Professional Documents
Culture Documents
cutting cutting Soft Soil Hard Soil Soft Rock Medium Rock
S.N No.(Cut Cutting Avearage Length Cutting
Chainage Width(m Height Unit
. Shape) Area(m²) Area(m²) (m) Volume(m³) Quantity Quantity Quantity Quantity
) (m) % % % %
(m³) (m³) (m³) (m³) Remarks
1 0+000 1 6.00 2.00 12.00
2 0+050 1 6.00 2.00 12.00 12.00 50 600.00 (m³) 30% 180.00 70% 420.00 0% 0.00 0% 0
3 0+100 1 6.00 2.00 12.00 12.00 50 600.00 (m³) 45% 270.00 55% 330.00 0% 0.00 0% 0
4 0+150 1 3.00 2.00 6.00 9.00 50 450.00 (m³) 40% 180.00 60% 270.00 0% 0.00 0% 0
5 0+200 1 3.00 1.80 5.40 5.70 50 285.00 (m³) 40% 114.00 60% 171.00 0% 0.00 0% 0
6 0+250 1 3.50 1.80 6.30 5.85 50 292.50 (m³) 40% 117.00 60% 175.50 0% 0.00 0% 0
7 0+300 1 4.00 1.50 6.00 6.15 50 307.50 (m³) 40% 123.00 60% 184.50 0% 0.00 0% 0
8 0+350 1 3.50 1.80 6.30 6.15 50 307.50 (m³) 20% 61.50 80% 246.00 0% 0.00 0% 0
9 0+400 1 3.50 1.50 5.25 5.78 50 289.00 (m³) 10% 28.90 85% 245.65 5% 14.45 0% 0
10 0+450 1 4.00 1.50 6.00 5.63 50 281.50 (m³) 20% 56.30 80% 225.20 0% 0.00 0% 0
11 0+500 1 3.50 1.60 5.60 5.80 50 290.00 (m³) 10% 29.00 90% 261.00 0% 0.00 0% 0
Total 500 3703.00 1159.70 2528.85 14.45 0% 0.
l;=g= ljj/)f ;+Vof n= rf}= p= kl/df)f PsfO b/ -?=_ d"No -?=_ s}lkmot
1 #REF! #REF! 1159.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! 2528.85 #REF! 87,973.92 #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! 14.45 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
dd{t ;+ef/ sf]if tyf slG^h]G;L u/L 5 k|lt;t
hDdf #REF! #REF! #REF! al(
Vyas Municipality
Office of Municipal Executive
Provience no 4, Damauli, Tanahun
Summary of Rates (for contractor with 15% Overhead)
F/Y: 2076/077
Lead of 9km
MKS
S.N.
Description
Unit Rate
Building construction rate
1 Activity: Excavation for foundation in Soft Clay and Silly Soil M3 504.70
including 10m lead and 1.5m lift
2 Activity: Excavation for foundation in Stiff Clay and BMS M3 576.80
Soil including 10m lead and 1.5m lift
3 Activity: Stone Filling in Foundation and levelling lead of 30 M3 2801.52
m distance.
4 Activity: Flat brick soling works all complete ( by width face M2 1395.62
vertical/ upward ) .
5 Activity: Filling with ordinary soil in layers of 15cms including M3 722.50
watering and compaction by labour lead of 10m.
6 Activity: Brick (Chimny ) masonary works in 1:4 c/s mortar M3 12595.39
including transportation upto 30m all complete works.
7 Activity: Brick (chinese face ) masonary works in 1:4 c/s M3 13241.56
mortar including transportation upto 30m all complete
works.
Activity: Brick (solid cement ) masonary works in 1:4 c/s
8 M3 10482.74
mortar including transportation upto 30m
9 Activity: Brick (Chimny ) masonary works in 1:6 c/s mortar M3 12179.98
including transportation upto 30m
10 Activity: Brick (Chimny Bhatta) masonary works in Mud M3 9632.40
mortar including transportation upto 30m
11 Activity: Wooden formwork for RCC slab and floors M2 616.88
14 Activity: 38mm thick Salwood shutter for doors and windows M2 13010.59
38 Activity: 20mm thick Cement Sand Plaster in 1:6 c/s mortar M2 388.72
54 Activity: 3*20 mm size MS.Grill Fitting & Fixing Work with Kg 104.68
Aluminium paint all complete works.
55 Activity: 4.5*20 mm size MS.Grill Fitting & Fixing Work with Kg 104.68
Aluminium paint all complete works.
56 Activity: Iron rolling shuttter including Fitting & Fixing Work Kg 110.18
with painting works.
57 Activity: Collapsible gate including Fitting & Fixing Work. Kg 110.18
58 Activity: Iron compound gate including Fitting & Fixing Work Kg 110.18
with 1 coat primer paint.
59 Activity: Cement concrete hollow block(4"x8"x16") M2 1141.50
masonary works in 1:4 c/s mortar including transportation
upto 30 m.
Activity: Dry stone paving work in steps.
60 M3 6041.04
30 Activity: Providing and applying Tack Coat with hot Bitumen M2 88.53
31 M2 205.99
Activity: Providing and laying open-graded Premix Carpet o
32 Activity: Providing and laying Seal Coat sealing the voids in M2 64.72
580.41
663.32
3221.75
1604.97
830.88
14484.70
15227.80
12055.15
14006.98
11077.26
709.41
122.84
270364.82
14962.18
10437.06
122.25
203.59
113.97
297.09
266.12
52.12
18.12
158.91
238624.36
808.55
985.17
888.81
1033.35
738.84
896.73
828.83
771.26
10953.55
380.31
412.51
355.91
484.88
447.03
305.21
284.70
704.32
863.06
1167.86
2160.10
4290.02
3997.66
4247.29
1706.60
853.30
8855.00
3220.00
62.10
184.14
120.38
120.38
126.71
126.71
126.71
1312.73
6947.20
43.91
6403.98
3817.52
86.94
180.78
14264.61
18017.16
12479.47
17968.67
190.11
19653.92
19331.01
1124.43
0.00
651.48
54.87
70.55
197.54
493.86
44.90
1743.27
4138.32
10309.69
9783.81
5355.02
5326.25
10285.06
11918.85
13720.97
14512.56
10261.53
15197.27
8243.32
264384.60
271859.60
10946.74
2720.39
153.34
166.90
90.05
1935.91
2968.31
187.77
101.81
236.89
74.43
79.89