You are on page 1of 3

WORK INSTRUCTION

XXXXXXXXX
Document No : WI-XX-XXX Responsibility : ENGINEERING Originate Date :
Revision No : 0 Revision Date : - Page : 1 of XX

XXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

1.0 XXXXXXXXXXXXXXXX

2.0 XXXXXXXXXXXXXXXXXXX

3.0 XXXXXXXXXXXXXXXX

4.0 XXXXXXXXXXXXXXXXXXXXXXXXX

Prepared by Approved by Acknowledged by

XXXXXXX XXXXXXXXXXXXX XXXXXXXXXXXXXX

Engineering Manager Management Representative

UNCONTROLLED IF PRINTED WITHOUT STAMPED "CONTROLLED”


WORK INSTRUCTION

XXXXXXXXX
Document No : WI-XX-XXX Responsibility : ENGINEERING Originate Date :
Revision No : 0 Revision Date : - Page : 2 of XX

Date: Date: Date

STEP# PROCESS CRITERIA TOOL PIC

1.0 PREPARATION (PERSIAPAN)


XX XXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX. XXXXXXXXXXXXX XXXXXXXXXXX
X

XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXX

2.0 XXXXXXXXXXXXXXX

2.1 XXXXXXXXXXXXX XXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXX

XXXXXXXXXXXXXXXXX XXXXXXXXXXXXX XXXXXXXXXXXXXX


X

UNCONTROLLED IF PRINTED WITHOUT STAMPED "CONTROLLED”


WORK INSTRUCTION

XXXXXXXXX
Document No : WI-XX-XXX Responsibility : ENGINEERING Originate Date :
Revision No : 0 Revision Date : - Page : 3 of XX

PROCESS CRITERIA TOOL PIC


STEP#

XXXXXXXXXX
XXXXXXXXXXXXXXXXXX
4.0 Revision History (Sejarah Perubahan)
Rev No Rev Date Description Orig Eff. Date
0 - New release XXXXXXXXXX

UNCONTROLLED IF PRINTED WITHOUT STAMPED "CONTROLLED”

You might also like