Address: Auditors :
1-0
2-0
3-0
4-0
A) List of equipment
B) Defined method for calibration
C) Calibration schedule
D) Records of calibration
Control of MMD 4-18 E) Traceability of calibration
F) Calibration status
G) MSA plan & implementation records
H) Lab scope for internal calibration
(I) Uses the calibration / testing / Inspection from
the NABL approved Lab for external calibration.
5-0
SUPPLIER
SUPPLIER SELF AUDIT ON SITE AUDIT
SURVEY ITEMS ITEMS TO BE CHECKED SELF AUDIT ON SITE AUDIT OBSERVATION COUNTERMEASURE TARGET DATE RESPONSIBILITY STATUS
OBSERVATION SCORE (0-3)
SCORE (0-3)
6-0
Has supplier a defined system for following
A) Training of 5S and Safety to all
emplyoees
B) Proper identfication of required items
C) Signboard and location identification.
5S and Safety 6-1
D) Signboard and location
identification.
E) Internal 5S and Safety audit with checksheet
F) Recognition and reward policy for 5S
champions
DE OF CONDUCT
SUPPLIER
SUPPLIER SELF AUDIT ON SITE AUDIT
SURVEY ITEMS ITEMS TO BE CHECKED SELF AUDIT ON SITE AUDIT OBSERVATION COUNTERMEASURE TARGET DATE RESPONSIBILITY STATUS
OBSERVATION SCORE (0-3)
SCORE (0-3)
requirements ?
A) Initial production control period
Initial flow control 7-1
B) Stricker inspection during initial supply.
C) IFC announcement, Trend monitoring, Exit if
target achieved.
D) Analysis issue reported during IFC period.
8-0
9-0
Signature of Auditors
Remarks of Approval Authority