Heat

Production Consp. Sp Power Avg TPD R. Hrs


2077 676992 734 57.73 2434.86 6673
Savan
Bhadra
Ashwin
kartik
Mansir
Paush
2078
Magh
Falgun
Chaitra
baishakh
jaith
asadh

•Planned Stoppa
•Total Stoppage

•Production Loss
8760

lanned Stoppage = 360 hrs. 15

otal Stoppage Hours (over & above Planned Stoppage) = 1727 hr.
roduction Loss due to stoppage (Including Planned Stoppage) ≈ 1,76
) = 1727 hr.
oppage) ≈ 1,76,119* MT
Production Sp Power Avg TPH R. Hrs
2077 1083814 4933.90 5272
Savan
Bhadra
Ashwin
kartik
Mansir
Paush
2078
Magh
Falgun
Chaitra
baishakh
jaith
asadh

•Planned Stoppage =
•Total Stoppage Hours

•Production Loss due


8760

d Stoppage = 360 hrs. 15

Stoppage Hours (over & above Planned Stoppage) = 1727 hr.


ction Loss due to stoppage (Including Planned Stoppage) ≈ 1,76,119*
727 hr.
e) ≈ 1,76,119* MT
Production Sp Power Avg TPH R. Hrs
2077 92375 447.16 4958
Savan
Bhadra
Ashwin
kartik
Mansir
Paush
2078
Magh
Falgun
Chaitra
baishakh
jaith
asadh

•Planned Stoppage =
•Total Stoppage Hours

•Production Loss due


8760

d Stoppage = 360 hrs. 15

Stoppage Hours (over & above Planned Stoppage) = 1727 hr.


ction Loss due to stoppage (Including Planned Stoppage) ≈ 1,76,119*
727 hr.
e) ≈ 1,76,119* MT
Production Sp Power Avg TPH R. Hrs
2077 289831.00 46.20 2078.07 3347.31
Savan
Bhadra
Ashwin
kartik
Mansir
Paush
2078
Magh
Falgun
Chaitra
baishakh
jaith
asadh

•Planned Stoppage =
•Total Stoppage Hours

•Production Loss due


8760

d Stoppage = 360 hrs. 15

Stoppage Hours (over & above Planned Stoppage) = 1727 hr.


ction Loss due to stoppage (Including Planned Stoppage) ≈ 1,76,119*
727 hr.
e) ≈ 1,76,119* MT
Production Sp Power Avg TPH R. Hrs
2077 13342 55.94 1716.20 186.58
Savan
Bhadra
Ashwin
kartik
Mansir
Paush
2078
Magh
Falgun
Chaitra
baishakh
jaith
asadh

•Planned Stoppage =
•Total Stoppage Hours

•Production Loss due


303173.00 14136957

8760

d Stoppage = 360 hrs. 15

Stoppage Hours (over & above Planned Stoppage) = 1727 hr.


ction Loss due to stoppage (Including Planned Stoppage) ≈ 1,76,119*
727 hr.
e) ≈ 1,76,119* MT
Production Budget
2077
Savan
Bhadra
Ashwin
kartik
Mansir
Paush
2078
Magh
Falgun
Chaitra
baishakh
jaith
asadh
• Raw Mill Production = 10,83,814 MT
•Raw Mill production as per design capacity = 9,48,960 MT
•Raw Mill productivity ≈ 114%

•Raw Mill Running Hour = 5272 hrs.

•Year Average Raw Mill Production per day = 4934 TPD

•Coal Mill Production = 92,375 MT


•Coal Mill production as per design capacity = 99,160 MT

•Coal Mill productivity ≈ 93.2%

•Coal Mill Running Hour = 4958 hrs.

•Year Average Coal Mill Production per day = 447 TPD


•Cement Mill OPC Production = 2,89,831 MT
•Cement Mill PSC Production = 13,342 MT
•Cement Mill OPC production as per design = 3,34,731 MT
•Cement Mill PSC production as per design = 16,419 MT
•Cement Mill OPC productivity ≈ 86.6%
•Cement Mill PSC productivity ≈ 81.3%
•Cement Mill OPC Running Hour = 3347.31 hrs.
•Cement Mill PSC Running Hour = 186.58 hrs.
•Year Average OPC Production per day = 2098 TPD
•Year Average PSC Production per day = 1723 TPD
•Year Average Cement Grinding Unit Consumption = 46.63 kWh/ton cement
9,48,960 MT

4934 TPD

99,160 MT

447 TPD
63 kWh/ton cement
Mangsir2078
Date Nepali Date Stoppage Hrs

17/11/2021 01/08/2078 24.00


18/11/2021 02/08/2078 24.00
19/11/2021 03/08/2078 24.00
20/11/2021 04/08/2078 24.00
21/11/2021 05/08/2078 6.33
17.67
22/11/2021 06/08/2078 3.42
23/11/2021 07/08/2078 0
1.17
24/11/2021 08/08/2078
25/11/2021 09/08/2078 0
26/11/2021 10/08/2078 0.50
2.58
0.17
0.17
27/11/2021 11/08/2078 0
28/11/2021 12/08/2078 0
29/11/2021 13/08/2078 0
30/11/2021 14/08/2078 0
01/12/2021 15/08/2078 0
02/12/2021 16/08/2078 0
8.00
03/12/2021 17/08/2078
04/12/2021 18/08/2078 8.00
05/12/2021 19/08/2078 0.83
06/12/2021 20/08/2078 2.00
07/12/2021 21/08/2078 0
08/12/2021 22/08/2078 0.17
09/12/2021 23/08/2078 0
10/12/2021 24/08/2078 0
11/12/2021 25/08/2078 0
12/12/2021 26/08/2078 0
13/12/2021 27/08/2078 0
14/12/2021 28/08/2078 0
15/12/2021 29/08/2078 0
Paush2078
Date Nepali Date Stoppage Hrs
24.00
16/12/2021 01/09/2078
17/12/2021 02/09/2078 6.00
18/12/2021 03/09/2078 0
19/12/2021 04/09/2078 0
20/12/2021 05/09/2078 0
21/12/2021 06/09/2078 0.33
22/12/2021 07/09/2078 2.00
0.50
23/12/2021 08/09/2078 0
24/12/2021 09/09/2078 0
25/12/2021 10/09/2078 0
26/12/2021 11/09/2078 0
27/12/2021 12/09/2078 0.67
28/12/2021 13/09/2078 0
29/12/2021 14/09/2078 1.08
30/12/2021 15/09/2078 0
31/12/2021 16/09/2078 0.17
01/01/2022 17/09/2078 0.92
02/01/2022 18/09/2078 0.25
03/01/2022 19/09/2078 0
04/01/2022 20/09/2078 0
05/01/2022 21/09/2078 0.17
06/01/2022 22/09/2078
Mangsir2078
Reason Department

KILN STOPPED DUE TO RAW MEAL SILO LEVEL LOW EXT


KILN STOPPED DUE TO RAW MEAL SILO LEVEL LOW EXT
KILN STOPPED DUE TO RAW MEAL SILO LEVEL LOW EXT
KILN STOPPED DUE TO RAW MEAL SILO LEVEL LOW EXT
KILN STOPPED DUE TO RAW MEAL SILO LEVEL LOW EXT
KILN HEAT-UP EXT
KILN HEAT-UP EXT
Continuous running
KILN TRIPPED DUE TO BUS FAULT AND DELAY START DUE TO CALINER
FIRING BLOWER CHANGEOVER ELEC
Continuous running
POWER FAILURE EXT
COAL MILL CENTER YORK TEMPERATURE RTD WORK BECAUSE OF THAT
FINE COAL BIN LEVEL LOW EXT
BUS FAULT ELEC
COAL FIRING TRIPPED DUE TO SG156 & SG256 MORE LIMIT ON ELEC
Continuous running
Continuous running
Continuous running
Continuous running
Continuous running
Continuous running
COAL MILL MAIN DRIVE MOTOR REPAIR WORK DUE TO THAT FINE COAL
BIN LEVEL LOW EXT
5TH STAGE CYCLONE JAMMED PROD
BUS FAULT ELEC
BUS FAULT (ELEVEN TIMES) ELEC
Continuous running
KILN FEED CIRCUIT BUS FAULT ALARM ELEC
Continuous running
Continuous running
Continuous running
Continuous running
Continuous running
Continuous running
Continuous running
Paush2078
Reason Department
COAL MILL STOPPED (REAPIR WORK OF ROLLER LUBRICATION OIL LEAKAGE
MECH
FROM CENTER YORK)
SCALE (TYPE OF CYCLONE COATING) STUCK IN 5TH STAGE FEED PIPE
Continuous running
Continuous running
Continuous running
BUS FAULT
POWER FAILURE
PRIMARY AIR BLOWER BL570 TRIP
Continuous running
Continuous running
Continuous running
Continuous running
POWER FAILURE
Continuous running
POWER FAILURE
Continuous running
KILN TRIPPED DUE TO SG 256 & SG156 MORE LIMIT ON
POWER SYNCHRONIZATION
CP112 TRIPPED IN GENERAL FAULT
Continuous running
Continuous running
BUS FAULT
Mangsir2078
Date Nepali Date Stoppage Hrs

24.00
17/11/2021 01/08/2078
24.00
18/11/2021 02/08/2078
24.00
19/11/2021 03/08/2078
24.00
20/11/2021 04/08/2078
6.33
21/11/2021 05/08/2078
17.67
22/11/2021 06/08/2078 4.92
23/11/2021 07/08/2078 0.83
0.83
24/11/2021 08/08/2078 1.50
2.33
25/11/2021 09/08/2078 15.58
26/11/2021 10/08/2078 9.08
1.08
2.58
27/11/2021 11/08/2078 0
28/11/2021 12/08/2078 13.50
0.42
29/11/2021 13/08/2078 0.58
30/11/2021 14/08/2078 19.58
01/12/2021 15/08/2078 0
02/12/2021 16/08/2078 12.00
03/12/2021 17/08/2078 13.50
04/12/2021 18/08/2078 13.33
05/12/2021 19/08/2078 1.50
5.08
06/12/2021 20/08/2078 11.33
0.92
07/12/2021 21/08/2078 11.42
08/12/2021 22/08/2078 0.83
09/12/2021 23/08/2078 0.75
0.50
6.58
10/12/2021 24/08/2078 4.50
0.58
11/12/2021 25/08/2078 12.67
1.00
0.33
3.00
12/12/2021 26/08/2078 0
13/12/2021 27/08/2078 0.67
0.83
0.75
14/12/2021 28/08/2078 15.17
0.42
15/12/2021 29/08/2078 4.00
1.17

Paush2078
Date Nepali Date Stoppage Hrs
Mangsir2078
Reason Department

RAW MILL STOPPED DUE TO NON-AVAILABILITY OF CRUSHED LIMESTONE

RAW MILL STOPPED DUE TO NON-AVAILABILITY OF CRUSHED LIMESTONE

RAW MILL STOPPED DUE TO NON-AVAILABILITY OF CRUSHED LIMESTONE

RAW MILL STOPPED DUE TO NON-AVAILABILITY OF CRUSHED LIMESTONE

RAW MILL STOPPED DUE TO NON-AVAILABILITY OF CRUSHED LIMESTONE


KILN STOPPED
KILN STOPPED
DG008 MORE LIMIT ON
ROLLER LUBRIUCATION RETURN OIL TEMPERATURE HIGH
SILO FEED ELEVATOR BE050 BOOT LEVEL
KILN STOPPED
SILO FULL
SILO FULL
POWER FAILURE
KILN STOPPED
Continuous running
SILO FULL
GEAR BOX LUBRICATION PUMP M04 GENERAL FAULT
DG008 MORE LIMIT ON
SUFFICIENT STOCK
Continuous running
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
IRON HOPPER EMPTY
SUFFICIENT STOCK
SUFFICIENT STOCK
LIMESTONE HOPPER FEEDING BUCKET ELEVATOR BOOT FALSE ALARM
SUFFICIENT STOCK
MILL FEED BUCKET ELEVATOR BE220 BOOT LEVEL ALARM
HP PUMP M04 RETURN FAULT
HIGH VIBRATION
SUFFICIENT STOCK
SUFFICIENT STOCK
MILL FEED ELEVATOR BOOT LEVEL
SUFFICIENT STOCK
GEAR BOX LUBRICATION PUMP M04 RETURN FAULT TRIP
VIBRATION
LIMESTONE HOPPER EMPTY
Continuous running
MILL FEEDING BELT BC600 DICHARGE CHUTE JAMMED
LIMIT DRIFTING DG008
IRON ORE HOPPER JAMMED
SUFFICIENT STOCK
LIMIT DRIFTING DG008
SUFFICIENT STOCK
LIMIT DRIFTING & MORE LIMIT ON OF DG008

Paush2078
Reason Department
Mangsir2078
Date Nepali Date Stoppage Hrs

17/11/2021 01/08/2078 24.00


18/11/2021 02/08/2078 24.00
19/11/2021 03/08/2078 24.00
20/11/2021 04/08/2078 24.00
21/11/2021 05/08/2078 24.00
22/11/2021 06/08/2078 3.42
7.00
23/11/2021 07/08/2078 8.00
24/11/2021 08/08/2078 8.75
25/11/2021 09/08/2078 7.75
26/11/2021 10/08/2078 2.58
6.25
0.67
0.50
27/11/2021 11/08/2078 7.83
28/11/2021 12/08/2078 3.75
29/11/2021 13/08/2078 6.67
30/11/2021 14/08/2078 7.25
01/12/2021 15/08/2078 6.75
02/12/2021 16/08/2078 5.83
2.17
03/12/2021 17/08/2078 12.00
04/12/2021 18/08/2078 12.00
05/12/2021 19/08/2078 7.25
06/12/2021 20/08/2078 8.42
07/12/2021 21/08/2078 6.75
0.42
08/12/2021 22/08/2078 7.00
09/12/2021 23/08/2078 7.00
10/12/2021 24/08/2078 7.33
11/12/2021 25/08/2078 7.83
12/12/2021 26/08/2078 7.58
13/12/2021 27/08/2078 6.67
1.00
14/12/2021 28/08/2078 7.83
15/12/2021 29/08/2078 5.67
2.17
Paush2078
Date Nepali Date Stoppage Hrs
22.92
16/12/2021 01/09/2078
17/12/2021 02/09/2078 6.17
18/12/2021 03/09/2078 5.17
19/12/2021 04/09/2078 8.00
20/12/2021 05/09/2078 6.83
21/12/2021 06/09/2078 6.75
22/12/2021 07/09/2078 8.33
23/12/2021 08/09/2078 7.75
24/12/2021 09/09/2078 5.67
25/12/2021 10/09/2078 3.92
0.58
26/12/2021 11/09/2078 3.92
27/12/2021 12/09/2078 5.08
0.67
28/12/2021 13/09/2078 5.25
29/12/2021 14/09/2078 4.83
0.58
0.17
30/12/2021 15/09/2078 4.67
31/12/2021 16/09/2078 4.00
01/01/2022 17/09/2078 4.25
0.25
1.33
02/01/2022 18/09/2078 6.08
03/01/2022 19/09/2078 6.00
0.33
04/01/2022 20/09/2078 3.33
0.75
0.17
05/01/2022 21/09/2078 3.92
1.33
06/01/2022 22/09/2078
Mangsir2078
Reason Department

KILN STOPPED
KILN STOPPED
KILN STOPPED
KILN STOPPED
KILN STOPPED
KILN STOPPED
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
COAL MILL CENTER YORK TEMPERATURE RTD WORK
ROLLER LUBRICATION TEMPERATURE OPEN LOOP
POWER FAILURE
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
MECHANICAL MAINTENANCE
COAL MILL MAIN DRIVE MOTOR REPAIR WORK
KILN STOPPED
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
RAW COAL HOPPER DISCHARGE CHUTE JAMMED
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
ROLLER LUBRICATION TANK TEMPERATURE LOW
SUFFICIENT STOCK
SUFFICIENT STOCK
ROLLERLUBRICATION OIL LEVEL & ROLLER SEAL REOLACEMENT
Paush2078
Reason Department
REAPIR WORK OF ROLLER LUBRICATION OIL LEAKAGE FROM CENTER YORK
KILN STOPPED
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
ROLLER LUBRICATION TANK TEMPERATURE LOW
SUFFICIENT STOCK
SUFFICIENT STOCK
POWER FAILURE
SUFFICIENT STOCK
SUFFICIENT STOCK
POWER FAILURE
ROLLER LUBRICATION TEMPERATURE LOW
SUFFICIENT STOCK
SUFFICIENT STOCK
SUFFICIENT STOCK
WEIGHFEEDER JAMMED
RAW COAL RECLAIMER CHAIN DISLOCATED
SUFFICIENT STOCK
SUFFICIENT STOCK
ROLLER LUBRICATION TANK TEMPERATURE LOW
SUFFICIENT STOCK
ROLLER LUBRICATION TANK TEMPERATURE LOW
RAW COAL HOPPER DISCHARGE CHUTE JAMMED
SUFFICIENT STOCK
COAL WEIGHFEEDER JAMMED
Mangsir2078
Date Nepali Date Stoppage Hrs

17/11/2021 01/08/2078 5.17


16.00

18/11/2021 02/08/2078 0.25


0.50
0.50
2.42
19/11/2021 03/08/2078 1.25
20/11/2021 04/08/2078 21.33
21/11/2021 05/08/2078 24.00
22/11/2021 06/08/2078 15.75
23/11/2021 07/08/2078 5.92
2.75
24/11/2021 08/08/2078 0.58
4.92

25/11/2021 09/08/2078 0
26/11/2021 10/08/2078 19.00
27/11/2021 11/08/2078 0.50
0.42
0.33
28/11/2021 12/08/2078 1.92
0.58
0.42
0.42
0.42
29/11/2021 13/08/2078 0.83
0.42
14.58
30/11/2021 14/08/2078 1.67
0.17
6.67
01/12/2021 15/08/2078 5.00
2.75
02/12/2021 16/08/2078 0.42
4.58
03/12/2021 17/08/2078 10.67
0.50
04/12/2021 18/08/2078 14.17
0.50
05/12/2021 19/08/2078 11.08
06/12/2021 20/08/2078 6.17
07/12/2021 21/08/2078 16.50
08/12/2021 22/08/2078 7.17
0.83
09/12/2021 23/08/2078 3.00
0.33
4.67
10/12/2021 24/08/2078 4.50
11/12/2021 25/08/2078 2.75
12/12/2021 26/08/2078 0.08
13/12/2021 27/08/2078 18.00
14/12/2021 28/08/2078 24.00
15/12/2021 29/08/2078 24.00

Paush2078
Date Nepali Date Stoppage Hrs
16/12/2021 01/09/2078 2.58
0.33
0.33
17/12/2021 02/09/2078 1.00
0.17
18/12/2021 03/09/2078 1.50
0.33
0.83
19/12/2021 04/09/2078 3.92
0.17
20/12/2021 05/09/2078 0.25
21/12/2021 06/09/2078 0.17
6.25
22/12/2021 07/09/2078 11.75
1.42
23/12/2021 08/09/2078 0.50
0.67
24/12/2021 09/09/2078 0.58
25/12/2021 10/09/2078 7.17
26/12/2021 11/09/2078 6.75
2.67
0.33
27/12/2021 12/09/2078 1.00
0.42
0.33
28/12/2021 13/09/2078 0.50
29/12/2021 14/09/2078 3.58
0.58
0.75
30/12/2021 15/09/2078 18.00
31/12/2021 16/09/2078 6.00
0.67
01/01/2022 17/09/2078 12.75
02/01/2022 18/09/2078 10.67
0.42
0.17
0.42
03/01/2022 19/09/2078 1.25
0.50
04/01/2022 20/09/2078 6.25
1.67
0.42
05/01/2022 21/09/2078 15.83
0.17
Mangsir2078
Reason Department

PLANNED STOPPAGE EXT


SILO FEEDING ELEVATOR 611BE030 HEAD PULLY FRICTION LINER
REPLACEMENT WORK MECH
SILO CHANGE-OVER EXT
METAL DETECTOR MT012 UNHEALTHY ELEC
BAGHOUSE ROTARY FEEDER RF503 OVERLOAD ELEC
MILL FEEDING ELEVATOR BE220 DISCHARGE CHUTE JAMMED MISC
CLINKER HOPPER EMPTY DUE TO EXCAVATOR DRIVER NOT AVAILABLE EXT
PLANNED STOPPAGE EXT
PLANNED STOPPAGE EXT
PLANNED STOPPAGE EXT
MECHANICAL MAINTENANCE MECH
RF503 & SILO FEEDING BUCKET ELEVATOR (BE030) OVERLOAD TRIPPED ELEC
GEAR BOX LUBRICATION TEMPERATURE HIGH MECH
SILO FEED ELEVATOR BE050 OVERLOAD TRIPPED AND DELAY START DUE
TO ZSS PROXY ADJUSTMENT WORK ELEC
Continuous running
PLANNED STOPPAGE EXT
MILL REJECT BELT BC200 BSS OPERATED MECH
SILO CHANGEOVER EXT
SUDDEN VIBRATION MISC
LOW PRESSURE IN FOUR THRUSTPADS MISC
SILO CHANGEOVER EXT
SUDDEN VIBRATION MISC
ROLLER ADJUSTMENT MECH
MAIN DRIVE HIGH AMPS
LOW PRESSURE IN FOUR THRUSTPADS
HIGH VIBRATION
SUFFICIENT STOCK
SYSTEM FAULT IN THRUST PAD PRESSURE
CONTINUOUS METAL SENSING
SUFFICIENT STOCK
ROLLER ADJUSTMENT
SEPERATOR TOP BEARING TEMPERATURE HIGH
SEPERATOR GREASE LUBRICATION PUMP NOT RUNNING
PLANNED STOPPAGE
PLANNED STOPPAGE
SILO CHANGE OVER
PLANNED STOPPAGE
SILO CHANGE OVER
PLANNED STOPPAGE
PLANNED STOPPAGE
MECHANICAL MAINTENANCE
MECHANICAL MAINTENANCE
HIGH VIBRATION
WATER SPRAY INSPECTION WORK
THRUST PAD PRESSURE HIGH
BE220 TRIPPED IN HIGH AMPS
PLANNED STOPPAGE
PLANNED STOPPAGE
SILO CHANGEOVER
MECHANICAL MAINTENANCE
MECHANICAL MAINTENANCE
MECHANICAL MAINTENANCE

Paush2078
Reason Department
ROLLER LUBRICATION TANK TEMPERATURE LOW
SILO CHANGEOVER
POWER FAILURE
MILL FEEDING BELT BC600 DISCHARGE CHUTE JAMMED
SILO CHANGEOVER
MILL FEEDING BELT BC600 DISCHARGE CHUTE JAMMED
SILO CHANGEOVER
MATERIAL FLUSHED FROM MILL REJECT, ELEVATOR TRIPPED
MECHANICAL MAINTENANCE
SILO CHANGEOVER
SILO CHANGEOVER
SILO CHANGEOVER
CLINKER WEIGHFEEDER NON DRIVE END PULLY SHAFT FATIGUE SHEAR
NEA POWER NOT AVAILABLE
MILL FEEDING BUCKET ELEVATOR BE220 OVERLOAD TRIP
SILO CHANGEOVER
HIGH VIBRATION
SILO CHANGEOVER
PLANNED STOPPAGE
PLANNED STOPPAGE
ROLLER LUBRICATION RETURN OIL TEMPERATURE SHORT CIRCUIT
SILO CHANGEOVER
POWER FAILURE
SILO CHANGEOVER
BE030 MECHANICAL INSPECTION
SILO CHANGEOVER
POWER FAILURE
BC160 MOTION FAULT
BC600 DISCHARGE CHUTE JAMMED
PLANNED STOPPAGE
PLANNED STOPPAGE
WATER SPRAY PUMP TRIPPED
PLANNED STOPPAGE
PLANNED STOPPAGE
MS201 MOTION FAULT
SILO CHANGEOVER
WATER SPRAY TANK INLET VALVE MORE LIMIT ON
PLANNED STOPPAGE
WATER SPRAY TANK INLET VALVE MORE LIMIT ON
PLANNED STOPPAGE
SLAG HOPPER EMPTY
SILO CHANGEOVER
PLANNED STOPPAGE
SILO CHANGEOVER

You might also like