Professional Documents
Culture Documents
5 6 1 Factors affecting facility location, Types of plant layout REMEMBER/CONCEPTUAL 2021-09-20 APPROVED
6 7 1 Types of plant layout, Assembly line balancingComputer aided layout design techniques REMEMBER/CONCEPTUAL 2021-09-21 APPROVED
7 8 1 Material handling principles, Types of material handling systems REMEMBER/CONCEPTUAL 2021-09-22 APPROVED
8 9 1 Method of process planning, Steps in process selectionProduction equipment and tooling selection REMEMBER/CONCEPTUAL 2021-09-23 APPROVED
10 11 2 Forecasting techniques - causal and time series models REMEMBER/PROCEDURAL 2021-09-27 APPROVED
26 27 3 Time cost trade off, Financial statementsResource levelling REMEMBER/CONCEPTUAL 2021-10-28 APPROVED
31 32 3 Perpetual and periodic inventory control systems, VED analysisABC analysis REMEMBER/CONCEPTUAL 2021-11-09 APPROVED
39 40 4 Work sampling, PMTSStandard data, Work measurement - time study, 1 REMEMBER/CONCEPTUAL 2021-11-18 APPROVED
40 41 4 Incentives scheme, Wage administrationErgonomics, Job evaluation, Merit rating REMEMBER/CONCEPTUAL 2021-11-29 APPROVED
42 43 4 Product life cycle, Tolerance designQuality and cost considerations, Principles of product design REMEMBER/CONCEPTUAL 2021-12-01 APPROVED