Professional Documents
Culture Documents
RELEASE TO GM PAGE 79
HELP PAGE 90
Accessing
SUPPLYPOWER – OPENING GDIMPS
Tip:
• You can register the user to have access
to one or many DUNS numbers.
5
SUPPLYPOWER – REQUESTING ACCESS
2 2
7
SUPPLYPOWER – OPENING GDIMPS
1
2
Tool Details
Internet Browser
Note: Some users have found FireFox to work
Google Chrome
9
CLEARING CACHE - CHROME 1
11
Training
GDIMPS SYSTEM MESSAGES
•1 If changes are not saved, a warning message
1 will be displayed
•3 Select the X
2
3
Note: Not clearing the system messages will cause the messages to stack -up and could cause confusion to the user.
13
RFQ Summary
RFQ SUMMARY 1
2 1 Notification Bell
3
• Will be red
when a new
notification is
available
• Can hide and/or
expand
notifications
2 Review Notifications
4
Associated with an
RFQ
• Hide/Delete
Notifications
Tip: Recommend to
close the Notifications
3 Work Area will retain active data until user purges Tip:
• Notification are RFQ specific. Utilize the RFQ
Search functionality to find the “In Process”
4 Search Active RFQ by Key Fields RFQs by
o DUNS
o SMT
o Creativity Team
15
o Quote Variant Type
RFQ SUMMARY – REVIEW NOTIFICATIONS
1
Adjust 3
2
1 DUNS Number:
• Will show a list all DUNS the logged in
user is assigned
Tip:
• All DUNS can be searched • An e-mail notification will
NOT be sent to you. Please
2 Select message(s) to delete. Can select all plan on checking the
Note: Will keep messages for 30 days maximum notifications on a regular
basis.
3 Sort on any column
• Select the column header to sort A-Z or Note:
• The suppliers will continue to
vise-versa receive sourcing packages
4 Select an RFQ number to add to the work area math data through Rocket
(TruSource or Trubiquity)
5 Navigate through the pages of notifications
16
RFQ SUMMARY – WORK AREA
6 7 8 9
10
11
1 Response Required By – Display quotes due that day and in the future
2 RFQ Status
• In Process – Open RFQ
• Pending Approval – Buyer has recommended a supplier for Approval (Note: This may or may not be you)
• Approved – RFQ is approved Note: This may or may not be you. You MUST
wait to hear from your buyer to proceed. This
3 DUNS # - Only see DUNS # associated with the user ID does not constitute a written or verbal contract.
4 SMT – Search on the SMT (group of CTs) associated with the RFQ
5 CT – Search on the Creativity Team associated with the RFQ
6 Part # - Search by part numbers associated with the RFQ
• Can search multiple parts with a comma delimited 18
RFQ SUMMARY – RFQ SEARCH / FILTER CRITERIA
1 2 3 4 5
6 7 8 9
10
11
7 Component Part – Component part numbers on the RFQ found in the CCA section of the Part
Breakdown
9 Quote Variant Type – Search on the Quote Variant Type with the RFQ
11 Clear Filter – Clears search results and removes any previous results
Search Results
• Add multiple RFQ to the work area by using the check boxes and
• Add single RFQ by clicking the RFQ number hyperlink
19
• Sort on any column - Select the column to sort A-Z or vise-versa
Supplier RFQ
SUPPLIER RFQ
1 8
3 4 5
7
6
Supplier Main Action Page – Select the Round Number under the RFQ
Note: An individual part cannot be
1 Decline/Un-decline – Do not want to quote any part on the RFQ declined, just do not enter a price for
the parts that you do not want to quote
2 Tooling 1810 Form – Hyperlink to the recent 1810 form
3 Document Center - Attach Supporting Files – Tooling (1810), ED&D Cost Card, etc.
4 Download Excel – Download part(s) Quote variant type/ prototype template in Excel format
5 Print Part Breakdown – Print PDF Part Breakdown
6 Part Breakdown & Prototype Detail – Select the parts to respond for the RFQ
7 Apply Part Breakdown – Ability to replicate a released Part Breakdown to one or more parts
21
8 Release to GM – After entering part breakdowns
SUPPLIER RFQ
9 Withdraw/Un-Withdraw from Quote– Previously submitted a quote and now want to inactivate
it (will not be considered for sourcing) or reactivate it
Note: The If the Part Number has a specific Receiving Plant identified, DO NOT quote the first row for that part is not an error message, but an informational
message
• If the part number is duplicated on the RFQ and the top line is a blank receiving plant and the lines below contain assembly
plants, do not quote the blank receiving plant row, only the receiving plant row(s)
• Use the Apply Part Breakdown to replicate the quote to the other receiving plants
The Prototype Pricing should be provided after a successful "Release to GM" of all parts being quoted (if required for the RFQ) is not an error message, but an
informational message
22
• Enter the part quotes, then successfully release to GM, before the prototype pricing is entered
SUPPLIER RFQ – TOOLING 1810 FORM HYPERLINK
#.#.# X YYY-MM-DD
23
SUPPLIER RFQ – DOCUMENT CENTER
• Attach Supporting Files – Tooling (1810), ED&D Cost Card, RFQ Remarks, etc.
1
• Both Buyer and Supplier can attach/view files
• Files with extension .A3S, .CATIA, .IGES, .JT, .PLMXML, .PRT, .STP, .WIRE, .CGM, .DWG, .IGS, .X_T, .NSF, .OST, .PST,
.MDB, .MDBX, .EXE, .BAT, .MSI, .BIN, .CMD, .COM, .CPL, .GADGET, .INF, .INS, .INX, .ISU, .JOB, .JSE, .LNK, .MSC, .MSP,
.MST, .PAF, .PIF, .PS1, .REG, .RGS, .SCT, .SHB, .SHS, .U3P, .VB, .VBE, .VBSCRIPT, .WS and .WSF are not allowed to be
uploaded as supporting documentation.
• Use the browser to select the file Tip: Only 10MB of data per upload
• Select Upload
24
SUPPLIER RFQ – DOCUMENT CENTER
2
4
2• Agree to the GM Terms and Conditions Clause
Tip: The files will be visible to GM before
3• Document will be added to the document center the Release to GM button is pushed
4• Upload
5
6
7• Re-Upload – Select the file(s) to upload and overwrite the prior file 25
Enter Part
Breakdown (1804c)
SUPPLIER RFQ – ENTER PART BREAKDOWN
4 5
5 6
1
2
3
28
1804C PART BREAKDOWN–TIPS
• Use Drop Downs where available – user can type in the values, but capitalization
does matter and MUST match or errors will occur on pasting into GDiMPS
• Select the Magnifying Glass when prompted for pop -up selections
• These data points are linked
• The TAB key and the arrow keys work great when navigating
• Six Decimals max on values
Tip: The round formula in GDiMPS works
=round(CELL LOCATION, Number of decimals)
Note: The copy from Web is only for the BOM section
2 4
1 5
1• Quoted Currency – Use drop down to selected the part’s quoted currency
2• Manufacturing Location/DUNS – This cannot be changed. You must work with the buyer to add
the correct manufacturing location to the RFQ
3• Est. Effective Date – This is the estimated effective date for start of production or shipping
4• Supplier Daily Capacity (SDC) – Do not make changes to current production or replaced parts
5• Inco Term – Defaults to FCA, any changes to this requires an explanation
30
SUPPLIER RFQ – ENTER PART BREAKDOWN BOM
1 2 3 4 5 6
1 2
3
2 3
1• Drop Down Boxes – Select from drop down or type in (Must match capitalization)
2• Pop Up Boxes - Select from pop up boxes
3• Recalculate – Will update the values to the latest contract price GM is paying
• Used for Index Material (IM), Resale, FX Rate
32
1804C PART BREAKDOWN – OP ITEM DESCRIPTION
3
4 4 4 5 6
1 2
7 8 9 0
1 OP (Operation)
• Operation Description/Machine Type/Machine Size
2• Select the Magnifying Glass on Operation Description cell
3• Selection criteria pop-up box appears. Make selections and click Apply
4• Selections will populate the Operation Description, Machine Type and Machine Size
•5 Operation Cycle Time in Seconds = 3600/Gross Parts per Hour(exc OEE and process scrap)
•6 Net JPH (Jobs Per Hour)= (3600*Parts per Cycle/Operation Cycle Time in Seconds) * OEE %
•7 Direct Labor Cost(per Part) = (Fully Fringed Direct Labor Hourly Rate * Direct Labor Head
Count)/Net JPH
•8 Hourly Burden Rate = (Total Burden Cost * 3600)/Operation Cycle Time in Seconds
•9 CapEx for Mfg. Equipment / Assy. Line
33
•0 CapEx Currency – Currency of the CapEx
1804C PART BREAKDOWN – P ITEM DESCRIPTION
2 3
1 P (Purchased Components)
•2 Unit of Measure
• Will default to EA – Each
• Other selections will be limited to:
• GR – GRAM
• KG - KILOGRAM
• LB – POUND
• LT - LITER
• MR - METER
• SM - SQUARE METER
•3 Handling Cost is not available for Purchased Components
34
1804C PART BREAKDOWN – D ITEM DESCRIPTION
2 3
35
1804C PART BREAKDOWN – IM ITEM DESCRIPTION
2 2 3 4
Tip:
Note: The Index Material will update to the • Gross weight is required to have
latest contract price that GM is paying recovery of material or use
Scrap Recovery
Note: Must have approval from your buyer to use Index Material. You • Net weight is the actual
• Delta weight is used for
should contact your buyer to ensure the correct Index Material is selected.
recovery
1 IM (Index Material) – Indexation is to remove raw material price risk in order to have
better cost transparency and eliminate material price hedging.
•2 Base Material/Material Exchange/Unit of Measure Tip: If using Scrap Recovery, be sure to
select the Index Material that has the “SR”
• Select the Magnifying Glass on Base Material cell
• Selection criteria pop-up box appears Important: Some Index Materials are marked as
“OBSOLETE” and you may be asked to select a new index
• Make selections and click Apply
• Selections will populate the Base Material/Material Exchange/Unit of Measure
•3 Unit of Measure – Will still contain ALL of the available measurements
•4 Handling Cost is not available for Index Material 36
1804C PART BREAKDOWN – IM ITEM DESCRIPTION (RESIN-MANAGED BUY)
2
1
1 IM (Index Material) –The Managed Resin Buy Program
offerings are now available under the “IM” item type to
track parts utilizing the program
2 Select the Magnifying Glass on Base Material to select
3 Enter first five digits of the GMW Spec & Type
3 4 5
2 2 3
Note: The Resale will update to the latest Note: Must have approval from your buyer to use Resale. You should
contract price/price GM is paying contact your buyer to ensure the correct Index Material is selected.
Tip: When quoting new business, the ORCID ID is unknown and cannot be selected until the business is
awarded. In this case, use “RM” item type and contact the buyer for additional directions 38
1804C PART BREAKDOWN – RM ITEM DESCRIPTION
2 2 3 4
1 RM – Raw Material
•2 Material Specification
• Select the Magnifying Glass on Material Specification
• Selection criteria pop-up box appears
• Make selections and click Apply
• Selections will populate the Base Material/Material Exchange/Unit of Measure
3
• Unit of Measure – GR – GRAM, KG - KILOGRAM, LB – POUND, LT – LITER, MR – METER,
EA – EACH, SM - SQUARE METER
•
4 Handling Cost is not available for Raw Material
39
1804C PART BREAKDOWN – CURRENCY FOR FX INDEXATION
Tip: In the header, make sure the Note: The FX Indexation cannot
Quoted Currency is selected and exceed 50% of the Total Selling Price
the Est. Effective Date is entered without buyer approval
41
SUPPLIER RFQ – ENTER PART BREAKDOWN BOM PASTE FROM EXCEL
Note: The copy from Web is only for the BOM section
•1 Piece Cost Summary – Contains the summary of the 1804c part breakdown
• Mandatory - SG&A, Profit
• Optional - Sequencing Sub-Assy, ED&D
•2 Packaging Details – Optional
• Expendable – Includes both Interior and Exterior cost in the Grand Total – Selling Price
• Standard (Dunnage in Returnable Containers) – Includes only Interior cost in the Grand
Total – Selling Price
• Specialized – None of the cost are included in the Grand Total – Selling Price
•3 Other Cost Details – Optional miscellaneous cost
•4 Long Term Agreements – Optional future price reductions off of the Total Base Price 43
SUPPLIER RFQ – SAVE PART BREAKDOWN
1• Save – Will save the changes made to the 1804c. Error message may be given at this time
Tip: The form can have blank cells, Tip: If a fraction digit error is given
except Item Description as this is • Click on a cell within the BOM
mandatory • Search for the value (Control+F)
• Type the number in the search field,
but you are REQUIRED to round the
Tip: At the bottom of the screen is a search to the limited to X.. For
Session Timeout, you will need to save example, in this case 1.1234567
before the timer reaches 0:00 was in error, but search on the
44
rounded number to 6 or 1.123457
SUPPLIER RFQ – DELETE PART BREAKDOWN
1 2
3
45
Enter
Prototype
SUPPLIER RFQ – PROTOTYPE
1
2 3 4
• When quoting Prototype, the same parts MUST be quoted as returned 1804c
Tip:
• You do not have to quote at every round, just the final round
• If you enter a piece price, you must enter a multiplier. If you have different multiplier, then use an average.
• The Multiplier must be a whole number and cannot contain decimals.
48
PROTOTYPE DETAILS – COPY FROM EXCEL
1 2
1
• View the Parts Tab
2
• Check the part(s) to download
• Download to Excel
• Download Part Breakdown
• One part per Excel file
• Either open the file(s) or save
• Multiple parts/files will open in WinZip
•
3 Enable Editing in Excel
Note: Downloading the Excel template is now optional. The Excel files are for those that want to work with the
template offline. The quote entry is now online. The Excel data can be copied from Excel and pasted into GDiMPS
YYY-MM-DD
•1 Open Quote Entry Sheet – Opens the 1804c Breakdown quote entry sheet
Tip: We recommend you download a fresh 1804c with each new RFQ as the form
could have changed or been updated for new Index Materials or Material Operations.
52
1804C PART BREAKDOWN
1
4 5
Note: The BOM may have one or more lines that are
6 prepopulated with data. This data was entered by
the buyer as the preferred operation/material in the
BOM. The supplier should use this data in their
quote. Please contact the buyer with any questions
7 or concerns about the prepopulated BOM.
•
1 Copy to Web – Ability to copy the BOM data to prepare to paste into GDiMPS
•
2 Header
•
3 Bill of Materials (BOM)
•
4 Piece Price Cost Summary
•
5 Packaging Detail
•
6 Other Costs Detail 53
•
7 Long Term Agreements (LTAs)
1804C PART BREAKDOWN–TIPS
• Use Drop Downs where available – user can type in the values, but capitalization
does matter and MUST match or errors will occur on pasting into GDiMPS
54
1804C PART BREAKDOWN–TIPS
• The MACRO buttons are gone – Use the native Excel functionality
• Use Excel to Copy/Paste (Shift rows up/down), Add Rows, Delete Rows, Resize Columns
• Caution – The Excel formulas are not locked and can be accidentally changed. Upon pasting
into GDiMPS, the formula will be corrected.
• Linking the template to other Excel files – Under the Home ribbon, in the Number category,
set the drop down list to number and the formulas will show the results and not the formula.
55
1804C PART BREAKDOWN– HEADER
3
2 4
1 5
•2 Manufacturing Location/DUNS – This cannot be changed. You must work with the buyer to add
the correct manufacturing location to the RFQ
•3 Est. Effective Date – This is the estimated effective date for start of production or shipping
•4 Supplier Daily Capacity (SDC) – Do not make changes to current production parts or replaced
parts
56
1804C PART BREAKDOWN – OP ITEM DESCRIPTION
3
4 4 4 5 6 7 8 9 0
1
2 Note: OEE = Overall
Equipment Effectiveness
1 OP (Operation)
• Operation Description/Machine Type/Machine Size
2• Double click on Operation Description cell
3• Selection criteria pop-up box appears. Make selections and click Apply
4• Selections will populate the Operation Description, Machine Type and Machine Size
•5 Operation Cycle Time in Seconds = 3600/Gross Parts per Hour(exc OEE and process scrap)
•6 Net JPH (Jobs Per Hour)= (3600*Parts per Cycle/Operation Cycle Time in Seconds) * OEE %
•7 Direct Labor Cost(per Part) = (Fully Fringed Direct Labor Hourly Rate * Direct Labor Head
Count)/Net JPH
•8 Hourly Burden Rate = (Total Burden Cost * 3600)/Operation Cycle Time in Seconds
•9 CapEx for Mfg. Equipment / Assy. Line
57
•0 CapEx Currency – Currency of the CapEx
1804C PART BREAKDOWN – P ITEM DESCRIPTION
2 3
1 P (Purchased Components)
•2 Unit of Measure
• Will default to EA – Each
• Other selections will be limited to:
• GR – GRAM
• KG - KILOGRAM
• LB – POUND
• LT - LITER
• MR - METER
• SM - SQUARE METER
•3 Handling Cost is not available for Purchased Components
58
1804C PART BREAKDOWN – D ITEM DESCRIPTION
2 3
59
1804C PART BREAKDOWN – IM ITEM DESCRIPTION
2 2 3 4
Note: Must have approval from your buyer to use Index Material. You
should contact your buyer to ensure the correct Index Material is selected.
1 IM (Index Material) – Indexation is to remove raw material price risk in order to have
better cost transparency and eliminate material price hedging. Tip:
• Gross weight is required to have recovery
•2 Base Material/Material Exchange/Unit of Measure of material or use Scrap Recovery
• Select the Magnifying Glass on Base Material cell • Net weight is the actual
• Delta weight is used for recovery
• Selection criteria pop-up box appears
Important: Some Index Materials are marked as
• Make selections and click Apply “OBSOLETE” and you may be asked to select a new index
• Selections will populate the Base Material/Material Exchange/Unit of Measure
•3 Unit of Measure – Will still contain ALL of the available measurements
•4 Handling Cost is not available for Index Material Tip: If using Scrap Recovery, be sure to 60
select the Index Material that has the “SR”
1804C PART BREAKDOWN – IM ITEM DESCRIPTION (RESIN-MANAGED BUY)
2
2
1 IM (Index Material) –The Managed Resin Buy
Program offerings are now available under the
“IM” item type to track parts utilizing the program
2 Double click on Base Material to select
3 Enter first five digits of the GMW Spec & Type
3 4 5
2 2 3
Tip: When quoting new business, the ORCID ID is unknown and cannot be selected until the business is
awarded. In this case, use “RM” item type and contact the buyer for additional directions 62
1804C PART BREAKDOWN – RM ITEM DESCRIPTION
2 2 3 4
1 RM – Raw Material
•2 Material Specification
• Double click on Material Specification
• Selection criteria pop-up box appears
• Make selections and click Apply
• Selections will populate the Base Material/Material Exchange/Unit of Measure
3
• Unit of Measure – GR – GRAM, KG - KILOGRAM, LB – POUND, LT – LITER, MR – METER,
EA – EACH, SM - SQUARE METER
•
4 Handling Cost is not available for Raw Material
63
1804C PART BREAKDOWN – CURRENCY FOR FX INDEXATION
Tip: In the header, make sure the Note: The FX Indexation cannot
Quoted Currency is selected and exceed 50% of the Total Selling Price
the Est. Effective Date is entered without buyer approval
4
Note: The Effective Date
MUST be after the Est.
Effective Date in the header
•1 Piece Cost Summary – Contains the summary of the 1804c part breakdown
• Mandatory - SG&A, Profit
• Optional - Sequencing Sub-Assy, ED&D
•2 Packaging Details – Optional
• Expendable – Includes both Interior and Exterior cost in the Grand Total – Selling Price
• Standard (Dunnage in Returnable Containers) – Includes only Interior cost in the Grand
Total – Selling Price
• Specialized – None of the cost are included in the Grand Total – Selling Price
•3 Other Cost Details – Optional miscellaneous cost
•4 Long Term Agreements – Optional future price reductions off of the Total Base Price
65
SUPPLIER RFQ – ENTER PART BREAKDOWN BOM PASTE FROM EXCEL
2
66
SUPPLIER RFQ – ENTER PART BREAKDOWN BOM PASTE FROM EXCEL
1
• View the Parts Tab
Tip: You do not have to check the parts
2
• Download to Excel
• Either open the file(s) or save
•3 Enable Editing in Excel
Note: Downloading the Excel template is now optional. The Excel files are for those that want to work with the
template offline. The quote entry is now online. The Excel data can be copied from Excel and paste into GDiMPS
70
PROTOTYPE DETAILS – TEMPLATE
1
1• Header
2• Body
71
PROTOTYPE DETAILS – TEMPLATE
• When quoting Prototype, the same parts MUST be quoted as returned 1804c
Tip:
• You do not have to quote at every round, just the final round
• If you enter a piece price, you must enter a multiplier. If you have different multiplier, then use an average.
• The Multiplier must be a whole number and cannot contain decimals.
72
PROTOTYPE DETAILS – COPY FROM EXCEL
75
SUPPLIER RFQ – PRINT SINGLE BREAKDOWN
3
1 2
1• For the Parts tab Select one part – Part does not have to be released to GM
2• Select the Part Breakdown Tab
3• Print Part Breakdown – Downloads a single file or zip file of the 1804c Part Breakdowns for
Printing. The part breakdowns will be in a PDF format.
76
SUPPLIER RFQ – PRINT SINGLE BREAKDOWN
1
77
SUPPLIER RFQ – PRINT BREAKDOWN TEMPLATE(S)
1 2
1
• View the Parts Tab
2
• Check the part(s) to download
• Download to Excel
• Download Part Breakdown
• One part per Excel file
• Either open the file(s) or save
• Multiple parts/files will open in WinZip
• Enable Editing in Excel
78
Release to GM
SUPPLIER RFQ – RELEASE TO GM (WITH ERRORS)
1
2
Tip: Do not check part numbers on the Part Tab as you cannot release
specific parts. It is an entire release to GM, not part by part release.
1
• The release to GM will allow the GM users to view the data
• If validation errors are found, an error message directing you to notification messages
2
2
2
IMPORTANT: If the buyer releases a new round and you do not
want to change your pricing, you MUST push the Release to GM
for the new round
Tip: Do not check part numbers on the Part Tab as you cannot
release specific parts. It is an entire release to GM not part release.
1
• The release to GM will allow the GM users to view the data
2• If no validation errors are found, a message directing you to the notification messages
• Release to GM – Y = Successfully Released and GM users can see that part quote 2
Note: The screen does not update automatically, you will need to refresh
Note: This is a batch job, the accepted message may take a few minutes
Tip: Toggle the notification bell to refresh the screen 81
Apply Part
Breakdown
SUPPLIER RFQ – APPLY PART BREAKDOWN
1 3
• Apply Part Breakdown – For the Apply Part Breakdown to function, the source part MUST be
released to GM 1 st . This will prevent spreading errors to multiple parts. This will copy the
ENTIRE 1804c data from the source part to the target part
•1 Parts Tab– Select ONE part, the source part. The part MUST be Released to GM
•2 Released to GM - The part MUST be Released to GM
•3 Apply Part Breakdown – Open the Apply Part Breakdown tab. This will contain the target parts
Tip:
• Ideal for right hand/left hand parts.
• This will also work great with parts with similar 1804c part breakdowns.
Just apply the part breakdown, then edit the 1804c on screen. 83
SUPPLIER RFQ – APPLY PART BREAKDOWN
3
2
•1 Select Parts – Select one or more parts to apply the source 1804c part breakdown to
•2 Apply Part Breakdown – Push the button to apply
•3 Apply Part Breakdown Confirm – Yes = apply or No = Cancel
•4 Screen will update Created and the 1804c
4 IMPORTANT: If the part number is duplicated on the RFQ and the top line is
a blank receiving plant and the line(s) below contain assembly plants, do not
quote the blank receiving plant row, only the receiving plant row(s)
IMPORTANT: When you apply the part breakdown, it DOES NOT release the
selected part(s) to GM. You MUST go back and Release to GM again. 84
Supplier RFQ
Tips / Common
Errors
SUPPLIER RFQ – TIP CANNOT RESPOND TO RFQ
2
1
1• Check the Resp Req By date. This date CANNOT be past due.
2• Release to GM is grayed out
3• The BOM grid is white
• If the date is past due, please contact the buyer to change the due date or add a
new quote round.
• If the date is not past due, please contact GDiMPS help. 86
SUPPLIER RFQ – TIP NO PARTS AVAILABLE
Tip: If the RFQ Round is not available in the work area, the RFQ has
not been released to the supplier(s). Please contact your buyer.
87
SUPPLIER RFQ – MULTIPLE QUOTE ROUNDS
1
2
• Click the DUNS number to open the most recent RFQ round
• The prior round data will update into the current round
• The quote data can be updated and Released to GM
IMPORTANT: If the buyer releases a new round and you do not
want to change your pricing, you still MUST push the Release to
GM for the new round
88
SUPPLIER RFQ – NO DATA HAS BEEN ENTERED TO RELEASE
89
Additional Help
GDIMPS ADDITIONAL SUPPORT
1
1• ? Help
• This will direct you to SupplyPower for additional training documents, training videos,
FAQs, form instructions
91