IN-WATER SURVEY DATA SHEET
FOR
NCWI
(PRD-XXXX)
This cover page is a total record of all the revisions of this document identified by number and title. Each of the pages that follow this
cover page in this document records only the latest revision for that page.
1
CONTENT TABLE OF IWS NCWI DATASHEET
I.
NCWI – ROW-1 GV AND CP INSPECTION CPC-NCWI-L-E-0010-
I.1.
DATASHEET 101
NCWI – ROW-2 GV AND CP INSPECTION CPC-NCWI-L-E-0010-
I.2.
DATASHEET 102
NCWI – ROWA- GV AND CP INSPECTION CPC-NCWI-L-E-0010-
I.3.
DATASHEET 103
NCWI – ROW B GV AND CP INSPECTION CPC-NCWI-L-E-0010-
I.4.
DATASHEET 104
I.5. NCWI – ELE (-)14M – GENERAL VISUAL CPC-NCWI-L-E-0010-
INSPECTION DATASHEET 105
I.6. NCWI – ELE (-)35M - GENERAL VISUAL CPC-NCWI-L-E-0010-
INSPECTION DATASHEET 106
I.7. NCWI – ELE (-)56.8M - GENERAL VISUAL CPC-NCWI-L-E-0010-
INSPECTION DATASHEET 107
II.
2
IV.4. NCWI P5 TIE IN SPOOL PIPELINE - GENERAL CPC-NCWI-L-E-0010-
VISUAL INSPECTION DATASHEET 404
IV.5. NCWI P4 TIE IN SPOOL PIPELINE - GENERAL CPC-NCWI-L-E-0010-
VISUAL INSPECTION DATASHEET 405
NCWI P11 TIE IN SPOOL PIPELINE - GENERAL
IV.6.
VISUAL INSPECTION DATASHEETNCWI P11 TIE CPC-NCWI-L-E-0010-
IN SPOOL PIPELINE - GENERAL VISUAL 406
INSPECTION DATASHEET
V.
VI.1. CPC-NCWI-L-E-0010-
NCWI SEABED VISUAL INSPECTION DATASHEET
601
VII.
3
I. GENERAL VISUAL & CATHODIC PROTECTION
INSPECTION FOR STRUCTURE
4
NCWI – ROW-1 GV AND CP INSPECTION Data Sheet No.: CPC-NCWI-
DATASHEET L-E-0010-101
Date Rev Description By Check App
CP-01
CP-04
CP-03
CP-02 CP Criteria ref -800mV to -1100mV
(ref Ag/AgCl)
CP-05
CP No. Reading
CP Calib.
CP-01
CP-02
CP-07
CP-03
CP-06
CP-08 CP-04
CP-05
CP-09
CP-06
CP-07
CP-08
CP-09
CP-10
CP-11
CP-12 CP-11 CP-12
CP-10
5
NCWI – ROW-2 GV AND CP INSPECTION Data Sheet No.: CPC-NCWI-
DATASHEET L-E-0010-102
Date Rev Description By Check App
A B
CP-19
CP-21
CP-20
CP-22
CP No. Reading
CP Calib.
CP-13
CP-14
CP-15
CP-16
CP-17
CP-18
7
NCWI – ROW B GV AND CP INSPECTION Data Sheet No.: CPC-NCWI-
DATASHEET L-E-0010-104
Date Rev Description By Check App
CP-31
CP-32
CP No. Reading
CP-34 CP Calib.
CP-31
CP-32
CP-35
CP-33
CP-34
CP-35
CP-36
CP-36
8
NCWI – ELE (-)14M – GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-105
Date Rev Description By Check App
A B
1
2
Project: Date of Insp:
For site survey record
Check: Coating Condition, Damage, Anode Condition and Security, Debris, Cathodic Protection
Comment:
9
10
NCWI – ELE (-)35M - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-106
Date Rev Description By Check App
A B
1
2
Project: Date of Insp:
For site survey record
Check: Coating Condition, Damage, Anode Condition and Security, Debris, Cathodic Protection
Comment:
1
2
NCWI – ELE (-)56.8M - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-107
Date Rev Description By Check App
A B
1
3
NCWI – BOATLANDING - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-108
Date Rev Description By Check App
4
5
II. GENERAL VISUAL INSPECTION FOR RISER
Drawing Ref: CPC-NCWI-L-D-1307 rev2, Riser Location & Section at NCWI Jacket
B A 1
P7
6
Anomaly Y/N: Anomaly Report No.:
Diver/Pilot: Inspector 3.4U:
CA: JVPC Rep.:
7
NCWI P17 RISER - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-202
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-L-D-1410 rev 6, Riser General Arrangement Drawing for P17
CPC-NCWI-S-D-1240 rev2, Riser Clamp General Arrangement for P17
Drawing Ref: CPC-NCWI-L-D-1404 rev3, 12" (P15) Riser Details at NCWI Platform
B A 1
P15
9
NCWI P05 RISER - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-204
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-S-D-1253 rev2, Jacket Risers - 10 Water Injection Riser Row B
2 1 A B
P5
ELEVATION
2
10
NCWI P4 RISER - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-205
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-S-D-1252 Rev3, Jacket Risers - 6 Gas Lift Row B
A B
2 1
P4
1
ELEVATION
2
11
NCWI P11 RISER - GENERAL VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-206
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-S-D-1251 Rev2, Jacket Risers - 6 Gas Lift Row A
A B
2 1 A
P11 1
ELEVATION
2
12
III. GENERAL VISUAL INSPECTION FOR CAISSON
13
NCWI SEAWATER CAISSON - GENERAL Data Sheet No.: CPC-NCWI-
VISUAL INSPECTION DATASHEET L-E-0010-301
Date Rev Description By Check App
SEAWATER CAISSON
14
NCWI SEAWATER DUTY CAISSON - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-302
Date Rev Description By Check App
15
NCWI SEAWATER STANDBY CAISSON - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-303
Date Rev Description By Check App
16
IV. GENERAL VISUAL INSPECTION FOR NCWI TIE-IN
SPOOL
17
NCWI P7 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-401
Date Rev Description By Check App
TIE IN SPOOL OF 16“ P07 WATER INJECTION PIPELINE FROM NCWI TO WHP-C1
BR
ID
G
E
NB
R2
18
M
AT
CH
LI
NE
NCWI P15 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-402
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-L-D-1403 re 3, 12" (P15) Pipeline Approach Layout at NCWI Platform
CPC-NCWI-L-D-1408 rev3, 12" (P15) Tie-in spool Layout at NCWI platform
M
AT
CH
LI
NE
19
NCWI P17 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-403
Date Rev Description By Check App
20
NCWI P5 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-404
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-L-D-1010 Rev1, Pipeline Tie in 10 Water Injection Riser Tie in Spool General
Arrangement & Details (P5)
TIE IN SPOOL OF 10“ P05 WATER INJECTION PIPELINE FROM NCWI TO WHP-E1
BR
DI
GE
NB
R2
21
22
NCWI P4 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-405
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-L-D-1011 rev 1, 6" Gas Lift Riser Tie- In Spool General Arrangement & Details
(P4)
BR
I
DG
E
NB
R2
23
NCWI P11 TIE IN SPOOL PIPELINE - Data Sheet No.: CPC-NCWI-
GENERAL VISUAL INSPECTION DATASHEET L-E-0010-406
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-L-D-1401 rev5, 6" (P11) Pipeline Approach Layout at NCWI Platform
CPC-NCWI-L-D-1402 rev7, 6" (P11) Tie-In Spool Layout at NCWI Platform
NE
LI
CH
AT
M
BR
ID
G
E
NB
R2
NE
LI
CH
AT
M
26
NCWI – ROW-1 MARINE GROWTH VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-501
Date Rev Description By Check App
MG-02
MG-01 MG-03
MG-04
MG-06
MG-05
MG-07 MG-08
MG-09
MG-12
MG-10
MG-11
MG-17
MG-16 MG-18
27
mm mm mm mm mm mm
Hard% Soft % Hard% Soft % Hard% Soft %
MG-13 MG-14 MG-15
mm mm mm mm mm mm
Hard% Soft % Hard% Soft % Hard% Soft %
MG-16 MG-17 MG-18
mm mm mm mm mm mm
Comment:
28
VERTICAL FRAMING ELEVATION ROW 2
A B
MG-20
MG-19 MG-21
MG-23
MG-22
MG-24
MG-26
MG-25
MG-27
MG-29
MG-28 MG-30
MG-32
MG-31 MG-33
MG-34 MG-35
MG-36
Comment:
29
Anomaly Y/N: Anomaly Report No.:
Diver/Pilot: Inspector 3.4U:
CA: JVPC Rep.:
30
NCWI – ROWA- MARINE GROWTH VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-503
Date Rev Description By Check App
M
G-
37
M
G
-
3
8
M
G-
39
M
G
-
4
0
M
G-
41
M
G
-
4
2
Project: Date of Insp:
For site survey record
Check: Extent species, thickness and percentage of soft & hard marine growth
Comment:
31
32
NCWI – ROW B MARINE GROWTH VISUAL Data Sheet No.: CPC-NCWI-
INSPECTION DATASHEET L-E-0010-504
Date Rev Description By Check App
MG-43
MG-44
MG-45
MG-46
MG-47
MG-48
Comment:
33
VI. SEABED VISUAL INSPECTION
34
NCWI SEABED VISUAL INSPECTION Data Sheet No.: CPC-NCWI-
DATASHEET L-E-0010-601
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-S-D-1108 Rev1, Jacket Primary Framing - Horizontal Framing - EL(-) 55.800M
CPC-NCWI-S-D-1300 Rev1, Jacket Mudmat - General Arrangement
35
VII. SCOUR INSPECTION
Drawing Ref: CPC-NCWI-S-D-1108 Rev1, Jacket Primary Framing - Horizontal Framing - EL(-) 55.800M
CPC-NCWI-S-D-1300 Rev1, Jacket Mudmat - General Arrangement
36
HORIZONTAL FRAMING PLAN AT ELEVATION (-) 56.300M
Comment:
37
Anomaly Y/N: Anomaly Report No.:
Diver/Pilot: Inspector 3.4U:
CA: JVPC Rep.:
38
VIII. MUDMAD INSPECTION
39
Data Sheet No.: CPC-NCWI-
NCWI MUDMAD INSPECTION DATASHEET L-E-0010-801
Date Rev Description By Check App
Drawing Ref: CPC-NCWI-S-D-1108 Rev1, Jacket Primary Framing - Horizontal Framing - EL(-) 55.800M
CPC-NCWI-S-D-1300 Rev1, Jacket Mudmat - General Arrangement
40
IX. NDT (FMD AND CVI) MAPPING DATASHEET
41
NCWI NDT (FMD&CVI) MAPPING Data Sheet No.: CPC-NCWI-
DATASHEET L-E-0010-901
Date Rev Description By Check App
Drawing Ref:
M4-2023 JF12-2023
ROW 1 ROW 2
JF12-2023 B A A B
CP-01 CP-19
JF8-2008
JF5-2008
JF14-2018
CP-03 CP-21
CP-02
CP-04 CP-20
JF7-2018
CP-07 CP-25
CP-06
CP-08 CP-24
42
ROW A JF11-2023 ROW B
JF04-2023 JF06-2023
JF03-2023
1 2 2 1
JF11-2023
JF09-2023
JF02-2023
CP-13 CP-31
JF15-2008
CP-32
CP-14
M2-2023
CP-34
CP-16
CP-35
CP-17
CP-36
CP-18
All member M will be subjects to be inspected by FMD; JFs and JSs will be closely inspected
(CVI) and if any abnormal found, NDT (ACFM/MPI) will be performed
43