PARTICULAR SPECIFICATION
SECTION D25 – QTEL and ELV DUCT NETWORK
SECTION D25
25.1.1 All works associated with the Telephone installation shall be carried out by
SUB-CONTRACTOR approved by QF REPRESENTATIVE and Q-Tel. The
specialist SUB-CONTRACTOR shall have minimum -5 years proven project
experience in design and installation of similar systems.
The scope of works shall include providing the design, cabling, duct,
termination, clean earthing and all civil works associated with the Telephone
network for the infrastructure in accordance with Q-Tel’s specification and QF
REPRESENTATIVE’S requirement.
All Main Junction and Pull Boxes shall be plastic, and surface mounted at the
designated locations and shall be complete with suitable back-box to
facilitate receiving concealed telephone wiring.
All the Main Junction Boxes shall be from any approved manufacturer and be
complete with all terminal connectors and in accordance to the requirements
of Q-Tel, QF REPRESENTATIVE’S requirement and relevant to the number
of pairs of modules to be housed.
GTC-05/197/ED ECS FOR MULTI-PURPOSE ADMINISTRATION COMPLEX-RAS LAFFAN
PARTICULAR SPECIFICATION
SECTION D25 – QTEL and ELV DUCT NETWORK
25.1.3 BLOCK CABLING
CONTRACTOR shall execute complete “Block Cabling and Wiring” for the
Telephone Installation of the infrastructure and terminate wiring both at the
Main Telephone Junction Box and at the building junction box.
The entire “Block cabling and Wiring” shall be executed using QF/Q.TEL
cable specifications for telephone cabling and wiring and shall be in
accordance with the approved Q.F/Q.TEL manufacturer, rules and
regulations.
Personnel trained and certified in the design of the Cabling System or any
other equivalent structured cabling manufacturer.
Be in business a minimum of five (5) years in the State of Qatar in the field of
Telephone and Data Cabling.
The organization should have carried out a single job involving a minimum of
3500 points and the project should have been carried out directly with the
end user in the State of Qatar.
Electrical SUB-CONTRACTOR is not allowed for pulling the cables &
terminations.
C. The method of installation of the whole of the ELV network shall be strictly
in accordance with the requirements laid down in the relevant sections of
the Q TEL Standard Specifications. CONTRACTOR is deemed to be in
possession of the latest versions of the Specifications.