You are on page 1of 6

Attachment 9 Settlement Observation Record

Subgrade Settlement Observation Record Table (Settlement Observation Pile)

Contractor of Measuring Point


Project : Kereta Cepat Jakarta Bandung Wika Section 3 / Subgrade #29 082708L1
Measurement : Number :
(m) (mm) (mm)
Observation Observation Observation Accumalated (mm/d)
Current Current Accumulated Contruction Stage
Period Date Interval Days Settlement Rate
Elevation Settlement Settlement
1 2021-03-29 0 1 245.13469 0.00 0.00 Preloading Graded Cruse Stone
2 2021-03-30 1 2 245.13418 0.51 0.51 Preloading Graded Cruse Stone
3 2021-03-31 1 3 245.13364 0.54 1.05 Preloading Graded Cruse Stone
4 2021-04-01 1 4 246.06910 0.00 1.05 Preloading Graded Cruse Stone
5 2021-04-03 2 6 246.06785 1.25 2.30 Preloading Graded Cruse Stone
6 2021-04-04 1 7 245.13990 0.00 2.30 Preloading Graded Cruse Stone
7 2021-04-05 1 8 246.06937 0.00 2.30 Preloading Graded Cruse Stone
8 2021-04-09 4 12 245.13387 0.00 2.30 Preloading Graded Cruse Stone
9 2021-04-12 3 15 245.13167 2.20 4.50 Preloading Graded Cruse Stone
10 2021-04-15 3 18 245.13192 -0.25 4.25 Preloading Graded Cruse Stone
11 2021-04-18 3 21 246.07015 0.00 4.25 Preloading Graded Cruse Stone
12 2021-04-21 3 24 246.06942 0.73 4.98 Preloading Graded Cruse Stone
13 2021-04-24 3 27 246.60274 0.00 4.98 Preloading Graded Cruse Stone
14 2021-04-27 3 30 246.60141 1.33 6.31 Preloading Graded Cruse Stone
15 2021-04-30 3 33 248.09969 0.00 6.31 Preloading Graded Cruse Stone
16 2021-05-03 3 36 248.10028 -0.59 5.72 Preloading Graded Cruse Stone
17 2021-05-06 3 39 248.10011 0.17 5.89 Preloading Graded Cruse Stone
18 2021-05-09 3 42 248.09973 0.38 6.27 Preloading Graded Cruse Stone
19 2021-05-12 3 45 248.09984 -0.11 6.16 Preloading Graded Cruse Stone
20 2021-05-15 3 48 248.09968 0.16 6.32 Preloading Graded Cruse Stone
21 2021-05-18 3 51 248.09963 0.05 6.37 Preloading Graded Cruse Stone
22 2021-05-20 2 53 248.09943 0.20 6.57 Preloading Graded Cruse Stone
23 2021-05-21 1 54 248.09999 -0.56 6.01 Preloading Graded Cruse Stone
24 2021-05-22 1 55 248.09962 0.37 6.38 Preloading Graded Cruse Stone
25 2021-05-24 2 57 248.09992 -0.30 6.08 Preloading Graded Cruse Stone
26 2021-05-25 1 58 248.09898 0.94 7.02 Preloading Graded Cruse Stone
27 2021-05-27 2 60 248.09891 0.07 7.09 Preloading Graded Cruse Stone
28 2021-05-28 1 61 248.09848 0.43 7.52 Preloading Graded Cruse Stone
29 2021-05-30 2 63 248.09778 0.70 8.22 Preloading Graded Cruse Stone
30 2021-06-02 3 66 249.09983 0.00 8.22 Preloading Graded Cruse Stone
31 2021-06-05 3 69 249.09996 -0.13 8.09 Preloading Graded Cruse Stone
32 2021-06-08 3 72 249.09932 0.64 8.73 Preloading Graded Cruse Stone
33 2021-06-09 1 73 249.09938 -0.06 8.67 Preloading Graded Cruse Stone
34 2021-06-10 1 74 249.09960 -0.22 8.45 Preloading Graded Cruse Stone
35 2021-06-11 1 75 249.09980 -0.20 8.25 Preloading Graded Cruse Stone
36 2021-06-14 3 78 250.09597 0.00 8.25 Preloading Graded Cruse Stone
37 2021-06-17 3 81 250.09525 0.72 8.97 Preloading Graded Cruse Stone
38 2021-06-20 3 84 250.09518 0.07 9.04 Preloading Graded Cruse Stone
39 2021-06-23 3 87 250.09459 0.59 9.63 Preloading Graded Cruse Stone
40 2021-06-26 3 90 250.09480 -0.21 9.42 Preloading Graded Cruse Stone
41 2021-07-02 6 96 250.09438 0.42 9.84 Preloading Soil
42 2021-07-09 7 103 250.09416 0.22 10.06 Preloading Soil
43 2021-07-16 7 110 250.09325 0.91 10.97 Preloading Soil
44 2021-07-23 7 117 251.09176 0.00 10.97 Preloading Soil
45 2021-07-30 7 124 252.08239 0.00 10.97 Preloading Soil
46 2021-08-06 7 131 252.08159 0.80 11.77 Preloading Soil
47 2021-08-13 7 138 252.08091 0.68 12.45 Preloading Soil
49 2021-08-20 7 145 252.07993 0.98 13.43 Preloading Soil
50 2021-08-27 7 152 252.08063 -0.70 12.73 Preloading Soil
51 2021-09-03 7 159 253.07804 0.00 12.73 Preloading Soil
52 2021-09-10 7 166 253.07765 0.39 13.12 Preloading Soil
53 2021-09-24 14 180 253.07716 0.49 13.61 Preloading Soil

PIC of Measurement : Review : Supervisor : Date :


September 29, 2021
Ahmad Subowo Deffa Follan Ariyanata Ridwan Fachrulrozi
Ahmad Subowo Deffa Follan Ariyanata Ridwan Fachrulrozi

16
(mm) Accumulated Sett lement
14

12

10
Settlement

0
0 7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154 161
Time (Days)
e)

082708L1

Remarks

Settlemet Plate Continue 1 Meter

Settlemet Plate Cutting 1 Meter


Settlemet Plate Continue 1 Meter
Settlemet Plate Cutting 1 Meter

Settlemet Plate Continue 1 Meter

Settlemet Plate Continue 0.5 Meter

Settlemet Plate Continue 1,5 Meter


Settlemet Plate Continue 1.0 Meter

Settlemet Plate Continue 1.0 Meter

Settlemet Plate Continue 1.0 Meter


Settlemet Plate Continue 1.0 Meter

Settlemet Plate Continue 1.0 Meter

September 29, 2021


133 140 147 154 161 168 175 182 189