DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.

NEW PTA COMPLEX PROJECT / ADANA


MAIN SUBSTATION

14.01.2022

DEĞİRMENCİ YAPI İNŞ.DAN.OTO. SAN.VE TİC.LTD.ŞTİ.


NEW PTA COMPLEX PROJECT / ADANA

MAIN SUBSTATION SLAB FORM ANALYSIS


PERI GAZİANTEP

1 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

1. MATERIAL FEATURES AND CONCEPT OF DESIGN


1.1. Timber Beam VT 20

Load capacity mentioned above will be used because 1*VT 20 was used as secondary grid.

Twice of load capacity mentioned above will be used beacuse 2*VT 20 were used as main ridge.

2 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

1.2. PD8 SYSTEM LOAD SCAFFOLD

Loads on PD8 Load Scaffolds will be compared with spindel lenght above the table and
load capacity equaled to to scaffold height.

3 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

1.3. 10X10 cm Timber Wadges (Secondary Grid)

b = 10 cm ve h = 10 cm olan Analysis for timber wedge durability

σem= 0.70 kN/cm² (Allowable Bending Stress)


τem= 0.09 kN/cm² (Shearing)
E= 1,000.00 kN/cm² (Elasticity Module) (parallel to fibers)

I=b x h³ / 12= 833.33 cm^4 (Inertia Moment)


W=I / (h/2)= 166.67 cm^3 (Moment of resistance)

M / W ≤ σem M≤ 1.17 kNm (Bending moment)


τem=(3/2) x Q / A Q= 0.00 kN (Shear Force)

4 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

1.4. Concept of Design

5 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

6 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

2. FORM SETTLING

PLAN

TPYE SECTION

7 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

3. X-X Direction Beam Formwork Load Design

Load Design will be made acc. to EN 12812 as d = 100cm beam thickness.

a. Concrete Load

Concrete Density; gconcrete is regarded as 24.50 kN/m³ . Hereunder:

for d = 100 cm; Q2,b = 24.50 X 1.00 = 24.50 kN/m²

b. Moving Loads:

Moving Loads are divided into 2 parts: Moving Loads by reason of concreting and Moving
Loads by reason of working on slab.

- Live Loads by Reason of Concreting.

Q4 = 0.1 X Q2,b
0.75 kN/m² ≤ Q4 ≤ 1.75 kN/m²

for d = 100 cm ; Q4 = 0.1 X 24.50 = 2.45 kN/m² > 1.75 kN/m² so


Q4 = 1.75 kN/m² is regarded.

- Live Loads by Reason of Working on Slab.

Due to working ( acc. to weight of workers, tools etc.) Also:

Q2,p = 0.75 kN/m² is regarded.

c. Formwork Load:

For timber beam VT 20K and secondary grids which are supported by PD8 Scaffolds, under the
slab.

Q1 = 0.40 kN/m² is regarded.

d. Total Load:

for d = 100 cm: Q = Q1 + Q2,b + Q2,p + Q4 = 0.40 + 24.50 + 0.75 + 1.75 = 27.40 kN/m²

8 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

3.1. Control of Formwork Components

a. Secondary Grid Timber Beam VT 20K

Between grids: e = 50 cm. Distrubuted Load on grid :

for d = 100 cm : q = Q x e = 27.40 X 0.50 = 13.70 kN/m

Section impacts by using PERI Continuous Beam programme:

If maximum values are compared with allowable values above:

Vmax = 4.11 kN < Vper = 11 kN


Amax = 4.11 kN < Aper = 22 kN
Mmax = 2.441 kNm < M per = 5.00 kNm

9 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT/ ADANA
MAIN SUBSTATION

14.01.2022

b. Timber Beam VT 20K Main Ridge

Coming Load to Main Ridge (Q): Amax / e = 4.11 kN / 0.50 m = 8.22 kN/m

Section impacts for main ridge by using PERI Continuous Beam programme:

If maximum values are compared with allowable values above:

Vmax = 6.8 kN < Vper = 11 kN


Amax = 9.68 kN < Aper = 22 kN
Mmax = 1.429 kNm < M per = 5.00 kNm

10 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

c. PD8 System Load Scaffold

Support reactions which is in calculation for ridge are regarded as coming load for each scaffold leg.

So coming load for scaffold leg :

Amax = 9.68 kN

When coming load to scaffold leg is compared with the table and when spindel lenght is less than 30cm,
maximum load capacity for scaffold leg is calculated as 53.20 kN.

Amax = 9.68 kN < Aper = 53.20 kN so scaffold can carry the load safely.

11 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

4. Y-Y Direction Beam Formwork Load Design

Load Design will be made acc. to EN 12812 as d = 100cm beam thickness.

a. Concrete Load

Concrete Density; gconcerete is regarded as 24.50 kN/m³ . Hereunder:

for d = 100 cm; Q2,b = 24.50 X 1.00 = 24.50 kN/m²

b. Live Loads:

Live Loads are divided into 2 parts: Live Loads by reason of concreting and Live Loads by
reason of working on slab.

- Live Loads by Reason of Concreting

Q4 = 0.1 X Q2,b
0.75 kN/m² ≤ Q4 ≤ 1.75 kN/m²

for d = 100 cm ; Q4 = 0.1 X 24.50 = 2.45 kN/m² > 1.75 kN/m² so


Q4 = 1.75 kN/m² is regarded.

- Live Loads by Reason of Working on Slab

Due to working EN12812 ( acc. to weight of workers, tools etc.) Also:

Q2,p = 0.75 kN/m² is regarded.

c. Formwork Load:

For timber beam VT 20K and secondary grids which are supported by PD8 Scaffolds, under the
slab.

Q1 = 0.40 kN/m² is regarded.

d. Total Load:

for d = 100 cm: Q = Q1 + Q2,b + Q2,p + Q4 = 0.40 + 24.50 + 0.75 + 1.75 = 27.40 kN/m²

12 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

4.1. Control of Formwork Components

a. Secondary Grid Timber Beam VT 20K

Between grids: e = 50 cm. Distrubuted Load on grid :

for d = 100 cm : q = Q x e = 27.40 X 0.50 = 13.70 kN/m

Section impacts by using PERI Continuous Beam programme:

If maximum values are compared with allowable values above:

Vmax = 4.11 kN < Vper = 11 kN


Amax = 4.11 kN < Aper = 22 kN
Mmax = 2.441 kNm < M per = 5.00 kNm

13 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

b. Timber Beam VT 20K Main Ridge

Coming Load to Main Ridge (Q): Amax / e = 4.11 kN / 0.50 m = 8.22 kN/m

Section impacts for main ridge by using PERI Continuous Beam programme:

If maximum values are compared with allowable values above:

Vmax = 6.7 kN < Vper = 11 kN


Amax = 13.38 kN < Aper = 22 kN
Mmax = 1.81 kNm < M per = 5.00 kNm

14 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

c. PD8 System Load Scaffold

Support reactions which is in calculation for ridge are regarded as coming load for each scaffold leg.

So coming load for scaffold leg :

Amax = 13.38 kN

When coming load to scaffold leg is compared with the table and when spindel lenght is less than
30cm, maximum load capacity for scaffold leg is calculated as 53.20 kN.

Amax = 13.38 kN < Aper = 53.20 kN so scaffold can carry the load safely.

15 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

5. Slab Formwork Load Design:

Load Design will be made acc. to EN 12812 as d = 32cm beam thickness.

a. Concrete Load

Concrete Density; gconcrete = 24.50 kN/m³ is regarded. Hereunder:

for d = 32 cm; Q2,b = 24.50 X 0.32 = 7.84 kN/m²

b. Live Loads:

Live Loads are divided into 2 parts: Live Loads by reason of concreting and Live Loads by
reason of working on slab.
- Live Loads by Reason of Concreting

Q4 = 0.1 X Q2,b
0.75 kN/m² ≤ Q4 ≤ 1.75 kN/m²

for d = 32 cm ; Q4 = 0.1 X 7.84 = 0.79 kN/m²

- Live Loads by Reason of Working on Slab

Due to working EN12812 ( acc. to weight of workers, tools etc.) Also:

Q2,p = 0.75 kN/m² değeri alınır.

c. Formwork Load:

For timber beam VT 20K and secondary grids which are supported by PD8 Scaffolds, under the
slab.

Q1 = 0.40 kN/m² is regarded.

d. Total Load:

for d = 32 cm : Q = Q1 + Q2,b + Q2,p + Q4 = 0.40 + 7.84 + 0.75 + 0.79 = 9.78 kN/m²

16 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

3.1. Control of Formwork Components

a. 10X10 cm Tali Izgara

Between grids: e = 30 cm. Distrubuted Load on grid :

for d = 32 cm : q = Q x e = 9.78 X 0.30 = 2.93 kN/m.

Section impacts by using PERI Continuous Beam programme:

When maximum values are compared with allowable values above:

Vmax = 2.40 kN < Vper = 6.00 kN


Amax = 3.87 kN < Aper = 12 kN
Mmax = 0.493 kNm < M per = 1.17 kNm

17 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

b. Timber Beam VT 20K Main Ridge

Coming Load to Main Ridge (Q): Amax / e = 3.87 kN / 0.30 m = 12.90 kN/m

Section impacts for main ridge by using PERI Continuous Beam programme:

If maximum values are compared with allowable values above:

Vmax = 7.33 kN < Vper = 11 kN


Amax = 14.18 kN < Aper = 22 kN
Mmax = 2.007 kNm < M per = 5.00 kNm

18 / 19
DEGIRMENCI YAPI INS.DAN.OTO. SAN.VE TIC.LTD.STI.
NEW PTA COMPLEX PROJECT / ADANA
MAIN SUBSTATION

14.01.2022

c. PD8 System Load Scaffold


Support reactions which is in calculation for ridge are regarded as coming load for each scaffold leg.

So coming load for scaffold leg :

Amax = 14.18 kN

When coming load to scaffold leg is compared with the table and when spindel lenght is less than
30cm, maximum load capacity for scaffold leg is calculated as 53.20 kN.

Amax = 14.18 kN < Aper = 53.20 so scaffold can carry the laod safety.

19 / 19