VI.

PERHITUNGAN TULANGAN BALOK DAN KOLOM


A. PERHITUNGAN TULANGAN BALOK LANTAI 1
1. Penulangan Balok B1
Diambil, ø sengkang = 8 mm
ø utama = 22 mm
a. Mencari Tulangan Tumpuan
As perlu = 884,14 mm2 , diambil tulangan tumpuan 3 ø 22 (As = 1140,4 mm2).
b. Mencari Tulangan Lapangan
As perlu = 697,50 mm2 , diambil tulangan lapangan 2 ø 22 (As = 760,2 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 22 = 66 mm
2 x jarak tulangan = 2 x 30 = 60 mm
222 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
170 mm ≤ b = 250 mm (OK)

2. Penulangan Balok B2
Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 326,50 mm2 , diambil tulangan tumpuan 4 ø 12 (As = 452 mm2).
b. Mencari Tulangan Lapangan
As perlu = 324,03 mm2 , diambil tulangan lapangan 4 ø 12 (As = 452 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 12 = 48 mm
3 x jarak tulangan = 3 x 30 = 90 mm
234 mm ≤ b = 250 mm (OK)
Cek tul. Lapangan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 12 = 48 mm
3 x jarak tulangan = 3 x 30 = 90 mm
234 mm ≤ b = 250 mm (OK)

3. Penulangan Balok B3
Diambil, ø sengkang = 8 mm
ø utama = 16 mm
a. Mencari Tulangan Tumpuan
As perlu = 444,08 mm2 , diambil tulangan tumpuan 3 ø 16 (As = 603 mm2).
b. Mencari Tulangan Lapangan
As perlu = 500,42 mm2 , diambil tulangan lapangan 3 ø 16 (As = 603 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK)
4. Penulangan Balok B4
Diambil, ø sengkang = 8 mm
ø utama = 16 mm
a. Mencari Tulangan Tumpuan
As perlu = 778,83 mm2 , diambil tulangan tumpuan 4 ø 16 (As = 804,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 568,49 mm2 , diambil tulangan lapangan 3 ø 16 (As = 603,2 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 16 = 64 mm
3 x jarak tulangan = 3 x 30 = 90 mm
250 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK)

5. Penulangan Balok B5
Diambil, ø sengkang = 8 mm
ø utama = 22 mm
a. Mencari Tulangan Tumpuan
As perlu = 1514,28 mm2 , diambil tulangan tumpuan 4 ø 22 (As = 1520,5 mm2).
b. Mencari Tulangan Lapangan
As perlu = 1173,68 mm2 , diambil tulangan lapangan 4 ø 22 (As =1520,5 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 22 = 88 mm
3 x jarak tulangan = 3 x 30 = 90 mm
27
4 mm ≥ 250 mm ( TIDAK OK)

Dicoba kontrol lebar balok (jika tulangan 2 lapis), karena tulangan 1 lapis tidak
mencukupi.
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
17
0 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 22 = 88 mm
3 x jarak tulangan = 3 x 30 = 90 mm
27
4 mm ≥ 250 mm ( TIDAK OK)

Dicoba kontrol lebar balok (jika tulangan 2 lapis), karena tulangan 1 lapis tidak
mencukupi.
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
17
0 mm ≤ b = 250 mm (OK)

6. Penulangan Balok B6
Diambil, ø sengkang = 8 mm
ø utama = 22 mm
a. Mencari Tulangan Tumpuan
As perlu = 1372,11 mm2 , diambil tulangan tumpuan 4 ø 22 (As = 1520,5 mm2).
b. Mencari Tulangan Lapangan
As perlu = 1047,56 mm2 , diambil tulangan lapangan 3 ø 22 (As =1140,4 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 22 = 88 mm
3 x jarak tulangan = 3 x 30 = 90 mm
27
4 mm ≥ 250 mm ( TIDAK OK)

Dicoba kontrol lebar balok (jika tulangan 2 lapis), karena tulangan 1 lapis tidak
mencukupi.
Digunakan tulangan sengkang Ø 8mm

Checking jarak tulangan:


2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
17
0 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 22 = 66 mm
2 x jarak tulangan = 2 x 30 = 60 mm
22
2 mm ≤ b = 250 mm (OK)

7. Penulangan Balok BA1


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 110,20 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 258,0 mm2 , diambil tulangan lapangan 3 ø 12 (As = 339,3 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 200 mm (OK)

8. Penulangan Balok BA2


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 145,23 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 258 mm2 , diambil tulangan lapangan 3 ø 12 (As = 339,3 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 200 mm (OK)
B. PERHITUNGAN TULANGAN BALOK LANTAI 2
1. Penulangan Balok B7
Diambil, ø sengkang = 8 mm
ø utama = 22 mm
a. Mencari Tulangan Tumpuan
As perlu = 873,77 mm2 , diambil tulangan tumpuan 3 ø 22 (As = 1140,4 mm2).
b. Mencari Tulangan Lapangan
As perlu = 684,80 mm2 , diambil tulangan lapangan 2 ø 22 (As = 760,2 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 22 = 66 mm
2 x jarak tulangan = 2 x 30 = 60 mm
22
2 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
170 mm ≤ b = 250 mm (OK

2. Penulangan Balok B8
Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 289,16 mm2 , diambil tulangan tumpuan 3 ø 12 (As = 339,3 mm2).
b. Mencari Tulangan Lapangan
As perlu = 323,36 mm2 , diambil tulangan lapangan 3 ø 12 (As = 339,3 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 250 mm (OK
Cek tul. Lapangan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 6 = 12 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 250 mm (OK

3. Penulangan Balok B9
Diambil, ø sengkang = 8 mm
ø utama = 16 mm
a. Mencari Tulangan Tumpuan
As perlu = 387,88 mm2 , diambil tulangan tumpuan 3 ø 16 (As = 603,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 501,78 mm2 , diambil tulangan lapangan 3 ø 16 (As = 603,2 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK
4. Penulangan Balok B10
Diambil, ø sengkang = 8 mm
ø utama = 16 mm
a. Mencari Tulangan Tumpuan
As perlu = 774,25 mm2 , diambil tulangan tumpuan 4 ø 16 (As = 804,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 584,31 mm2 , diambil tulangan lapangan 3 ø 16 (As = 603,2 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 16 = 64 mm
3 x jarak tulangan = 3 x 30 = 90 mm
250 mm ≤ b = 250 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK

5. Penulangan Balok B11


Diambil, ø sengkang = 8 mm
ø utama = 22 mm
a. Mencari Tulangan Tumpuan
As perlu = 1464,24 mm2 , diambil tulangan tumpuan 4 ø 22 (As = 1520,5 mm2).
b. Mencari Tulangan Lapangan
As perlu = 1146,93 mm2 , diambil tulangan lapangan 4 ø 22 (As =1520,5 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 22 = 88 mm
3 x jarak tulangan = 3 x 30 = 90 mm
27
4 mm ≥ 250 mm ( TIDAK OK)

Dicoba kontrol lebar balok (jika tulangan 2 lapis), karena tulangan 1 lapis tidak
mencukupi.
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
17
0 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 22 = 88 mm
3 x jarak tulangan = 3 x 30 = 90 mm
27
4 mm ≥ 250 mm ( TIDAK OK)

Dicoba kontrol lebar balok (jika tulangan 2 lapis), karena tulangan 1 lapis tidak
mencukupi.
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
17
0 mm ≤ b = 250 mm (OK)

6. Penulangan Balok B12


Diambil, ø sengkang = 8 mm
ø utama = 22 mm
a. Mencari Tulangan Tumpuan
As perlu = 1333,85 mm2 , diambil tulangan tumpuan 4 ø 22 (As = 1520,5 mm2).
b. Mencari Tulangan Lapangan
As perlu = 1043,28 mm2 , diambil tulangan lapangan 3 ø 22 (As =1140,4 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 22 = 88 mm
3 x jarak tulangan = 3 x 30 = 90 mm
27
4 mm ≥ 250 mm ( TIDAK OK)

Dicoba kontrol lebar balok (jika tulangan 2 lapis), karena tulangan 1 lapis tidak
mencukupi.
Digunakan tulangan sengkang Ø 8mm

Checking jarak tulangan:


2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 22 = 44 mm
1 x jarak tulangan = 1 x 30 = 30 mm
17
0 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 22 = 66 mm
2 x jarak tulangan = 2 x 30 = 60 mm
22
2 mm ≤ b = 250 mm (OK)
7. Penulangan Balok BA3
Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 97,27 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226 mm2).
b. Mencari Tulangan Lapangan
As perlu = 258,00 mm2 , diambil tulangan lapangan 3 ,2ø 12 (As = 339,3 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 200 mm (OK)

8. Penulangan Balok BA4


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 121,03 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 258,00 mm2 , diambil tulangan lapangan 3 ø 12 (As = 339,3 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
222 mm ≤ b = 200 mm (OK)
C. PERHITUNGAN TULANGAN BALOK LANTAI 3 (ATAP)
1. Penulangan Balok B13
Diambil, ø sengkang = 8 mm
ø utama = 19 mm
a. Mencari Tulangan Tumpuan
As perlu = 531,94 mm2 , diambil tulangan tumpuan 2 ø 19 (As = 567,0 mm2).
b. Mencari Tulangan Lapangan
As perlu = 418,31 mm2 , diambil tulangan lapangan 2 ø 19 (As = 567,0 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 19 = 38 mm
1 x jarak tulangan = 1 x 30 = 60 mm
19
4 mm ≤ b = 250 mm (OK)

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 19 = 38 mm
1 x jarak tulangan = 1 x 30 = 60 mm
19
4 mm ≤ b = 250 mm (OK)

2. Penulangan Balok B14


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 166,66 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 202,34 mm2 , diambil tulangan lapangan 2 ø 12 (As = 226,2 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 250 mm (OK
Cek tul. Lapangan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 250 mm (OK

3. Penulangan Balok B15


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 277,27 mm2 , diambil tulangan tumpuan 3 ø 12 (As = 339,3 mm2).
b. Mencari Tulangan Lapangan
As perlu = 378,10 mm2 , diambil tulangan lapangan 3 ø 12 (As = 339,3 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 250 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 12 = 36 mm
2 x jarak tulangan = 2 x 30 = 60 mm
192 mm ≤ b = 250 mm (OK
4. Penulangan Balok B16
Diambil, ø sengkang = 8 mm
ø utama = 16 mm
a. Mencari Tulangan Tumpuan
As perlu = 480,59 mm2 , diambil tulangan tumpuan 3 ø 16 (As = 603,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 378,10 mm2 , diambil tulangan lapangan 2 ø 16 (As = 402,2 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 16 = 32 mm
1 x jarak tulangan = 1 x 30 = 30 mm
160 mm ≤ b = 250 mm (OK

5. Penulangan Balok B17


Diambil, ø sengkang = 8 mm
ø utama = 19 mm
a. Mencari Tulangan Tumpuan
As perlu = 831,43 mm2 , diambil tulangan tumpuan 3 ø 19 (As = 850,5 mm2).
b. Mencari Tulangan Lapangan
As perlu = 641,94 mm2 , diambil tulangan lapangan 3 ø 19 (As = 850,5 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 19 = 57 mm
2 x jarak tulangan = 2 x 30 = 60 mm
21
3 mm ≤ b = 250 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 19 = 57 mm
2 x jarak tulangan = 2 x 30 = 60 mm
21
3 mm ≤ b = 250 mm (OK

6. Penulangan Balok B18


Diambil, ø sengkang = 8 mm
ø utama = 16 mm
a. Mencari Tulangan Tumpuan
As perlu = 775,20 mm2 , diambil tulangan tumpuan 4 ø 16 (As = 804,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 552,02 mm2 , diambil tulangan lapangan 3 ø 16 (As = 603,2 mm2).
Cek tul. Tumpuan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
4 x Ø tulangan pokok = 4 x 16 = 64 mm
3 x jarak tulangan = 3 x 30 = 90 mm
250 mm ≤ b = 250 mm (OK
Cek tul. Lapangan
Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
3 x Ø tulangan pokok = 3 x 16 = 48 mm
2 x jarak tulangan = 2 x 30 = 60 mm
204 mm ≤ b = 250 mm (OK

7. Penulangan Balok BA5


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 43,89 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 190,95 mm2 , diambil tulangan lapangan 2 ø 12 (As = 226,2 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK

8. Penulangan Balok BA6


Diambil, ø sengkang = 8 mm
ø utama = 12 mm
a. Mencari Tulangan Tumpuan
As perlu = 44,54 mm2 , diambil tulangan tumpuan 2 ø 12 (As = 226,2 mm2).
b. Mencari Tulangan Lapangan
As perlu = 194,24 mm2 , diambil tulangan lapangan 2 ø 12 (As = 226,2 mm2).

Cek tul. Tumpuan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK

Cek tul. Lapangan


Kontrol lebar balok (jika tulangan 1 lapis)
Digunakan tulangan sengkang Ø 8mm
Checking jarak tulangan:
2 x selimut beton = 2 x 40 = 80 mm
2 x Ø sengkang = 2 x 8 = 16 mm
2 x Ø tulangan pokok = 2 x 12 = 24 mm
1 x jarak tulangan = 1 x 30 = 30 mm
150 mm ≤ b = 200 mm (OK
D. PERHITUNGAN TULANGAN KOLOM LANTAI 1
Gambar As Perlu Portal Exterior

Gambar As Perlu Portal Interior


1. Penulangan Kolom K1
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.

2. Penulangan Kolom K2
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.

3. Penulangan Kolom K3
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.
4. Penulangan Kolom K4
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.
E. PERHITUNGAN TULANGAN KOLOM LANTAI 2
Gambar As Perlu Portal Exterior

Gambar As Perlu Portal Interior


1. Penulangan Kolom K5
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.

2. Penulangan Kolom K6
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.

3. Penulangan Kolom K7
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 1788,86 mm2 , diambil tulangan 8 ø 19 (As = 2268,0 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 19 = 304 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.
4. Penulangan Kolom K8
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.
F. PERHITUNGAN TULANGAN KOLOM LANTAI 3
Gambar As Perlu Portal Exterior

Gambar As Perlu Portal Interior


1. Penulangan Kolom K9
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 1101,04 mm2 , diambil tulangan 8 ø 16 (As = 1608,5 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 16 = 256 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.

2. Penulangan Kolom K10


Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.

3. Penulangan Kolom K11


Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 1571,55 mm2 , diambil tulangan 8 ø 16 (As = 1608,5 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 16 = 256 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.
4. Penulangan Kolom K12
Digunakan formasi tulangan pokok 4 sisi dengan jumlah tulangan 8, maka :
As perlu = 900,00 mm2 , diambil tulangan 8 ø 12 (As = 904,8 mm2).
Untuk tulangan sengkang diambil ø 8,
Perhitungan jarak sengkang tidak boleh lebih dari :
- 48 kali diameter sengkang = 48 . 8 = 384 mm
- 16 kali diameter tulangan pokok = 16 . 12 = 192 mm
- Lebar kolom = 300 mm
Diambil tulangan sengkang ø 8-150.