You are on page 1of 2

Blasthole Drilling Job Card

KINROSS CHIRANO GOLD MINES LTD

BLASTHOLE DRILLING JOB CARD

MACHINE ID:…………… DATE:……………………….

DRILLER'S NAME:………………………………….. START TIME:…………….

DRILLER'S ID:……………………………. CLOSE TIME:……………..

START: CREW:……………….
MACHINE ENGINE HOURS
FINISH: DRILL AREA:………………

START: SHIFT: D / N
MACHINE HAMMER HOURS
FINISH:

CHECK LIST
Engine Oil Compressor Oil

Hammer Oil Engine Water Level

Hydraulic Oil Drilling Water Level

Fuel Rod Grease

Fire Extinguisher Drifter Bolts

COMMENTS:

OPEARTOR'S SIGNATURE:……………… SUPERVISOR'S SIGNATURE:……………

NOTE:SAFETY IS EVERYONE'S RESPONSIBILITY


ALL CARDS MUST BE RETURNED TO THE PRODUCTION OFFICE VIA THE SHIFT SUPERVISOR

\\Chi-fs-02\shares_2\Minex\Engineering\Personals\TA\Drill Blast Reports- Revised Front Page Version 1.2


Blasthole Drill Job Card BLASTHOLE DRILLING REPORT

Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth
Hole Type Bench: Shot #: Pit: Pattern: Bit Size:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Production Holes

Batter
Redrill
Flushing
Toes
Ore Monitors
In-Fill
Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth
Hole Type Bench: Shot #: Pit: Pattern: Bit Size:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Production Holes

Batter
Redrill
Flushing
Toes
Ore Monitors
In-Fill
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Other Hole Types
Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth Depth
Presplit:
Boulders
Depressurisation
\\Chi-fs-02\shares_2\Minex\Engineering\Personals\TA\Drill Blast Reports- Revised Back Page Version 1.2

You might also like