You are on page 1of 1

Republic of the Philippines

Department of Education
Region XII
Division of Sarangani
East Malungon District
DAKOK TAMULON INTEGRATED SCHOOL

PROGRAM OF WORKS
DETAILED COST ESTIMATE

PROJECT:
SHOOL ID: 500835
SCHOOL: Dakok Tamulon Integrated School
OWNER:
LOCATION; Nagpan, Malungon, Sarangani Province
MONTH: August
DATE PREPARED: August 11, 2021
CALENDAR DAYS OF IMPLEMENTATION:

ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST GRAND TOTAL
NO. . MATERIAL LABOR MATERIAL LABOR
G.I. Gate valve 1/2 inch 1 ₱180.00 ₱180.00
G.I. Swing Valve 1/2 inch 1 ₱270.00 ₱270.00
G.I. Ball Valve 1/2 inch 1 ₱270.00 ₱270.00
G.I. Nipple 3x1/2 inch 2 ₱30.00 ₱60.00
G.I. Elbow 1/2 inch 1 ₱15.00 ₱15.00
P.E. Tee 1/2 inch 1 ₱80.00 ₱80.00
P.E. Elbow 1/2 inch 4 ₱260.00 ₱1040.00
P.E. Male Adaptor 1/2 inch 3 ₱150.00 ₱450.00
P.E. Female Adaptor 1/2 inch 2 ₱100.00 ₱200.00
Faucet 1/2 piece 2 ₱60.00 ₱120.00
Teflon Small piece 3 ₱60.00 ₱180.00
SDR II Hose 1/2 m 250 ₱20.16 ₱5040.00

1 DIRECT COST ₱7905.00

Prepared by: Noted: Approved:

___________________________
MARILYN O. FALSARIO KATHERINE FAITH L.
ASTURIAS
School Head Division Engineer

NOTE:
1 LABOR COST MUST NOT EXCEED TO 35% OF MATERIAL COST
2 ATTACH DETAILED PLAN
3 ATTACH YOUR SCHOOL SITE DEVELOPMENT PLAN HIGHLIGHTING THE LOCATION OF YOUR PROPOSED PROJECT
4 ATTACH YOUR APPROVED AIP 2020

You might also like