Question 1
10%
Question 4
Volumen (w ave)(Lave)(Dave)
35+2*2=39 TOE of slopes
47+2*2 = 51
1.5
6
39*51*6=11934
39*6(6*1.5)=2106
51*6*(6*1.5)=2754
4*6(6*1.5) (6*1.5)/3=648
((32+46)/2*((58+72)/2)*7)/27
(39*65*7)/27= 657cyd
Question 5
3
CONST 285: Construction Estimating
Question 6 ((39+57)/2*((51+69)/2)*6)/27
(48*60*6)/27= 640cyd
Question 7 7*(32*58)+46*72)/(2*27)
4
CONST 285: Construction Estimating
7*(1856+3312)/54=670cyd
Question 8 6*(39*51)+57*69)/(2*27)
6*(1989+3933)/(54)=658 cyd
5
CONST 285: Construction Estimating
Question 9 32*58+46*72+((32*58)*(46*72)0.5)/3*27
=661cyd modified – average – end
method
6
CONST 285: Construction Estimating
Vtotal =
19.44+22.22+124.44+566.22=623.43
Question 13 Volume =L(A1 + A2)/2
Question 14
Question 15
Question 16
Volume footing =(45ft )(33ft )(6ft )(1/27)=330
-(5*21*6)/27=23.33
330-23.33=306.66yd3
Volume column = (2ft)(12ft)(2ft)(1yd3/27)=1.77
The volume of backfill
Volume 646 cyd yd3 -306.66 yd3 – 1.77 yd3 = 337.56 yd3
Question 17
Vd = 344yd3/(1-5/100)=362
=661-362=298.89
Vl=298.89x(1+31/100)=391.55
Question 18
Swell percentage 25 %
Shrinkage percentage 8%
Volume of fill 337.56
Excavated volume 279.086 cyds 646-366.91=279.086
Vd = 337.56 yd3/(1-8/100)=366.91
=646-366.91=279.086
Vl=279.086x(1+25/100)=348.857
9
CONST 285: Construction Estimating
Question 19
E- P-
grad grad Cut/F
e e ill
104, 104,
1-A 5 5 0,00
104, 104,
1-B 7 7 0,00
105, 105,
1-C 1 1 0,00
105, 105,
1-D 3 3 0,00
105, 105,
1-E 9 9 0,00
106, 106,
1-F 1 1 0,00
106, 106,
1-G 5 5 0,00
Total Vol. Grd line-1 0,00
104, 104,
2-A 2 2 0,00
104, 104,
2-B 6 7 0,10
104, 104,
2-C 8 7 -0,10
105, 104,
2-D 3 7 -0,60
105, 104,
2-E 5 7 -0,80
105, 104,
2-F 8 7 -1,10
2-G 106 106 0,00
-
Total Vol. Grd line-2 33,07
103, 103,
3-A 9 9 0,00
104, 104,
3-B 3 7 0,40
104, 104,
3-C 7 7 0,00
104, 104,
3-D 9 7 -0,20
105, 104,
3-E 2 7 -0,50
3-F 105, 104, -0,70
10
CONST 285: Construction Estimating
4 7
105, 105,
3-G 5 5 0,00
-
Total Vol. Grd line-3 13,23
103, 103,
4-A 4 4 0,00
104, 104,
4-B 0 7 0,70
104, 104,
4-C 5 7 0,20
104, 104,
4-D 8 7 -0,10
105, 104,
4-E 1 7 -0,40
105, 104,
4-F 1 7 -0,40
105, 105,
4-G 3 3 0,00
Total Vol. Grd line-4 0,00
103, 103,
5-A 1 1 0,00
103, 104,
5-B 3 7 1,40
104, 104,
5-C 1 7 0,60
104, 104,
5-D 3 7 0,40
104, 104,
5-E 6 7 0,10
104,
5-F 105 7 -0,30
5-G 105 105 0,00
Total Vol. Grd line-5 29,10
102, 102,
6-A 8 8 0,00
103, 104,
6-B 2 7 1,50
103, 104,
6-C 6 7 1,10
103, 104,
6-D 9 7 0,80
104, 104,
6-E 5 7 0,20
104, 104,
6-F 7 7 0,00
11
CONST 285: Construction Estimating
104, 104,
6-G 9 9 0,00
Total Vol. Grd line-6 47,62
102, 102,
7-A 7 7 0,00
102, 102,
7-B 9 9 0,00
103, 103,
7-C 1 1 0,00
103, 103,
7-D 5 5 0,00
103, 103,
7-E 9 9 0,00
104, 104,
7-F 4 4 0,00
104, 104,
7-G 7 7 0,00
Total Vol. Grd line-7 0,00
Total
Volume 30,42
Total
Volume -
Fill 30,42
Volume of 30,4
Fill 2 cyds
Swell
Percentag
e 28 %
Shrink
Percentag
e 5 %
Excavated
(Bank)
Volume 32 cyds
Transport
ed
(Loose) cyd
Volume 41 s