You are on page 1of 4

South Lokichar Development - Surface Facilities - Part C, Section 3.

2 Document Listing
Ref Document Number Rev Doc Type Title

COMPANY STANDARDS
T-ESP-GUD-0003 1 Guideline GIS in ESIAs Guideline
T-ESP-GUD-0007 1 Guideline Wildlife and Livestock Protection Guidelines
T-ESP-GUD-0010 1 Guideline Water Management Guideline
T-ESP-GUD-0014 1 Guideline Environmental Performance on Development Projects Guideline
T-FAC-SPE-0003 0 Specification Type C Temporary Accommodation Minimum Standards
T-HSS-STD-0013 2 Standard Safety Standard
T-HSS-STD-0014 2 Standard Health Standard
T-ENG-STD-0001 0 Standard Engineering Management Standards
T-OPS-STD-0004 3 Standard Operations Standard
T-OPS-STD-0003 2 Standard Asset Integrity Standard
T-SNE-STD-0006 1 Standard Business Planning & Performance Management Standard
T-HSS-POL-0001 V3 Policy Safe and Sustainable Operations Policy
T-HSS-PRO-0009 2 Procedure Tullow Life-Saving Rules
T-HSS-GUD-0002 1 Guideline Incident Investigation Training Manual
T-HSS-PRO-0002 6 Procedure Incident Management & EHS Statistics Reporting Procedure
T-KE-HSS-PRO-0001 1 Procedure Drug and Substance Abuse Procedure
T-KE-SCM-PRO-0001 7 Procedure Lifting Management Procedure - Kenya Lifting Operations
T-HSS-STD-0003 5 Standard Security Standard
T-SNE-POL-0001 V1 Policy Risk Management Policy
T-HSS-POL-0001 V3 Policy Safe and Sustainable Operations Policy
T-GPA-POL-0001 V1 Policy Human Rights Policy
T-SNE-STD-0005 5 Standard Risk Management Standard
T-SEA-STD-0001 4 Standard Non-Technical Risk Standard
T-KE-HRS-GUD-0006 0 Guideline Implementation Guidelines for Contractors for labour (industrial relations)
T-KE-HSS-PLN-0011 6 Plan Malaria Management Plan
T-KE-LOG-PRO-0005 3 Procedure Land Transport Operating Procedure
T-AIM-PRO-0002 0 Procedure Controlled Document Management Procedure
T-AIM-PRO-0001 Procedure Controlled Document Numbering Procedure
T-AIM-SPE-0001 Specification Master Data Specification for Asset Information
South Lokichar Development - Surface Facilities - Part C, Section 3.2 Document Listing
Ref Document Number Rev Doc Type Title Column1 Comments

Basis of Design
T-KE-DEV-BOD-0004 5 Basis of Design Surface Facilities Basis of Design
Basis of Design Reference List (Non- FEED Deliverables)
Guideline Ref 1_IFC General EHS Guidelines
FAC 6106 - PVT Black Oil Study (EXPRO) Report Ref 2_ Fluid Reference 10BB_Ngamia-1A_6106
Report Ref 5_LC1305 REPORT Part 1 (WAX AND EMULSION BEHAVIOUR OF AMOSING, NGAMIA AND TWIGA CRUDE OILS)
Report Ref 5_LC1305 REPORT Part 2 Appendix (WAX AND EMULSION BEHAVIOUR OF AMOSING, NGAMIA AND TWIGA CRUDE OILS APPENDICES)
1548338 - Wartsila Report Ref 6_Tullow - VIEC Flow Loop Testing
1511352 - Wartsila Report Ref 7_VIEC Separation Study for South Lokichar Field
Report Ref 8_l1410 REPORT (EMULSION STABILITY OF TULLOW KENYAN CRUDE OILS)
Report Ref 9_LC1344 Report-2 Final (WAX DEPOSITION RATE DETERMINATIONS FOR AMOSING AND NGAMIA FLUIDS)
Report Ref 10_LC1411 Report (WAX DEPOSITION RATE DETERMINATIONS FOR BLENDED KENYAN FLUIDS)
T-KE-DEV-RPT-001 Report Ref 15_T-KE-DEV-RPT-0010 Kenya Production Chemistry Report Rev 2
ESIA
ESIA-Report_Foundation-Stage-of-South-Lokichar-Development (DRAFT)
Industrial Baseline Studies and Suppliers list
SGS: TKBV Industrial Baseline Survey Phase II (IBS Phase II March 2016)
Tullow Oil Kenya BV Industrial Baseline Survey Overview (External Stakeholders IBS April 2016)
Cardno Petroleum Business Opportunities: Business Improvement Plan Summaries
TKBV Direct Spend with Kenyan Registered Suppliers - 2015 to 2019
Wood Deliverables
41640-WOOD-XX-XX-DC-M-0002 P05 Report Integrated Waste Management Facilities (IWMF) Basis of Design Commercial Information removed
41640-WOOD-XX-XX-RP-WM-0003_S0 1.3 Report Landfill Basis of Design Commercial Information removed
522008-8150-RP-0001 1 Report IWM Facilities Preliminary Design Option Selection
Xodus Deliverables
L-100365-S00-TECH-001  R02 Technical Note Fluid Screening and Characterisation
L-100365-S00-TECH-002  A01 Technical Notes Wellbore Wax Deposition
Worley Deliverables
305008-51692-00-GE-REP-0104 1 Report Central Facility Site Selection Report
305301-08722–00-PM-PRO-0200 N/A Procedure Tullow Site Visit Procedures
305008-51692-00-ML-REP-0001 1 Report Materials Investigation Report Commercial Information removed
305008-51692 –00-CI-REP-0005 1 Report Access Roads Concept Report Commercial Information removed
Other Technical Information
T-KE-OPS-GUD-0001 2 South Lokichar Basin Development - Operations Functional Requirement
T-KE-DEV-PLN-0009 1 Plan Development Pad and Tragetory Overview
Report Upstream - Security threat assessment
8 NC Paper Strategic Water Supply Internal Paper 8, “Water supply from local groundwater” Uncontrolled Tullow Internal Document
9 NC Paper Strategic Water Supply Internal Paper 9, “Water supply from local groundwater” Uncontrolled Tullow Internal Document
South Lokichar Development - Surface Facilities - Part C, Section 3.2 Document Listing
Ref Document Number Rev Title

Survey Related Documents


305008-51692-00-GM-REP-0102  0 Final Topographic LiDAR Survey Report VOL 1
305008-51692-00-GM-REP-0102  0 Final Topographic LiDAR Survey Report VOL 2
305008-51692-00-GM-REP-0102  0 Final Topographic LiDAR Survey Report VOL 3
305008-51692-00-GP-REP-0101 0 Deterministic Seismic Hazard Assessment
305008-51692-00-GP-REP-0102 0 Geophysical Interpretive Report
407011-00566-SS-REP-0002 0 Geotechnical Factual Report
407011-00566-SS-REP-0003 0 Geotechnical Interpretative Report-Rev0
Background_seismicity_monitoring_8
Kenya_Intermediate_report_part_I (Data Acquisition & Processing)
Kenya_Intermediate_report_part_II (PSHA & Ground Motion Levels Assessment)
Kenya_South_Lokichar_Foundation_Project_GIS_Data_Catalogue
South Lokichar Development - Surface Facilities - Part C, Section 3.2 Document Listing
Document Number Rev Title

You might also like