Laying for Erection Party Wall/ Fire Wall: Brickwork lay according
to construction drawing. Brick wall shall be completed and properly
filled in order to allow installation of the wall plate.
• Sufficient time to allow laid brickwork set or fully cured before apply
any loading to the brickwork party wall/ fire wall.
For further details please follow the Work Method Statement
for Brickworks (Standard Brickwork)
• Plastering (Building Party Wall/ Fire Wall) – After complete the brickwork
for party wall/ fire wall, the wall surface should be plastered according
to project specification/ project requirement.
For further details please follow the Work Method Statement
for Plastering Work (without Skim Coat Finishes)
• Install or fix Wall Plates to the Roof Beam: installation process consist
of the following:-
➢ Check roof beam surface condition, clean and level - all
unwanted material such as cement slurry, overcast concrete
and concrete spillage shall be hacked and removed to ensure
the roof beam in level condition.
➢ Wall plates are affixed to structural beams by drilling holes in
the wall plates timber to fix onto the protruding rebar provided.
➢ After placing the wall plate to the position, protruding rebar
shall be bent to provide wall plate anchorage to the main RC
structure. Protruding rebar bending shall be carried out to the
correct direction against roofing structure uplift.
•
QUICK CHECK: Please check the following are ready prior to roof truss
installation (where applicable):-
➢ Party wall/ fire wall completed and ready, RC stiffener
provided according to specification.
➢ Wall plate installed and bent accordingly
➢ No gap between wall plate and roof beam infill if
required
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
• After complete the installation of the main trusses for the whole roof
area and complete the installation of permanent bracing to hold the
roof structure in rigid and stable position. The roof is now ready for
installation of sisallation foil/ insulation foil.
• Installation of the sisallation/ insulation foil - Installation method
shall follow manufacture recommendations.
• Sufficient lapping provided with minimum of 150mm lapping length.
• Lapping shall be done in correct manner where the top pitch
sisallation foil/ insulation foil shall be installed on top of the bottom
pitch of sisallation foil/ insulation foil.
• Sisallation foil/ insulation foil shall be installed row by row and timber
batten nailed to hold the sisallation foil/ insulation foil accordingly.
• Sagging or damaged sisallation foil/ insulation foil shall be adjusted
and rectified to proceed the installation of the timber batten.
•
QUICK CHECK: Please check the following during installation of sisallation
foil/ insulation foil:-
➢ Lapping at joint with minimum of 150mm lap
➢ Lapping shall be done in correct manner where the top
pitch foil laid on top.
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
Stage of
No Frequency Checking Required Method Acceptance
Work
Design Check design Approved and
Calculation calculation and shop Review & Accepted by
1 Once
and Shop drawing and submit to Check Consulting
Drawing Consulting Engineer Engineer
Party/ firewall
Preparation Complete party wall or ready and RC
to start roof firewall with plaster Visual Check stiffener
2 Once
trusses finish, installed RC & Measure installed
installation stiffener (if applicable) according to
specification
Check roof truss Within
Roof Truss
acceptable free from acceptable
Material Every Visual Check
3 knot, sapwood, tolerance:
Delivery Delivery (Random)
twisted, borer holes material timber
Inspection
etc (Visual Random) defects
Wall plate installed No gaps
between wall
accordingly, fixed to
Install Wall plate and the
Every Unit / protrude rebar tie to
4 Plate to the Visual Check roof beam.
Roof Beam
Area the roof beam. Protrude rebar
Protrude rebar bend bent out against
accordingly structure uplift
Timber quality
Material inspected one
within tolerance
by one to check the
Hoisting and or project
supplied timber
Marking the specification,
Every Unit/ material acceptable Visual Check
5 Main Truss/ marking and
Area quality. Marking the & Measure
Rafter spacing
main truss/ rafter
Positions according to
installed in the
Approved Shop
position, spacing
Drawing
Install and Installation method Installation
Every Unit / Visual Check
6 Fix Main according to according to
Area construction drawing or
& Measure
Trusses/ Construction
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 8
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/RFT(TB)
Work Method Statement for Roof Truss (Prefabricated Timber Roof Trusses)
Your_Project_ Title
10.0 ATTACHMENT
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 9
Document Reference : Your_Company/WMS/STW (FE) Document Date : Date_Order
Remarks / Comments:
STATUS:
Approved Approved with Comments Rejected as per comments
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
Table of Contents
Section Titles / Subtitles Page
1.0 Objective 3 of 11
3.0 References 3 of 11
10.0 Attachment 11 of 11
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 2
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
1.0 OBJECTIVE
• To outline the sequence of work for Steel Structure Works
(Steel Structure Fabrication and On-Site Erection) and step by step
construction methodology until completion the erection works
• To outline preparation or coordination required before start work
• To outline quality plan or inspection test required during project
implementation
• To perform safe working environment and compliance to the safety
requirements.
3.0 REFERENCES
• BS EN 288: 1992 Part 2 – Specification and Approval of Welding
Procedures for Metallic Materials
Part 2: Welding Procedure Specification for arch welding
Part 3: Welding Procedure Tests for the arch welding of sheets.
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 3
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
Method of
Material Items to be Checked or Inspected
Inspection
Mild Steel/ ➢ Material shall be delivered with copy
Stainless Steel of mill certificates. Material shall be
Review Mill
such as plates, complied to specified material
Certificates
rolled sections, specification, grade, size, thickness.
➢ Material shall be in good condition: no
& Visual
pipes, etc Check
(subject to project excessive corrosion or material not
specifications) pitted
➢ Material delivered and used shall be
accordance to project specification Review Mill
Welding Welding Procedure Spec. (WPS) Certificates
Electrodes ➢ Handling welding consumables shall & Visual
be complied to Electrode Manufacture Check
or Welding Procedure Spec (WPS)
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 4
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
• Welding Tie Bar for Block Works Installation (if applicable) – subject to
project requirements or Client Instructions, tie bar recommended 6mm
to 8mm welded to the steel column to allow bonding tie the block wall.
For further details please refer to Work Method Statement for Block
Works / Light Block
For further details please refer to Work Method Statement for Piling
Works (Hydraulic Hammer Method/ Pile Injection Method)
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 5
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
7.1.2 Marking and Cutting Inspection – After the raw material inspected and
released to “Material Marking and Cutting Section”.
• During the marking process, the marker will drawn up the plate cut-piece
dimension including the position of bolts and nuts according to fabrication
shop drawing.
• Marker to write the “Piece of Mark Reference No” to control quantity or
numbers of cutting pieces available for use.
• In order to minimize wastage, “Master Marking Plan” shall be prepared
prior start marking and cutting work. Master Marking Plan” will be based
on similar cut-pieces and counted for total quantity.
Examples -Plate 200mm x 800mm marked as PLT1A, from the shop
drawing required total of 80 nos of similar plates, plate marking write as
PLT1A / 01, PLT1A/ 02, PLT1A/03….. PLT1A/80
• Bolt and Nuts position and quantity according to fabrication drawing.
• A
QUICK CHECK: Before cutting drilling the bolt holes, check the following:-
➢ Check against drawing the bolt holes position, quantity
and size or diameter of bolt holes
7.1.3 Fitting Up/ Fit –Up Inspection – Fitting Up process shall be planned according
to steel structure erection master plan. Material fabrication should arranged
and follow the following erection sequence from bottom to top.
Examples:
Roof Steel
Column Beam
Beam Girder
• Prior welding process, two pieces of steel elements fit by Tack Welding/
Spot Welding to hold the elements during the welding in process.
• Distortion control to avoid material distorted after welding process;
preventive action required during welding such as:-
➢ Placing the weld about the natural axis
➢ Reducing amount of welding depositing
➢ Balance welding technique
• In designs where the above action is not possible, distortion may be
prevented by one of the following method:-
➢ Pre-setting of parts
➢ Pre-bending of parts
➢ Use of restraint such as shim plates, chain block, etc.
Please refer to Attachment B – Fit Up Inspection
7.1.4 Welding Preparation/ Surface Preparation/ Joint Preparation –
• Welding joint shall be prepared according to fabrication shop drawing,
basic welding joint preparation as per following:-
➢ Angle of Bevel (Single V angle 50◦, Double V angle 30◦) – the
angle at which the edge of component prepared for welding.
➢ Roof Face – the portion of a fusion face at the root that is not
bevelled or grooved
➢ Gap – the minimum distance at any cross section between
edges, ends or surfaces to be joined
• Surface of parent material shall be free from contaminations such as
rusts, oils, grease or paints. Contaminations shall be removed to allow
welding process.
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 6
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
• QUICK
QUICK CHECK: Welding Process Quality Control, check the following:-
➢ Check welding electrode method of handling
➢ Check the electrode backing or preheating requirement
➢ Welding Current/ Voltage check during welding
process, too high may cause undercut or other defects
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 7
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
7.1.6 Final Dimension Check – After complete visual inspection and fabricated
structure released for next checking process Final Dimension Check. The
following items need to be check:-
➢ All the plates or piece of mark fit and weld to the correct
position and fitted according to fabrication drawings.
➢ Bolts hole drilled to correct positions with sufficient quantity
according to fabrication shop drawing.
➢ All the welding defects or imperfection repaired accordingly.
• QUICK
QUICK CHECK: Before fabricated structure released for painting works,
CHECK
check the following items:-
➢ All the hot work or welding work completed and ready
for painting works
➢ Dimension check done and ready for painting works
7.2.1 Painting Works – not mention in this WMS, please refer Painting for Steel
Structure
7.2.2 Galvanizing Works – not mention in this WMS, please refer Hot Dip Galvanize for
Steel Structure
7.2.3 The steel structure finishes subject to project requirement or specification.
Steel structure finishes can be combination of both finishes (subject to project
requirements).
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 8
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
➢ After complete fix and install the roof beam, girder and purlins
will be installed accordingly.
➢ During erection surveyor will check the column alignment
accordingly, column erected shall be within the construction
erection tolerances.
X2-3 X1-3
X2-2 X1-2
Transfer Beam
Steel Column or Roof Beam Cross Bracing
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 9
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 10
Doc. Date: Doc. Reference:
Your_Company_Name Date Order Your_Com/WMS/STW(FE)
Work Method Statement for Steel Structure Works (Fabrication and On-site Erection)
Your_Project_ Title
10.0 ATTACHMENT
During Fabrication
• Attachment A: Inspection Checklist for Material Incoming Inspection
• Attachment B: Inspection Checklist for Fit Up Inspection
• Attachment C: Inspection Checklist for Visual Inspection
• Attachment D: Inspection Checklist for Final Dimension Inspection
On-Site Erection
• Attachment E: Inspection Checklist for Inspection
w
ww
w ww
www...kkkooonnntttrrraaakkktttooorrrQ
Quuuaaallilitittyyytttoooooollslss...cccooom
Q m...m
m myyy
m 11
Work Method Statement
Petujuk Praktikum
1. Gunakan formulir standart yang tertera
2. Dasar acuan aturan pergunakan Standart Nasional Indonesia (SNI)