Professional Documents
Culture Documents
RESUME
SHAIK FARAD
Email: - shaikfarad855@gmail.com
Mob: - 0593477390,0572397639
PLUMBING QC INSPECTOR (Aramco Approved)
OBJECTIVE
Looking for an environment to explore my academic Qualification and professional
Experience, which offers a challenging, and career growth environment where I can exercise
my expertise and can bring out the best of ability and efficiency.
OVERVIEW
Job Responsibilities:
➢ Material receiving inspection of CS, RTR, PVC, UPVC, CPVC, pipes, fittings, valves, fire
hydrant, Alarm check valve, Sprinkler Heads, Fire Hose Cabinet, Plumbing Fixtures (EWC,
WWC, Lavatories, WHA, Valves, EWH, Flashometer Valves, Hose Bibb, Faucets, Jani tor
Sinks, Kitchen Sink, P-Trap, Vent thru Roof & Plumbing Specialties (Floor Drains, Cleanouts
& Roof Drains).
➢ To check and monitor the proper application of approved duct sealant, proper
installation of flexible duct connection to diffusers or air terminals.
➢ To check and monitor Fire dampers and volume dampers installation as per the
requirements of SAES K-001 and NFPA 90B.
➢ Ensuring the pipes, fittings and adhesive are in proper handling, Storage and
Preservation.
➢ Able to read /understand all sorts of HVAC Drawing with foundation/civil/wall opening and
obstruction of other departments.
➢ Material receiving inspection of prefabricated ducts, AHU/ACCU, PACU, Split Unit,
Volume Damper, Fire Damper (Combination Fire/Smoke Damper), Motorized Volume
Damper (MVD), Exhaust Fan/Blower, Grilles & Diffusers, Flexible duct, Prefabricated
Machine Connection, Insulation (Fiber Glass duct board and Armaflex for Refrigerant
Piping’s, Duct Sealant, Copper Pipes Type K or L for refrigerant lines, various vibration
isolators and hangers/supports for ducting system and piping system.
SHAIK FARAD PLUMBING / HVAC QC INSPECTOR
PERIENCE IN INDIAs
SHAIK FARAD PLUMBING / HVAC QC INSPECTOR
Job Responsibilities:
➢ Review all approved HVAC & Plumbing Drawings along with construction specifications
reference for checking all delivered materials.
➢ Preparation of all Material Documentations and drawings for the preparations of material
receiving.
➢ Materials receiving inspection for all HVAC & Plumbing Equipment, accessories, pipes fittings,
valves ducts, insulation, duct sealant and plumbing fixtures/specialties.
➢ Responsible for monitoring and inspection of all activities in HVAC/Plumbing activities to
maintain the quality of production works in installation and construction.
➢ Implement all required standard codes such as SMACNA, ASHRAE, UMC, UPC and NFPA13.
➢ Proper coordination to construction in-charge for any discrepancy in drawings, specifications
and installation to avoid any violation in quality.
➢ Responsible to raised inspection to client Representative such us hydrostatic test for Chilled
Water Pipes, Potable water lines and fire sprinkler piping system. To performed gravity test
for Sanitary Sewer lines. Light testing for Ducting System to identify the leakage and quality
of workmanship.
➢ To check all the duct thickness as per the schedule specified in the IFC and all the pipes for
chilled water system with prefabricated insulation.
➢ Maintain and file all the records of material receiving inspection, testing and pre-
commissioning documents.
➢ Update all changes in IFC drawing as red-marking prior to AS-BUILT along with approved field
request report.
➢ Attend quality meeting to resolve all non-conformance report and make suggestion for good
quality and good m=workmanship.
➢ VOLTAS LIMITED
➢ Location: AHMEDABAD
➢ Project: AHMEDABAD VOLTAS LIMITED Pvt.Ltd.
➢ Duration: Feb 2014 to Jan 2015.
➢ Position: HVAC Engineer.
Job Responsibilities:
➢ Able to read /understand all sorts of HVAC Drawing with foundation/civil/wall opening and
interaction of other departments.
SHAIK FARAD PLUMBING / HVAC QC INSPECTOR
➢ Responsible to get the approval of the concerned drawing related to this scope of work as per
the project with the SAUDI ARAMCO Authorities & Consultant.
➢ Coordination the scope of work as per Bill of Quantity (B,O,Q) as approved by the client as
confirmed by consultant.
➢ Calculation of co-efferent of heat transfer of various material such as wall, roof, partition,
floor, glass, ceiling with help of Annexure.
➢ Calculation heat load in accordance with ASHRAE and carrier codes.
➢ Selecting desirable machines for required zones by taking required values from the catalogue.
➢ Calculating the pump head quantities, cost estimation & Quality Analysis as required.
➢ Co-ordination with Design team and installation team at site for proper execution of the
project.
➢ Preparation of project status report and scheduling of site work.
➢ Maintain an internal meeting for proper coordination between the planning, designing,
accounts, operations, and Warehouse & Project staff.
➢ Selection of chillers as per the client’s requirement keeping in view of the budget allotted and
service affordable.
➢ PS TECHCOM
➢ Location: BENGALURU
➢ Project: BENGALURU PS TECHCOM Pvt.Ltd.
➢ Duration: Apr 2012 to Nov 2013.
➢ Position: PLUMBING / HVAC INSPECTOR.
Job Responsibilities:
➢ Material receiving inspection of CS, RTR, PVC, UPVC, CPVC, pipes, fittings, valves, fire
hydrant & plumbing fixtures/specialties.
➢ Material receiving inspection of prefabricated ducts, AHU/ACCU, PACU, Split Unit,
Volume Damper, Fire Damper (Combination Fire/Smoke Damper), Motorized Volume
Damper (MVD), Exhaust Fan/Blower, Flexible duct, Prefabricated Machine
Connection, Insulation (Fiber Glass duct board and Armaflex for Refrigerant Pipings,
Duct Sealant, Copper Pipes Type K or L for refrigerant lines, various vibration isolators
and hangers/supports for ducting system and piping system.
➢ To ensure that all chilled water lines and insulation are in compliance to
construction specifications and ASHRAE.
➢ To ensure all ducts and fittings are in correct thickness are specified in the duct sizes
schedule in IFC Drawings.
➢ Monitoring & inspections the Installations of hangers and support including the
correct alignment and elevations.
➢ Conduct & perform light test for supply and return ducts and hydrostatic test for
chilled water piping system
➢ Witness the flushing, passivation and chemical treatment of chilled water piping
after satisfactory passed the hydrostatic test.
SHAIK FARAD PLUMBING / HVAC QC INSPECTOR
➢ Monitoring and inspection for Sprinklers & Standpipe Installation, Hangers &
supports, Valves, Flow Switch, Tamper Switch and Alarm Check Valve Assembly
installations.
➢ Installation inspection of plumbing fixtures and specialties (Cleanout & floor drains).
➢ Installation of fire hydrants and Post indicator valves.
➢ Carried visual and dimensional inspections.
➢ Witnessing the sewer line flushing and disinfection / Chlorination of PW/DW Lines.
➢ QC Line Check and Punch clearing activities.
➢ Preparation of Inspection and test packages.
➢ Monitoring implementation of QC procedure during construction activities
➢ Reviewing the documentation and guiding the contractor in maintaining the ITP and
Quality Procedures shall always be implemented.
➢ Verification for the water tightness test for all plumbing fixtures & water heaters.
OBJECTIVE
EDUCATIONAL QUALIFICATION
TECHNICAL QUALIFICATION
➢ Well Verse for International Standard Code & SAUDI ARAMCO ENGINEERING
STANDARD
➢ SOFTWARE SKILLS.
DECLARATION
I hereby declare that the above given particulars are true to the best of my knowledge
and belief.
Place: DAMMAM.
Date: SHAIK FARAD