Professional Documents
Culture Documents
Document
Requirements
Classification: Public Uncontrolled if printed Rev: 1.0
4.9.1.2 The aspiration of the modular substation is having the protection and control
systems installed and tested as far as practically possible whilst in the offsite
location.
4.9.1.3 The protection and control systems are to be labelled clearly, consistently and
in line with the Owner’s preference.
4.9.2 Instrumentation
4.9.1.1 Electrical instrumentation for monitoring purposes is fitted during the primary
electrical equipment manufacturing phase and is integral to the equipment.
Equipment manufacturers normally detail their standard monitoring
instrumentation which comes included; there will be an opportunity at the
desk-top design phase to order additional instrumentation if necessary.
4.9.1.3 The primary electrical equipment may also come with additional monitoring
functions such as temperature or status.
4.9.2.1 The information from the electrical instrumentation will feed into protection
panels and if a deviation from the norm is detected the system should
automatically take the necessary action to maintain the safety of the
equipment.
4.9.2.2 Protection systems require details of when and how to react. Minimal
requirements for the UK are specified in the use of system codes. More
specific information may come from the equipment manufacture or the
Network Owner of the system that the substation will be connected to.
4.9.2.3 Driving efficiency’s with regards simplifying the modular substation and
standardising the protection architecture are seen as being key objectives.
Replication would also enable in-situ replacement.
Page 18 of 50