SCHEDULE GDS NONGSA JANUARI 2024 (W1) Notes : = Plan

VOLUME Jan 24 = On Progress


NO DESCRIPTION
QTY Unit 01/01 02/01 03/01 04/01 05/01 06/01 07/01 08/01 09/01 10/01 11/01 12/01 13/01 14/01 15/01 16/01 17/01 18/01 19/01 20/01 21/01 22/01 23/01 24/01 25/01 26/01 27/01 28/01 29/01 30/01 31/01 = Done

Construction Work for Underground


A
LV Cable
150mm diameter; pipework 6,995 M
- Area 1
Zone 1 71.82 M
Zone 2 86.70 M 24.18 62.52
Zone 3 86.48 M 86.48
Zone 4 67.70 M 67.70

Construction Work for Underground


B
ELV Cable
110 mm diameter; pipework 6,748 M
- Area 1
Zone 1 140 M 140
Zone 2 173 M 173.4
Zone 3 173 M 173
Zone 4 132 M 132.2

C Irrigation System
50 mm diameter; pipework
- Area 1
Zone 1 46.84 M 46.8
Zone 2 43.35 M 43.4
Zone 3 43.24 M 43.2
Zone 4 27.07 M 27.1

D Work Plan Underground (Area 2)


Zone 1
Zone 2
Zone 3
Zone 4

D Work Plan Underground (Area 3)


Zone 1
Zone 2
Zone 3
Zone 4

D Work Plan Underground (Area 4)


Zone 1
Zone 2
Zone 3
Zone 4

D Work Plan Underground (Area 5)


Zone 1
Zone 2
Zone 3
Zone 4

D Work Plan Underground (Area 6)


Zone 1
Zone 2
Zone 3
Zone 4

E MANPOWER
Manpower For Underground 5

F Equipment Plan On Site


Stamper Machine
Hand Grinding
Concrete Drill
Water Pump
Butt Fusion Welding Machine
Pipe Heater For PPR

G Plan Materials On Site


Upvc AW Pipes For Underground

Dibuat, Disetujui,

Alias Uto Purba


Project Manager
Ø50
IRRIGATION PIPE

LV-08
MHE3
TL: 25.295
IL: 22.884
Ø150 PIPES

Ø150 PIPES

ELV-08
UNDERGROUND FUEL TANK 100m3
(5.5M DEPTH) DETAIL TO STRUCTURAL
ENGINEER'S DETAIL.

DIESEL FUEL TRENCH 1M (H) X 1.2M (W) W/ CENTER DIVIDER


UNDERGROUND FUEL TANK 100m3
(5.5M DEPTH) DETAIL TO STRUCTURAL
ENGINEER'S DETAIL.
UNDERGROUND FUEL TANK 100m3
(5.5M DEPTH) DETAIL TO STRUCTURAL
ENGINEER'S DETAIL.
FUEL PUMP ROOM B-1

6
9.36 m2
+FFL 25.350
+ SL 25.175
HCSS -

LV-09
MHE3
TL: 25.000
IL: 22.440
AREA 3
FUEL PUMP ROOM B-2
9.36 m2
+FFL 25.350
+ SL 25.175
HCSS -

8
45000
LV-10 11 MHE3
TL: 25.000
IL: 22.440

ELV-10
LV-11
MHE3
TL: 24.950
IL: 22.440
14
10350
DRIVEWAY 8700 8400
ELV-11
LV-12
MHE2
TL: 25.0
IL: 22.4
8700 8400 8600 7137
LV-14
MHE2
TL: 25.0
IL: 22.4
7137
LV-15
MHE2

Ø150 PIPES

Ø150 PIPES
ELV-09 TL: 25.0
6m WIDTH MHEB2 ELV-13 IL: 22.4
MHE3 MHEB2 MHEB2
TL: 24.950
IL: 22.650
TL: 25.0
IL: 23.04
TL: 25.0
IL: 23.04 +RL 25.000 STAIRCASE 004 TL: 25.0
IL: 23.04 ELV RISER B MHEB2
FIBER ENTRY 003
TL: 25.0
ELV-14

11250 11250 11250 11250

2 2

59,26
FO-07 20 m2 7.7 m2 6.2 m2 IL: 23.04 MHEB2

1119,59
U-65
+ SL --.--

U-65
FO-08 FO-09 FO-10 TL: 25.0

TAHAP KE-2
ST 4 ELVR B FE 3

110
110

HDC - IL: 23.04

Ø110 PIPES

Ø110 PIPES
MHO4 MHO3 MHO2 MHO3 FO-13
FO-12
TL: 25.0 TL: 25.0 TL: 25.0 +FFL 25.775 TL: 25.0
+FFL 25.775 +FFL 25.775
IL: 22.0 3750 3750 3750
IL: 22.0 3750 3750 3750 3750 3750 3750 3750 3750
IL: 22.0 3750 TILES NV
IL: 22.0
EPX AC EPX -
MHO2
TL: 25.0
MHO1
TL: 25.0

1300
6 NOS 4 ROW Ø110 PIPES FOR FIBER OPTIC NETWORK
IL: 22.0 IL: 22.0

LV-16
MHE1
TL: 25.0
ELV-47 IL: 22.4
ELV-15
MHEB2
LV-08
P
MHEB2
TL: 25.0 TL: 25.0 TL: 25.0

75MMØSP IL: 23.04 RWDP IL: 23.2


IL: 23.04

MHC1 FIRE LIFT LOBBY SUMP


STAIRCASE 005 20 m2 RC APRON RWDP
TL: 25.0

BHI
ELV-08 20 m2
FLL 001 SUMP

U-65
IL: 21.4 -
DRIVEWAY ST 5
+FFL 25.775

TIXE
- m2 +FFL 25.475 +FFL 25.175
TILES NV
+FFL 25.000 METAL - HCSS -
75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
+ CL 25.000
HDC -
PRE-ACTION RISER BØ80 RISER EXIT
FE - CO2
CRAH 004 FE - CO2
Ø80 RISER EXIT

3.5 m2 F.A. RISER B (5KG) (5KG)


3.5 m2 Ø65 FCO 130 m2 FCO Ø65
PSV B AC 004
+FFL 25.775 Ø65 F.A.R. B
+FFL 25.775
EPX - ELEC RISER B
+FFL 25.775 Ø65 Ø65 Ø65 MDF B
EPX -
AS EPX AC FCO 62 m2

12850
12 m2
ELR B
FCO MDF B
+FFL 25.775
+FFL 25.775
HD EPX AC
EPX -

STAIRCASE 003
20 m2

8 7 6 5 4 3 2 1

EXIT
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

11300
MHC3
AREA 1
AREA 2
ST 3
TL: 25.0
IL: 21.4 +FFL 25.775
TILES NV
DATA HALL 002

Ø80 WITH 2% SLOPE


817 m2

01
FIBER ENTRY 004 M002
6.2 m2
+FFL 25.775
FE 4 MHE1
AS EPX AC TL: 25.0

Ø80 WITH 2% SLOPE


MHO3 +FFL 25.775
MHO3
RC APRON IL: 22.4
ELV-16
TL: 25.0 EPX TL: 25.0 - ELV SERVER ROOM - m2
LV-19 MHEB2
N IL: 22.0 IL: 22.0
50 m2 - TL: 25.0

02
LV-17

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


IL: 23.04
ELVSR +FFL 25.175 MHE2

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
TL: 25.0

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
+FFL 25.925 HCSS - IL: 22.4
RC PLINTH FOR GENSET & POWER MODULE RCARPET AC
1920 m2

BHI
-
+FFL 25.475

03
HDC - FCC / ROCC / ECC ELEC RISER D

EXIT
140 m2 3 m2
FCC/ROCC/ECC 001 ELR D
AC RISER B +FFL 25.925 +FFL 25.775
12 m2 RCARPET AC

04
TILES -
2 NOS 1 ROW Ø150 PIPES
A.C.R B
2 NOS 1 ROW Ø150 PIPES
FOR LV SYSTEM

LV-07 FOR LV SYSTEM


+FFL 25.775

37700

12000
MHE2 EPX -
TL: 25.295
IL: 22.884

9980
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES


FOR LV SYSTEM

FOR LV SYSTEM

ELV RISER C

05
6.35 m2
LANDSCAPE ELVR C
297 m2

STAFF CAR PARKING (14 NOS)


+FFL 25.775

AREA6
U-65
+FFL 25.175 EPX AC
+ SL 25.000
GRASS -

06
FO-14

MHO3
FE - CO2
FE - CO2 FE - CO2 FE - CO2 TL: 25.0
Ø110 PIPES

Ø110 PIPES

(5KG) (5KG) (5KG) (5KG) IL: 22.0


LV-07
K
110

110

07
ELV-07
CRAH 003

DATA CENTRE-2
MHEB2
TL: 24.950 130 m2
IL: 22.650 75MMØSP
Ø65 AC 003 Ø65 LIFT LOBBY A
Ø65 +FFL 25.775 Ø65 37 m2
110

110
Ø110 PIPES

Ø110 PIPES

Ø65 FCO AS EPX AC LL A VISITOR EXHIBITION ROOM


FCO

08
Ø65 +FFL 25.775 41 m2
Ø80 MDF
RISER
C Ø80 RISER TILES AC -
27 m2 CORRIDOR
MDF C
FCO 380 m2
+FFL 25.775
CP AC
FCO

51600
9042
EXIT
EXIT

TIXE
+FFL 25.775 -
EPX -

09
+FFL 25.775
EPX AC
FCO FCO FCO
TL : 23.720

12850
MHO4
TL: 25.0
Ø80 RISER CRAH 002 Ø80 RISER
IL : 23.520 IL: 22.0 Ø65 130 m2 FCO Ø65

10
FO-06 AC 002
MV-14 METAL

Ø65 Ø65 +FFL 25.775 DETECTOR

AS EPX AC

SECURITY
CHECK
MHC1
TL: 25.0 STAIRCASE 005 SECURITY
CONTROL
IL: 21.4
20 m2 PANEL

ST1 FE - CO2

11
FE - CO2 FE - CO2
(5KG)

U-65
+FFL 25.475 (5KG) (5KG)
METAL -

ELECTRIC ELECTRIC ELECTRIC


CHARGER CHARGER CHARGER
PARKING PARKING PARKING
FUTURE
ELEC RISER A Ø50

LOT
12 m2 BHI ELV-46
UNDERGROUND ELV-17

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C ELR A MHEB2 MHEB2
FT

FEMALE TOILET TL: 25.0 TL: 25.0


SEWAGE PIPE Ø100 &

12
+FFL 25.775 IL: 23.04 IL: 23.04
13 m2
EPX - ENTRANCE RAMP
H

Ø80 WITH 2% SLOPE


DISABLE TOILET FT 001 26.8 m2
ELV-18 LV-18

Ø150 FROM DC2


FT

FUTURE
MHEB2
G 4 m2 +FFL 25.725 - TL: 25.0
MHE1
TL: 25.0

LOT
IL: 23.04

9980
EXIT EXIT DT 001 TILES MV IL: 22.4
EXIT FT +FFL 25.775
+FFL 25.725 LV-19
HCSS -
MAKE UP WATER PUMP RM B

13
TILES AC MHE3
TL: 25.0

UNDERGROUND BLOWDOWNMAKE UP WATER PUMP RM A


19 m2 FT
IL: 22.4
4375

19 m2 MUWP B
2000 X 2000 RC TRENCH W

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

FUTURE
TIXE
PIPE 2X Ø200 MUWP A +FFL 25.475 -
SEW-C.T-01

HOT AISLE CONTAINMENT (WIDTH:1.5M)

LOT
EPX
+FFL 25.475 EPX MV

U-65
+FFL 25.775
CLIMBER EPX MV
FT

S.P.R B
MEETING ROOM B

14
RC FLOOR SLAB I.C. SEW-I.C-04 0.6 m2
7.5 m2
I.C.
F

Ø80 WITH 2% SLOPE


MTGR B
20 m2 SAN. RISER B

SEW-I.C-05
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

+FFL 25.775
FOR LV SYSTEM

FOR LV SYSTEM

LV-06
- FT

CP AC
MHE2 +FFL 25.475
TL: 25.295
HDC -
IL: 22.884
PRE-ACTION RISER A
20KV MODULE

20KV MODULE
Ø110 PIPES

Ø110 PIPES

BHI
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

FT

3.6 m2 SAN. RISER A


DATA HALL 001
FOR LV SYSTEM

FOR LV SYSTEM

4662
110

110

ELV-06
MHEB2 MAKE UP WATER TANK A MAKE UP WATER TANK B RECEIVING OFFICE PSV A 817 m2 2.5 m2
TL: 24.950 212 m2 148 m2 +FFL 25.775 M001 S.P.R A FT

212 m2

EXIT
IL: 22.650 EPX -
MUW B MUW B +FFL 25.775 +FFL 25.775
MUW A
MEETING ROOM A
+FFL 25.475 +FFL 25.775 AS EPX AC EPX -
CONCRETE SEWAGE

8 7 6 5 4 3 2 1
+FFL 25.475

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8
110

110

FT
Ø110 PIPES

Ø110 PIPES

HCSS AC 7.5 m2

D
HCSS - HCSS -
PPR PIPE PN16 Ø80mm MTGR A

RISER TO ROOF TANK +FFL 25.775


19789

AC RISER A CP AC
12 m2 RWDP
A.C.R. A SUMP

11300
LIFT LOBBY B ELEC RISER C (SOLAR)

U-65
+FFL 25.775

BHI
HYDRANT RISER A
5000

LV-06
102 m2 EPX - 3 m2 TL: 25.0

EXIT
3.6 m2

TIXE
LL B ELR C
+FFL 25.775
HR A
+FFL 25.775 FO-15
IL: 23.2
+FFL 25.775
HCSS MV FIBER ENTRY 001 EPX - MHO3
ELV-06 EPX - 6.2 m2 TL: 25.0
IL: 22.0
RWDP
FE 1
SUMP
C

AREA 4
+FFL 25.775
EPX -
MV-XX 75MMØSP
Ø65 CRAH 001
2NOS. 3ROW Ø200 FOR 20KV POWER FCO 130 m2 Ø65 FCO
MHC3 Ø65
TL: 25.0
IL: 21.4 RC APRON Ø65 AC 001
+FFL 25.775 ELV-19
- m2
Ø65 FE - CO2 Ø65 FCO AS EPX AC FCO Ø65
FE - CO2 MHEB2
MHE3
-
Ø80 RISER Ø80 RISER
5752

(5KG) TL: 25.0


(5KG)
TRANSFORMER ROOM RC PLINTH ELECTRICAL ROOM +FFL 25.775
EXIT IL:23.04
IL: 22.8
LV-20
228 m2 HCSS - 75MMØSP
40 m2 55 m2 75MMØSP 75MMØSP 75MMØSP 75MMØSP75MMØSP
LANDSCAPE FO-32 75MMØSP MHE3
- FIBER ENTRY 002 TL: 25.0 TL: 25.0

FLOO
ELV RISER A

ROOMNA
53 m2 - - IL: 22.4
+FFL 25.275 MHO3
6.2 m2
RC PLINTH +FFL 25.275 TL: 25.0 7.7 m2
IL: 23.2

ROO
+FFL 25.275
+FFL 25.475
WATER METER 2

AREA
RFINISH
HDC - IL: 22.0

300
228 m2 HDC - HDC - ELVR A FE 2

U-65 2

FFL
+ SL 25.000

MNO
TURF - +FFL 25.775 +FFL 25.775
-

ME
A EPX AC EPX - RWDP

VENT
+FFL 25.275
800

HDC - SUMP
A1 5802 5802 4996 6004 5500 5500 6596 3450 9550
BUFFER TANK BUFFER TANK BUFFER TANK BUFFER TANK RC APRON ELV-37
3.6dia (170tonne) 3.6dia (170tonne) 3.6dia (170tonne) 3.6dia (170tonne) - m2 MHEB1
MHEB2
TL:
TL: 25.0
25.0
22.8
IL: 23.04
-
LOADING / UNLOADING BAYS +FFL 25.175 ELV-45
1 3 4 5 7 9 10 12 13 -
15 HCSS -
MHEB2
FE 1

Ø200mm
TL: 25.0

X 2 ROW
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C +FFL 25.000

W.E.F.
IL: 23.04

PVC PIPE
3 NOS
HDC -
MV-08
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C
MV-09

MHC1
TL: 24.94
U-65 MHC1
TL: 25.0
U-65

MAX POWER
OUTGOING
IL: 21.4 IL: 21.40

MAX POWER
RC PLINTH FOR BUFFER TANK

INCOMING
FO-05
FO-30 FO-31 115 m2 FO-34 FO-16 SC
1 3 4 5 7 9 10 12 13 15 16 17 18 19 20 21 22 23
MHO2 MHO3 MHO1 - MHO1 MHO2

WATER METER 1

ISH VENT
120625

TIE BREAKER
TL: 25.0 TL: 25.0 TL: 25.0 TL: 25.0 TL: 25.0

AME
SECTAG
+FFL 25.475

ROOMNO
IL: 22.0 IL: 22.0 IL: 22.0 IL: 22.0 IL: 22.0 ROOMNAME

SECTAG
FFL
AREA

FLOORFIN
ROOMN
HDC -
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

UNDERGROUND Ø150 SPRINKLER AREA


FOR LV SYSTEM

FOR LV SYSTEM

LV-40 LV-38
LV-05
MHE3
5802 5802 MHE2
4996 6004 5500 5500 LV-39
6596MHE3 3450 9550 10350 8700 8400 MHE2
8700 8400 8600 7137 7137 LV-21 ROOMNO

BLOWDOWN PIPE 2X Ø200 TL: 25.295 TL: 25.0 TL: 25.0 TL: 25.0 MHE3 FFL

INCOMING
IL: 22.884 IL: 22.4 IL: 22.4 TL: 25.0
IL: 22.4
IL: 22.4 FLOORFINISH VENT

U-65 EXTERNAL UNDERGROUND


MV-04

PLN
DRIVEWAY
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

12157,36
MV-05 MV-06 MV-07
FOR LV SYSTEM

FOR LV SYSTEM

6m WIDTH

G
OUTGOIN
MHC1 MHC3 MHC3 MHC3

SEWAGE PIPE

PLN
TL: 25.0 TL: 25.0 +RL 25.000 TL: 25.0 TL: 25.0
IL: 21.4 IL: 21.4 IL: 21.4 IL: 21.4
MV-10 + SL --.--
RC PLINTH FOR BUFFER TANK DRIVEWAY
HDC - 6m WIDTH
MHC2 115 m2
TL: 25.0 +RL 25.000
IL: 21.4 -

W.E.F.
+ SL --.--
+FFL 25.475
HDC -
HDC -

U-65 1 ELV-38
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

ELV-36 LV-22 LV-23


ELV-05 ELV-34 ELV-35
FOR LV SYSTEM

FOR LV SYSTEM

U-65
MHE3 MHE2
MHEB2 MHEB2 TL: 25.0 TL: 25.0
MHEB2 Ø110 PIPES MHEB2 MHEB2 IL: 22.4 IL: 22.4
110

TL: 24.950 Ø110 PIPES TL: 25.0 TL: 25.0


LV-05 TL: 25.0
110

TL: 25.0
Ø110 PIPES IL: 23.04 IL: 23.04 ELV-20
DRIVEWAY
110

IL: 22.650 IL: 23.04 IL: 23.04


MHEB2
6m WIDTH
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

TL: 25.0
FOR LV SYSTEM

FOR LV SYSTEM

650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C 650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C IL: 23.04
+RL 25.000
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C + SL --.--
RC APRON HDC -
LOADING / UNLOADING BAYS KERB RAMP
- -
Ø200 SPRINKLER
1:12
I.C.
SEW-I.C-03
FE 1 +FFL 25.175
MV-03
BUFFER TANK BUFFER TANK BUFFER TANK BUFFER TANK HCSS -
+FFL 25.000 ELV RISER A FIBER ENTRY 002
MHC3
P1 HDC - 3.6dia (170tonne) 3.6dia (170tonne) 3.6dia (170tonne) 3.6dia (170tonne) UNDERGROUND RWDP PIPE REFER TO STRUCTURAL ENGINEER DESIGN & SPECIFICATION 7.7 m2 6.2 m2
800

TL: 25.0
RC APRON
IL: 21.4

P T 1:
12 2425 ELVR A
+FFL 25.775
FE 2
+FFL 25.775
3 NOS 3 ROW Ø200 FOR 20KV POWER

SC MV-10 RC PLINTH DIEN FO-33 - EPX AC EPX -


CK
LV-24
MHC2
TL: 25.0 2NOS. 3ROW Ø200 FOR 20KV POWER 228 m2 DO LLER
CK
DO LLER GRA +FFL 25.175
MHO3 MHE3
IL: 21.4 TL: 25.0
TL: 25.0
LEVE LEVE
- HCSS - IL: 22.4
TL : 23.240 IL: 22.0
3 RISERS
ELV-21

U-65
ENTRANCE 01 +FFL 25.275 75MMØSP 75MMØSP
75MMØSP 75MMØSP
75MMØSP 75MMØSP
75MMØSP
T: 250MM
R: 175MM
MHE3
TL: 25.0
RC APRON
IL : 23.140 10m WIDTH HDC -
FO-17
IL: 23.04 FO-18
5752

1
- m2
+RL 25.000
- Ø80 RISER FE - CO2
FE - CO2 Ø80 RISER
EXIT
MHO2 O MHO1 NEW ROAD OPENING TO ACCESS EXTERNAL MEP ROOM
+ SL --.--
HDC -
TL : 23.660 MV-XX
+FFL 25.775
Ø65 (5KG)
Ø65 FCO CRAH 001 FCO (5KG) Ø65 MDF A
62 m2
TL: 25.0
IL: 22.0
TL: 25.0
IL: 22.0 10m WIDTH
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

MHC3
130 m2
+RL 27.700
FOR LV SYSTEM

FOR LV SYSTEM

LV-04
MHE2
IL : 23.460 TL: 25.0
IL: 21.4
HCSS -
Ø65 AC 001
Ø65
MDF A
+ SL --.--

U-65
TL: 25.295
FIBER ENTRY 001FCO Ø65
+FFL 25.775 Ø65 FCO
+FFL 25.775 HDC -

6278,37
IL: 22.884 75MMØSP
75MMØSP EPX AC
AS EPX AC
6.2 m2
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

N
FOR LV SYSTEM

FOR LV SYSTEM

FE 1
+FFL 25.775
STAIRCASE 002 Ø200 SPRINKLER
24 m2
LIFT LOBBY B HYDRANT RISER A EPX -
3.6 m2
ST 2 ELEC RISER C (SOLAR)
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C

102 m2

8 7 6 5 4 3 2 1
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8
+FFL 25.775 3 m2
TL : 23.510 HR A
EXIT

LL B TILES NV ELV-22
ELR C

EXIT
TAHAP KE-3

19624,89
5000

LANDSCAPE +FFL 25.775


+FFL 25.775
AC RISER A MHE1 MHE3

11300
+FFL 25.775 TL: 25.0 TL: 25.0

IL : 23.310 63 m2 EPX -

IHB
HCSS MV 12 m2 EPX -
IL: 23.04 IL: 23.04
+FFL 25.175 A.C.R. A MEETING ROOM A
+SL 25.000 +FFL 25.775 7.5 m2
GRASS - EPX -
PPR PIPE PN16 Ø80 mm

40
MTGR A
22989

+FFL 25.775
M Ø150 SPRINKLER RISER TO ROOF TANK

Ø80 WITH 2% SLOPE


CP AC
MAKE UP WATER TANK A MAKE UP WATER TANK B RECEIVING OFFICE PRE-ACTION RISER A DATA HALL 001 SAN. RISER A
UNDERGROUND BLOWDOWN
FT
Ø110 PIPES

Ø110 PIPES

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


212 m2 212 m2 148 m2 2.5 m2
3.6 m2 817 m2
3605

EXIT

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
110

110

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
MUW A MUW B MUW B S.P.R A MALE TOILET
UNDERGROUND

39
PIPE 4 X Ø200 ELV-04
+FFL 25.475 +FFL 25.475 +FFL 25.775 SL01-1
PSV A M001
+FFL 25.775
FT

19 m2
HIDDEN LINE
INDICATE
4662

MHE2 +FFL 25.775 +FFL 25.775 GLASS


TL: 22.07 HCSS - HCSS - HCSS AC CANOPY
IL: 21.587 EPX - AS EPX AC EPX - MT 001 4 RISERS ABOVE

BLOWDOWN PIPE 2X Ø200 T: 250MM

U-80

IHB
FT
R: 150MM
+FFL 25.775

L
110

110
Ø110 PIPES

Ø110 PIPES

TILES MV MEETING ROOM B


F.A. RISER A
3.5 m2 7.5 m2
SEW-I.C-02

38
FT

F.A.R. A MTGR B ENTRANCE 02

U-65
SAN. RISER B
K +FFL 25.525
I.C. +FFL 25.775
I.C.
HDPE PE100 PN16 SDR11 10m WIDTH

Ø80 WITH 2% SLOPE


0.6 m2
EPX - CP AC +RL 25.000

U-65
S.P.R B
MAKE UP WATER PUMP RM A
FT

SEW-I.C-01 +FFL 25.775 Ø100MM X 2 + SL --.--


HDC -
19 m2 MAKE UP WATER PUMP RM B EPX -

37
EXIT
STAIRCASE 001 SL01-2
4375

19 m2
MUWP A 20 m2 ENTRANCE RAMP

U-65
MUWP B DISABLE TOILET
+FFL 25.475 26.8 m2
ST 1 FT

EPX MV +FFL 25.475 4 m2


EPX MV +FFL 25.475 -
DT 001 FEMALE TOILET

9980
EXIT EXIT
METAL - EXIT FT
+FFL 25.775
+FFL 25.775 13 m2
UNDERGROUND HCSS -

36
J1 ELEC RISER A
TILES AC
FT
FT 001
UNDERGROUND
2 RISERS (RC)
12 m2 +FFL 25.775
1720

650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C


T: 250MM
R: 150MM
ELR A
TILES MV SEWAGE PIPE Ø100 &
WAITING AREA/ RECEPTION SEWAGE PIPE Ø100 &
+FFL 25.775
FT
100 m2
J Ø150FROM DC1
680

EPX -

H 2 RISERS (RC)
T: 250MM
2 RISERS (RC)
T: 250MM
IHB

+FFL 25.775
-
RAMP Ø150 FROM VC
R: 150MM R: 150MM TILES AC GRADIENT
FE - CO2 FE - CO2 FE - CO2
1:12
(5KG) (5KG) (5KG) BUILT IN LOCKERS BY OTHERS
SECURITY
G

SECURITY
CONTROL
DRIVEWAY

CHECK
PANEL
FO-04
MV-11
6m WIDTH CRAH 002 ELV-23
MHO3
TL: 23.40 +RL 25.000 Ø65 Ø65 130 m2
METAL
MHE2
MHC1 DETECTOR TL: 24.7

POWER MODULE
IL: 22.0 AC 002 ELV-39 IL: 24.0

GENSET
+ SL --.-- TL: 25.0 ELV-40
LIFT A ELV-41 LV-26 LV-25
HDC -
IL: 21.4 +FFL 25.775
FCO Ø65 (EVACUATION MHEB2
Ø65 AS EPX AC LIFT )
MHEB2
TL: 25.0 TL: 25.0
MHEB2
TL: 25.0
MHE1
TL: 25.0
MHE3
TL: 24.5
Ø80 RISER Ø80 RISER IL: 23.04 IL: 23.04 IL: 23.04 IL: 22.4 IL: 23.8

FCO FCO CORRIDOR FCO


MDF C 380 m2
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

27 m2
FOR LV SYSTEM

FOR LV SYSTEM

12850

51600
-

9042
14 M SETB
LV-03
MDF C
EXIT

EXIT
MHE2 +FFL 25.775
TL: 23.809 +FFL 25.775
EPX AC
FCO LIFT LOBBY A
EXIT

IL: 22.0
EPX - FCO HIDDEN LINE
Ø110 PIPES

Ø110 PIPES

FIRE SPRINKLER

DATA CENTRE-1
37 m2 INDICATE GLASS

HDPE VISITOR
PE100 PN16 ROOMSDR11
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

CANOPY ABOVE

ACK
FOR LV SYSTEM

FOR LV SYSTEM

Ø80 RISER Ø80 RISERLL A EXHIBITION WATER PUMP ROOM


110

110

FO-19 REFER TO DWG


ELV-03 10330442-FP-SD-500

Ø65 CRAH 003 FCO Ø65 41 m2 56 m2


MHE2
TL: 22.07
FCO 130 m2
+FFL 25.775
TILES AC Ø100MM -
MHO3
TL: 25.0 FSWP
IL: 21.587
Ø65 AC 003 Ø65 +FFL 25.775
IL: 22.0
+FFL 21.975

GENSET POWER MODULE Ø65 +FFL 25.775 Ø65 CP AC EPX MV


110

110
Ø110 PIPES

Ø110 PIPES

AS EPX AC

9000
SEW-I.C-08 F
2597,75

FE - CO2 FE - CO2 FE - CO2


FE - CO2
(5KG) (5KG) (5KG)
(5KG)

E KERB RAMP
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C

24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9
1:12 I.C. MDD02
RC APRON ELV RISER C
- m2 6.35 m2
- ELVR C
Ø80mm

HEAVY DUTY uPVC


FCC CONTROL PANEL BOARD
+FFL 25.175 +FFL 25.775
HCSS - EPX AC

GENSET POWER MODULE

9980
MV-02
AC RISER B
HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)

HOT AISLE CONTAINMENT (WIDTH:1.5M)


MHC3 12 m2
TL: 22.7

HOT AISLE CONTAINMENT (WIDTH:1.5M)


IL: 21.4 A.C.R B
+FFL 25.775
EPX - FCC / ROCC / ECC ELEC RISER D
FIRE SPRINKLER FIRE SPRINKLER
37700

12000

RC PLINTH FOR GENSET & POWER MODULE 140 m2 3 m2


Ø50 1920 m2 FCC/ROCC/ECC 001 ELR D
WATER TANK A
160 m2 X 3.3m HT
WATER TANK B
160 m2 X 3.3m HT
Ø80 WITH 2% SLOPE

9000
EXIT
AREA 5
- +FFL 25.925 +FFL 25.775 FSW A FSW B
IRRIGATION PIPE +FFL 25.475
HDC -
RCARPET AC TILES -
+FFL 21.975
HCSS -
+FFL 21.975
HCSS -

U-65
4 RISERS
T: 250MM
D

IHB
Ø80 WITH 2% SLOPE
R: 150 MM

GENSET POWER MODULE ELV SERVER ROOM


50 m2
ELV-24
MHE2
TL: 22.8
ELVSR LV-37 IL: 22.1
LV-27
+FFL 25.925 MHE3
1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

8 7 6 5 4 3 2 1
FIBER ENTRY 004 RCARPET AC RC APRON TL: 25.0
IL: 22.4
MHE2
TL: 22.6
- m2 IL: 21.9
6.2 m2
MHO3 MHO3
DATA HALL 002 -
FE 4 817 m2

U-65
TL: 25.0 TL: 25.0
+FFL 25.175

36800
IL: 21.8 IL: 21.8
+FFL 25.775
C EPX -
+FFL 25.775
M002
STAIRCASE 003 HCSS -
24 m2
AS EPX AC
ST 3
+FFL 25.775

11300
TILES NV

EXIT
DOMESTIC WATER &
Ø110 PIPES

Ø110 PIPES

GENSET POWER MODULE WATER FEATURE PUMP ROOM


25.5 m2
110

110

ELV-02
ELEC RISER B MDF B

9000
MHE2 -
TL: 22.07 12 m2 62 m2 MDD02 +FFL 21.975

13728,23
IL: 21.587
ELR B MDF B EPX MV
FCO CORRIDOR

1 +FFL 25.775 F.A. RISER B +FFL 25.775


110

110
Ø110 PIPES

Ø110 PIPES

PRE-ACTION RISER B EPX - 3.5 m2


CRAH 004 FCO HD EPX AC
90 m2

FO-03 3.5 m2 Ø65 130 m2 Ø65 Ø65 - DOMESTIC TREATED DOMESTIC RAW
PSV B Ø65
F.A.R. B
AC 004 +FFL 21.975 WATER TANK WATER TANK
12850

+FFL 25.775
+FFL 25.775
EPX -
Ø65 FCO +FFL 25.775
FCO Ø65 EPX - 13 m3 13 m3

EPX - FE - CO2 AS EPX AC DTWT DRWT


2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

FE - CO2
Ø80 RISER Ø80 RISER
FOR LV SYSTEM

FOR LV SYSTEM

LV-02 EXIT (5KG) (5KG) EXIT MDD02 +FFL 21.975 +FFL 21.975
MHE2 HCSS - HCSS - B
TL: 22.22 3 RISERS 75MMØSP 75MMØSP 75MMØSP 75MMØSP 75MMØSP
IL:21.00 T: 250MM
R: 175MM

POWER MODULE
EXIT
2 NOS 1 ROW Ø150 PIPES

2 NOS 1 ROW Ø150 PIPES

FIRE LIFT LOBBY


GENSET
3 RISERS
FOR LV SYSTEM

FOR LV SYSTEM

31399,57

T: 250MM
FIRE 12 m2 R: 175MM
FO-20 FO-22
LIFT
FLL 001 RWDP
WATER FEATURE
IHB

MHO2 MHO4
+FFL 25.775 SUMP TL: 25.0
IL: 22.0
TL: 21.875
IL: 19.9 71 m2
ELV-25
TILES NV MHE2
STAIRCASE 005 75MMØSP +IL 21.350 TL: 21.8
IL: 21.1
20 m2 RC APRON FIBER ENTRY 003 +WL 21.70
- m2 6.2 m2 TL: 25.0

U-65
ST 5 HCSS -
STAIRCASE 004 - FE 3 IL: 23.2 ELV-42
+FFL 25.475 RC APRON 20 m2
+FFL 25.175
ELV-44 ELV-43
+FFL 25.775
METAL - - m2
A ST 4 MHEB2
HCSSTL: 25.0 -
MHEB2
EPX - MHEB2 BASEMENT ENTRANCE

9800
TL: 25.0 TL: 25.0 LV-28
- IL: 23.04 IL: 23.04 26.1 m2
+FFL 25.775 KERB RAMP IL: 23.04 MHE2
+FFL 25.175 TILES NV - TL: 21.8
1:12 IL: 21.1
405

HCSS - +FFL 21.875


EPX -
650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C 650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C FO-21

FO-03 650MM WIDTH RC BOX DRAIN WITH HEAVY DUTY GRATING AT 6M C-C MHO4
ELV RISER B MHO2
TL: 25.0

U-65
IL: 22.0 LV-36

(CLEAR WIDTH)
MHO2 MHO3 MHO2 MHO3 7.7 m2 TL: 25.0
MHE1 ENTRANCE 02-DRIVEWAY

1060
900
TL: 22.0 TL: 25.0 TL: 25.0 TL: 25.0 IL: 22.0
IL: 19.1 IL: 22.0 IL: 22.0 IL: 22.0 ELVR B TL: 25.0
LV-35 IL: 22.4
7.4M WIDTH
FO-27 FO-26 FO-25
FO-28 +FFL 25.775
17785,81

MHE3 +RL 21.775


LV-32

MHEB1
TL: 25.0
3750
LV-33
MHE3
TL: 25.0
3750 3750 3750 3750 3750 3750 Ø40
3750 SPRINKLER
3750 3750 3750 3750
LV-34
MHE4
TL: 25.0
TL: 25.0
IL: 22.4
EPX AC
+ SL --.--
HDC -

1
IL: 22.4
IL: 22.4 IL: 22.4 ELV-30 ELV-29 AS02
ELV-32 ELV-31
MHE2
MHEB1
TL: 25.0
MHE3
TL: 25.0
11250 11250 11250 11250 TL: 25.0
IL: 23.04
MHEB3
TL: 25.0
IL: 23.04 IL: 23.04

U-65
IL: 23.04
ROOMNAME
AREA
45000 ELV-28
MHE2
ROOMNO 6300 5100

ENTRANCE 01 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17
TL: 25.0
IL: 23.04 16 15
FFL
FLOORFINISH VENT Ø40 SPRINKLER FO-23
7.4m WIDTH
+RL 22.075
ELV-33 LV-31
2 DIESEL6FUEL TRENCH 1M (H) X 1.2M
8 (W) W/ CENTER DIVIDER 11 14 SEPTIC ENTRANCE 02 MHO3
TL: 20.8
11400
MHE2 7.4m WIDTH
+ SL --.--
MHE2
TL: 22.07 TL: 22.07
IL: 20.20 FUTURE FUTURE FUTURE PL TANK 1.2 M3 +RL 20.075
IL: 19.9

HDC -
IL: 21.270
HDPE PE100 PNELECTRIC
16 ELECTRIC ELECTRIC + SL --.--
MV-01 HDC -
MHC2
FFL = +22.175 SDR 11 Ø40 mmCHARGER CHARGER CHARGER ELV-27 ELV-26

U-65
PARKING PARKING PARKING
Ø100 PIPES
Ø100 PIPES

TL: 22.07 MHE2


IL: 18.90 OUTGOING INCOMING INCOMING OUTGOING MHE2
TL: 21.8
PLN +21.550 BOTTOM OF TRANCH
PLN CABLE +21.550
TIE BREAKER MAX POWER MAX POWER
LOT LOT LOT ROOMNAME TL: 20.1
2 NOS 1 ROW Ø150 PIPES

ROOMNAME IL: 21.1 LV-29


Ø150 PIPES
FOR LV SYSTEM

MHE1 IL: 19.4 LV-30


TL: 22.07 Ø100 PIPES AREA MHE1
UNDERGROUND BLOWDOWN Ø100 PIPES
AREA

UNDERGROUND SANITARY
IL: 21.587 MHE2 TL: 21.8
MHE1
ROOMNO TL: 20.1 IL: 21.1
TL: 22.22 Ø150 PIPES ROOMNO IL: 19.4

U-80
FFL DOORTAG DOORTAG

PIPE 4 X Ø200 IL: 21.00 Ø150 PIPES


FFL
FLOORFINISH VENT
FLOORFINISH VENT

PIPE REFER TO DRAWING


FO-02

TL : 20.500
MHO3
TL: 22.0
IL: 19.1
FFL = +22.175
SEW-C.T-02
FO-24

NO. 10330442-SEW-GH-300
DOORTAG
MHO1

IL : 20.300 TL: 20.075


IL: 19.9 PL

I.C. I.C.

FO-01

MHO1
TL: 22.0
IL: 19.1
SUBSTATION A
18 m2 FUEL PUMP ROOM A-2
SEPTIC TANK S/S A 9.36 m2
+FFL 23.05 +FFL 25.350
1.2 M3 HD EPX MV FUEL PUMP ROOM A-1
9.36 m2
+ SL 25.175

DATA CENTRE 1 - SUPER IMPOSED SITE PLAN


HCSS -
+FFL 25.350
+ SL 25.175
HCSS -

UNDERGROUND SANITARY
PIPE REFER TO DRAWING SCALE 1:250
NO. 10330442-SEW-GH-300 MV-15

TAHAP KE-1
MV-16
MV-17
MV-18
MV-19
MV-20

You might also like