You are on page 1of 3

1.

PM Organizational Structure REVISION

Maintenance Plant DONE

Planning Plant DONE

Work Center DONE

Planner Groups DONE

21
20
9/
/
12
2. Technical Objects (Master Data)
Functional Location DONE

Equipment DONE

Serial number (Material Master) DONE

BOM DONE

21
20
Class and Characteristics

2/
DONE

/1
1
,1
10
Codes and Catalogs DONE

Permits DONE

Measuring Point and Measuring counter DONE 12/13/2021

Revision DONE

Preventive Maintenanace Transaction Data

Maintenance strategies DONE


12/14/2021
Task DONE

Maintenance planning DONE


12/15/2021
Maintence item DONE

Scheduling DONE
12/16/2021
Monitering DONE
PM Organizational Structure
Planning Plant
Work Center
Planner Groups
Technical Objects (Master Data)
1 Functional Location
2 Equipment
3 Serial number (Material Master)
4 BOM
5 Class and Characteristics
6 Codes and Catalogs
7 Permits
8 Measuring Point and Measuring counter
9 Revision
Transaction Data ( Bussiness process)
1 CREATE NOTIFICATION
2 GENERAL OR CORRECTIVE MAINTENANCE
3 BREAKDOWN OR MALFUNCTION MIANTENANCE
4 STOCK MATERIAL
5 NON STOCK METERIAL
6 EXTERNAL SERVICES
7 PREVENTIVE MAINTENCE PLAN
8 SINGLE CYCLE ( TIME , PERFORMEMCE, CONDITINED )
9 STRATEGY MAINTENANCE PLAN ( TIME , PERFORMEMCE, CONDITINED )
10 MULTI COUNTER ( TIME , PERFORMEMCE, CONDITINED )
11 CALIBRATION PREVENTIVE MAINTENANCE PLAN
12 CALIBRATION MAINTENANCE ORDER
13 REFURBISHMENT MAINTENACE ORDER

You might also like