Bill of Quantities

S/N Description Unit Unit Price (RO)

Section 1: Trench Construction


Carriageway Surfaces
Section 1 -01 1 way 25mm duct m 2.398
Section 1 -02 1 way 50mm duct m 2.438
Section 1 -03 1 way 110 mm duct m 2.585
Section 1 -04 2 way 110 mm duct m 2.825
Section 1 -05 4 way 110 mm duct m 3.555
Section 1 -06 1 way 110 mm GI Pipe m 4.009
Section 1 -07 2 way 110 mm GI Pipe m 4.218
Footway Surfaces
Section 1 -08 1 way 25mm duct m 1.747
Section 1 -09 1 way 50mm duct m 1.824
Section 1 -10 1 way 110 mm duct m 1.884
Section 1 -11 2 way 110 mm duct m 1.732
Section 1 -12 4 way 110 mm duct m 2.005
Section 1 -13 1 way 110 mm GI Pipe m 4.367
Section 1 -14 2 way 110 mm GI Pipe m 4.673
Unmade Surfaces
Section 1 -15 1 way 25mm duct m 1.444
Section 1 -16 1 way 50mm duct m 1.656
Section 1 -17 1 way 110 mm duct m 1.656
Section 1 -18 2 way 110 mm duct m 1.354
Section 1 -19 4 way 110 mm duct m 1.571
Section 1 -20 1 way 110 mm GI Pipe m 4.061
Section 1 -21 2 way 110 mm GI Pipe m 4.035
Open Trench
Section 1 -22 1 way 25mm duct m 0.070
Section 1 -23 1 way 50mm duct m 0.206
Section 1 -24 1 way 110 mm duct m 0.190
Section 1 -25 2 way 110 mm duct m 0.141
Section 1 -26 4 way 110 mm duct m 0.379
Section 1 -27 1 way 110 mm GI Pipe m 0.340
Section 1 -28 2 way 110 mm GI Pipe m 0.581
Section 2: Blockages
Rectify duct blockage in Footway- Locate blockage, ea
section 2 -01 excavate (all footway surfaces) repair duct backfill and
reinstatement 12.677
Rectify duct blockage in Carriageway- Locate blockage, ea
section 2 -02 excavate (all carriageway surfaces) repair duct backfill and
reinstatement 14.692
ea
section 2 -03 Locate buried chamber cover and raise to ground level
23.570
Section 3: Vibration Free Drilling
Core through Chamber wall vibration free
section 3 -01 1 x 110mm duct ea 7.062
section 3 -02 2 x 110mm duct ea 7.519
section 3 -03 1 x 50mm duct ea 7.018
Core through building wall vibration free ea -
section 3 -04 1 x 110mm duct ea 5.153
section 3 -05 2 x 110mm duct ea 7.408
section 3 -06 1 x 50mm duct ea 3.995
Section 4: Misc. Civils Operations
Supply and installation of Lean Mix Concrete for wadi and m3
section 4 -01
re-instatement works with a depth of 1m -2m 31.923
section 4 -02 Excess excavation up to 1m-2m depth m3 3.108
section 4 -03 Excess excavation up to 2m-5m depth m3 4.530
section 4 -04 Break Out Gabions (Flat) including netting and fixings m2 12.992
section 4 -05 Break Out Gabions (Wall) including netting and fixings m2 15.699
section 4 -06 Provide And Lay Conc. Quality 'C' For Protection m3 7.548
section 4 -07 Break Out Boulder Rock m3 10.549
Excavate Trial pit in normal soil between surface level & 1 m3
section 4 -08
m depth 3.552
Excavate Trial pit in normal soil between 1 m to 2m depth m3
section 4 -09
4.350
Excavate Trial pit in hard soil between surface level & 1 m m3
section 4 -10
depth 4.709
Excavate Trial pit in hard soil between 1 m to 2m depth m3
section 4 -11
5.413
Excavate Trial pit in rocky soil between surface level & 1 m m3
section 4 -12
depth 10.345
Excavate Trial pit in rocky soil between 1 m to 2m depth m3
section 4 -13
21.466
Installation/Fixing of 25 mm bend for use with wall capping ea
section 4 -14
0.360
Installation/Fixing of 50 mm bend for use with wall capping
section 4 -15 ea
0.468
Installation/Fixing of 110 mm bend for use with wall
section 4 -16 ea
capping 0.790
Section 6: Chamber Construction
Carriageway Surfaces
Section 6 -01 Precast Type 4 Chamberwith D400 lid(s) ea 54.076
Section 6 -02 Precast Type 6 Chamber -with D400 lid(s) ea 65.459
Footway and Unmade Surfaces
Section 6 -03 Precast Type 4 Chamber- with D400 lid(s) ea 42.348
Section 6 -04 Precast Type 6 Chamber -with D400 lid(s) ea 57.578
Misc. Items
Section 6 -05 Install Gas Seal (Caulking Gland) 110mm ea 0.271
Section 6 -06 Install Gas Seal (Caulking Gland) 50mm ea 0.232
Drill through chamber wall non-vibration free
Section 6 -07 1 x 110mm duct ea 8.457
Section 6 -08 2 x 110mm duct ea 9.758
Drill through building wall non-vibration free
Section 6 -09 1 x 110mm duct ea 3.865
Section 6 -10 2 x 110mm duct ea 4.786
Section 6 -11 1 x 50mm duct ea 4.006
Section 6 -12 1 x 25mm duct ea 1.719
Section 6 -13 Neck/Collar Raising of Type 4 Chamber up to 500mm ea 46.537
Section 6 -14 Neck/Collar Raising of Type 6 Chamber up to 500mm ea 58.486
ea
Section 6 -15
Neck/Collar Raising of round shaft manhole up to 500mm 52.204
Demolish existing Chamber in all surfaces, Includes back fill ea
Section 6 -16
& reinstatement 40.686
Section 7: FDH Construction
section 7 -01 Install Precast FDH Base ea 33.944
section 7 -02 Fitting of Fibre Street Cabinet ea 32.479
FDH Protection Posts- supply & fit 1 x 90mm galvanised ea
section 7 -03 iron pipes set in concrete protruding 1.5m above ground
level 8.470
section 7 -04 Relocation/Dismantling of exisiting FDH cabinet ea 65.608
section 7 -05 Sealing of all cables in cabinet ea 3.400
section 7 -06 Install Name Plate for FDH cabinet ea 2.165
Section 8: External Cabling
Cabling in external network
Rod and Rope duct section Empty bore. Install nylon m
Section 8 -01
draw rope in empty bore 0.092
Rod and Rope duct section Occupied bore.Install nylon m
Section 8 -02
draw rope in occupied bore. 0.108
Section 8 -03 Install F.O. Cable < 20mm Diam Empty bore. m 0.097
Section 8 -04 Install F.O. Cable < 20mm Diam Occupied bore. m 0.151
Section 8 -05 Install F.O. Cable > 20mm Diam Empty bore. m 0.087
Section 8 -06 Install F.O. Cable >20mm Diam Occupied bore. m 0.164
Cabling on Wall
Section 8 -07 Up to 30mm Cable on wall (Internal) m 0.193
Section 8 -08 Up to 30mm Cable on wall (External) m 0.216
Fit Galvanised Steel Trunking
Section 8 -09 100mm x 100mm m 0.725
Section 8 -10 100mm x 50mm m 0.678
Section 8 -11 75mm x 75mm m 0.587
Section 8 -12 50mm x 50mm m 0.506
Fit PVC Trunking
Section 8 -13 100mm x 100mm m 0.564
Section 8 -14 100mm x 50mm m 0.506
Section 8 -15 75mm x 75mm m 0.476
Section 8 -16 50mm x 50mm m 0.367
Section 8 -17 20mm x 10mm m 0.312
Fit PVC Spiral Flexible Conduit
Section 8 -18 10mm m 0.162
Section 8 -19 25mm m 0.208
Fit Galvanised Steel tray
Section 8 -20 50mm m 0.978
Section 8 -21 100mm m 0.619
Section 8 -22 150mm m 1.254
Section 8 -23 225mm m 1.437
Wall Mounted Equipment
Section 8 -24 Fit CAP ea 3.079
Section 8 -25 Fit internal FDH ea 19.488
Section 8 -26 Fit internal NAP ea 8.878
Section 9: Cable Preparations
External Locations (including FDHs)
section 9 -17 4 fiber Cable and Preparation Per Cable End 1.967
section 9 -01 24 fibre cable end preparation Per Cable End 3.920
section 9 -02 36 fibre cable end preparation Per Cable End 5.566
section 9 -03 48 fibre cable end preparation Per Cable End 4.668
section 9 -04 72 fibre cable end preparation Per Cable End 7.088
section 9 -05 96 fibre cable end preparation Per Cable End 7.583
section 9 -06 144 fibre cable end preparation Per Cable End 9.057
section 9 -07 288 fibre cable end preparation Per Cable End 15.222
section 9 -08 432 fibre cable end preparation Per Cable End 18.838
Internal Locations
section 9 -09 24 fibre cable end preparation Per Cable End 4.571
section 9 -10 36 fibre cable end preparation Per Cable End 6.541
section 9 -11 48 fibre cable end preparation Per Cable End 5.644
section 9 -12 72 fibre cable end preparation Per Cable End 6.749
section 9 -13 96 fibre cable end preparation Per Cable End 7.850
section 9 -14 144 fibre cable end preparation Per Cable End 9.258
section 9 -15 288 fibre cable end preparation Per Cable End 14.282
section 9 -16 432 fibre cable end preparation Per Cable End 17.861
Section 10: Splicing and Related Items
Prepare and splice fibre with cable preparation
section 10 -01 External Locations ea 0.920
section 10 -02 Internal Locations ea 0.943
Prepare and splice fiber without cable preparation.
section 10 -03 External Locations ea 0.667
section 10 -04 Internal Locations ea 0.667
section 10 -05 Fit Splitter in FDH. ea 1.256
section 10 -06 Fit FDH Patch Panel with SC/APC Connectivity 2.317
Identify fault location within the network , formulate a per fiber fault
section 10 -07 repair strategy and communicate this solution to Oman
Broadband. 8.445
Fiber Dispersion testing and characterisation
section 10 -08 Set up and prepare testing location per location 36.472
section 10 -09 Conduct Chromatic dispersion test per fiber 6.367
section 10 -10 Conduct Polarisation Mode dispersion test. per fiber 6.877
Installation of Standard 19" Rack Optical Distribution Frame ea
section 10 -11
with all accessories 9.960
section 10 -12 Installation of ODF Termination Panel ea 19.679
section 10 -13 Install Patch Cord (all lengths) ea 0.224
section 10 -14 Installation of wall mounted box (24 fibres) ea 6.496
section 10 -15 Installation of wall mounted box (36 fibres) ea 8.553
section 10 -16 Installation of wall mounted box (48 fibres) ea 9.744
section 10 -17 Installation of wall mounted box (72 fibres) ea 12.186
section 10 -18 Installation of wall mounted box (96 fibres) ea 13.290
section 10 -19 Installation of wall mounted box (144 fibres) ea 22.736
Section 11: Customer Connection Activities
Survey customer building and create works package (SDU) per site
section 11 -01
12.769
Survey customer building and create works package (MDU per site
section 11 -02
2 – 8 Tenancies) 16.023
Survey customer building and create works package (MDU per site
section 11 -03
9-30 Tenancies) 18.080
Survey customer building and create works package (MDU per site
section 11 -04
31 tenancies and above) 20.787
section 11 -05 Power level testing at customer premises with OTDR. per test 3.132
section 11 -06 Installation and activation of ONT/WiFi Router per site 6.000
Regional Rate Variations
item Governate % Uplift in BOQ rates % Uplift in BOM Rates
1 Dhofar 7.82% 4.16%
2 Al Wusta 7.18% 3.84%
3 Ash Sharqiyah 6.36% 2.88%
4 Ad Dakhiliyah 6.13% 2.76%
5 Adh Dhahirah 6.82% 2.76%
6 Muscat 0.00% 0.00%
7 Al Batinah 4.78% 1.90%
8 Al Buraymi 7.13% 3.88%
9 Musandam 10.75% 6.85%