Month Aug-21
Qty Weight
N° Date Spec. Shift Ton/psc Defective Type Remark
(ea) (Ton)
1 12-Aug-21 D300-12m Crane's wire 1.411 1 1.411 Fall Down Crane's wire cut off
10
Total 8 10.109
Returning
Qty Weight
N° Date Spec. Div Ton/psc Site Remark
(ea) (Ton)
1 D300-7m 0.823 1 0.823
03-Aug-21 Meas sokunthea Phnom Penh Site Rejecting
2 D300-9m 0.710 1 0.710
3 10-Aug-21 D350-10m Kong Pheng 1.421 1 1.421 Phnom Penh Site Rejecting
Total 3 2.954
1 1 9.5
2 1 8
3 1 6
4 1 2
5 1
6 1
7 1
8 1
Total 4
CITY SITE
Remark 20 22
2nd Pile 12 14
2nd Pile 14 16
2nd Pile
2nd Pile
2nd Pile
2nd Pile
2nd Pile
PHC PILE Type D300 For SMART CITY SITE
Returning
Qty Weight
N° Date Spec. Div Ton/psc Site Remark
(ea) (Ton)
Total 7 8.584