Professional Documents
Culture Documents
TRUE NORTH
C14 / FA TIE-IN LOCATION LP CONDENSATE TIE-IN LOCATION
(C14 / FA Transfer from TK-805A/B (From Sunshine Project)
Via Pump P-805A/B To Sunshine TF) Bu Dewi Info : To Existing HW Tank TK-1207 HOT WATER RETURN TIE-IN LOCATION
LOCATION OF TP-PR05 TP-UT02
For Tank T-818 & T-819 Heating Coil (At TF 3 FA)
5m
8.7m
8.7m
10.7m
61.6m
GATE B GATE A
4.7m
33.7m
TRUCK ENTRY MAIN ENTRY
5254
8.4m
10.2m
17000
20000
LANDSCAPE AREA
7M INTERNAL RING ROAD 7M INTERNAL RING ROAD TRUCK ENTRY
20000
15m
16.5m 24m 8.7m
PERTAGAS HOUSE 5m
11.4m
GUARD 1'
EX MU
4.5m
0.6m 0.3m X=538920.164
PA SO 41.9m 2m
D
EXIT ENTRY Y=346720.075
18m
ENTRY ENTRY
1
POWER POWER
DISTRIBUTION BOX
DISTRIBUTION BOX MATERIAL D'
METERING NS LA
12000
RECEIVING PRAYER ROOM
DESK PANTRY 2.2M X 2.0M REST ROOM X=538921.327
2
3m 4.8m
2.8M X 2.0M 3.4M X 3.25M Y=346721.715
1.5m
2.3M X 2.1M
C
11m 5.5m
X=538915.686
7m
DISTRIBUTION BOX
PASSAGE 1.4M WIDE Y=346720.118
+48.150M
C'
3
1m 1.8m
FFL
STORAGE CABIN
MEH
N
6m
+48.150M +48.6 RAB
3.2m
SECURITY OFFICE FFL 00M
FFL
17000 12183 4.0 X 3.0 M W.C W.C X=538928.753
HEIGRAIL
VISITOR'S LOUNGE
HT
ENTRY +48.14M
4.2m
B
+48.150M
Y=346716.230
M D
3.4M x 4.5M FFL
300M HAN
FFL
7.2m 7.2m
4
TOILET
B'
S.S.
16200
3.8m
3.40M X 3.25M PLINTH
138m
TAIN
LANE 5 PROTECTION
CUR
LANE 4 A
+48.150M
X=538915.955
2200
UP
Mini open drain Concrete Bundwall +48.150M +47.700M FFL
5
ENTRY
FFL FGL A' Y = 346715.254
20cm thk
40m
SEA
FOR TING ABL
8800 50 UTIO
2.4m
5000
3100
2.4m
PEOCAP
FIRE CABIN FIRE CABIN +48.1x 1000 N(w
X36
PLEACIT +48.1 ome
50M 0 00 FD
Y
FFL
FFL n)
X=538934.404
7m
PANTRY X=538914.489
40M
GUARD
VISITOR'S LOUNGE PLIN
6
PRO
Y = 346713.879 Y=346711.299
Ruang Makan
+48.150M TH
famale
Bed room
FD
DRUMS 1200
TEC
FFL
0.0000
A
EMERGENCY CONTROL ROOM TION
1.2m
1.2m
Office
+48.150M
FFL
1
ENT
+48.1 GAL
1 2 3 4 5 6 2.50 X 1.50 7700 RAN
X43 CE
FFL 40M SHO
(wom E
ACC VAN
ESS IZED
X=538916.278 +48.1
FFL 50M 00
150
0X3 en)
RAC
K LAD STE
600
12.5m
Y=346712.583
CAR PARKING
DER EL
STORAGE
33m
Male
Bed room
LOCKERS
1
1 CHANGE 1.40X1.50
HOUSE
ROOM CCTV & FIRE PANEL
1.00 X 1.50
OP
2
12800
12000
2w 2v 2u 2n 2w 2v 2u 2n
Toilet
Toilet
C.L Tank C.L Tank
Toilet
1W 1V 1U 1W 1V 1U
(60 nos.)
TRAFO 2.0 MVA TRAFO 2.0 MVA
B3 SCREEN
(30 nos.)
(SUNSHINE) (FUTURE) 3 ABL
100
DOMESTIC UTIO STE
27m
KER MM
TRAFO AREA
9000
DOCTOR'S CABIN +48.1 N(m T
BRIC
P B THIC
FFL
40M en) R = 300K IN WAL
= WO
L K
TRASH BIN 4
150
X=538932.036
STORAGE
RK
ENT
INDUCTION ROOM (30NOs) WAITING AREA RAIS +48.1 RY
Y=346708.588
ENTRY +48.150M ED FFL 40M
DRA PLA
FFL TFOSEA
X=538920.929 IN
OP
LV PANEL 5 1200.0000
+47.850M
+48.150M POLY CLINIC TRO
UGH
RM T
FFL +48.150M Y=346707.264
SLOPE
BUILDING
FPL
FD
3000 3600 3000 3600 3000 FFL SHO
150 (meE RAC
+47.7
FGL
18m
X=538928.960
SLOPE
FD 00M
0X3 n)
K
600
Y=346705.035
15.5m
KER MM
WEIGHBRIDGE 1
B THIC
WA K
LL
MH
3600
IN
3530
3m 4m 3m
OUT
X=538926.579
CONTROL MV PANEL
BOX Y=346702.334
PROPOSED NEW
ROAD-J 4M WIDE ROAD 3m
BETAINE HPKO TIE-IN LOCATION
WW DISCHARGE POINT
(10m x30m)
PROPOSED ISBL MCC PANEL
MARVEL 2
1 2 3 4
SUNSHINE MCC ROOM
SLOPE 1:8
SLOPE 1:8
RAMP UP
RAMP UP
(Transfer from Sunshine TF to Dove Plant)
PROPOSED OSBL MCC PANEL
UP UP +47.70M
CHEMICAL
FGL
4m
TOILET
TOILET +48.050M
7m
ROAD-G
LABORATORY
WAREHOUSE MARVEL 2
FFL
W.C
ROOM
+48.050M
FFL
6M WIDE ROAD
R1
6.00M WIDE ROAD
GROUND FLOOR
6.9m 3.00M WIDE PATHWAY
5 4 3 2 1
B
3.7m (31.9m x19m)
+48.00M
RAMP UP
SLOPE 1:8
TP-PR11
FFL
Car-43 Car-32
21.3m
WWTP
(9m x31m)
B
Car-46 Car-35
28m
BETAINE ISBL GANTRY 1.775m WIDTH
Pump CR-1A
(10m x31m)
MARVEL 2
34.9m
Car-47 Car-36
EXISTING
LOADING DOCK
Pump CR-1B
(4m x19m)
Car-49 Car-39
AREA
(31m x22.8m)
D
P2002
T-2002
TP-UT03 Car-50
EXPANSION
Car-40
ROAD-B
#
Car-51 Car-41
Parameter Fencing
#
DMAPA FEEDING SHP 3
19.5m
PUMP 1 (B TIPL) UP
20-P-015A
P2004 T-2004 DMAPA FEEDING FILTER
TR CAN
PUMP 2 (B TIPL)
E 20-P-015B PRESS
DAF 2 CHEMICALS
COOLING
STORAGE
TOWER
E A
FIC T
TREAD = 300 MM. TREAD = 300 MM.
EX ININ EEN
INSTRUMENT AIR TIE-IN LOCATION
RISER = 150 MM. RISER = 150 MM.
OF ION
F GLAZING AS PER DETAIL TREAD = 300 MM.
RISER = 150 MM.
P U
IN NS R) 25m
FORKLIFT PATHWAY
WC
P U
BLOWER
MA XPA FLOO d F SI OO
1
A
1.5m
WC
P2003 T-2003 T-2001D 5A MANAGER
E nd
MAIN OFFICE
BETAINE
O
For all On Off Valve or Instrument at
COOLING TOWER
(2 R)
7M INTERNAL RING ROAD
BLOWER
5B
FMR C TREAD = 300.00 MM. WAITING
WALL UPTO
SECOND FLOOR
P2006
T-2006
Pump CW-2 T-2001C
Y
SHUTTER
3.2m
WA
FUTURE
10m X 20m
TH
COOLING TOWER 1
ROAD-B
IN
UP
DOCK BUMPER
PA
TE G
300 WIDE x 325 HIGH x 100 THK
SH CKIN
T-2005B
R
IDE
FORKLIFT PATHWAY (6m WIDTH)
T-2001B
6m
℄ OF ROLLING
+48.4M FFL
SHUTTER
1.1 WIDTH ACCESSWAY
O
EL
MW
SM
P2005B
TP-UT04
3.0
3.0M WIDE PATHWAY
TP-UT12
DOCK LEVELER
DOCKS
P2005A CL OF ROLLING
SHUTTER
T-2005A
T-2001A
LOADING / UNLOADING
FUTURE
COOLING TOWER 2
FUTURE
AREA
CL OF ROLLING
BIGLEAP WAREHOUSE
+48.9M FFL 6M WIDE INTERNAL ROAD
Container Sheet
SHUTTER
54.5m
Pump WW2 Pump WW1
300MM WIDE
3M width walkway
DOVE WAREHOUSE
SHUTTER
65m x 40m
PCV Ø8" Wastewater to PTPN
CL OF ROLLING
SHUTTER
PARKING
BAY BETAINE PARKING +47.53M FFL
BETAINE DRUMING BAY CS Ø6" Natural Gas pipeline
Parameter Fencing
AREA DMAPA
LOCKER ROOM
32.1m
SHUTTER
+48.4M FFL
LOADING
BETAINE UNLOADING
DMAPA CS Ø1/2" Instrument Air pipeline
TP-UT09a TP-UT09b
N
N
12.5M X 24 M 2m
ENTRY EMERGENCY EXIT
CORRIDOR
LEVELTOP
LEVELBUTTOM
UP
SLO
NEW 2.0M WIDE PIPE RACK ENGINEERING
PE
+48.900M LVL
SLO
SLO
11.65m
10.9m
J2
11.9m
E
PE
OP
PE
E
OP
FRL
OP
SL
SL
E
SL
OP
SLO
UP 1 . 5 M W I D E P A T H W A Y F O R M A N M O V E M E N T 1 . 5 M W I D E P A T H W A Y F O R M A N M O V E M E N T
OFFICE
SL
PE
FENCING
PE
CORRIDOR
PE
E
SLO
OP
48.900M
SLO
FLOOR TRAP
8.3m
SL
FFL
EXPANSION
5m
47.700 M SLOPE 1:10
FGL
FRL
T8D T8E
MCC-7
RAMP DOWN
SLO
SLO
E
7M INTERNAL RING ROAD
OP
E
SLO
SLOPE 1:20
SLO
E
OP
(2nd FLOOR)UP
OP
PE
OP
PE
8m
SL
9.6m 38.1m 30m
MCC ROOM
SL
PE
SL
PE
SL
± 0.00M LVL ± 0.00M LVL ± 0.00M LVL
X=538787.349
3.8m
P J
3500 2980 9555 3040
1000
3925
X=538862.754
T4A T4B NLDFA HUL/ NLDFA HUL/ NLDFA HUL/
1000mt 1000mt
2.4m
(SLOPE 1:8)
UP CUTOUT IN WALL OF SIZE 2003MM X 1003MM AT
Y=346584.093
RAMP UP
TRAINING ROOM
PARTITION
PLATE
EXTERNAL ROAD
TOGS TOGS
WELL WELL
48.900M
FFL RCC DYKE WALL (TYP) CLASHING TO STR BEAM
X=538832.792
P U
PFAD PFAD
LADDER
200MM THICK
Y=346585.601
TK-2601
R 600MM HIGH
200
CHILLER ROOM
P'
(∅11.644m X 24.384m) (∅11.644m X 24.384m) (∅11.644m X 24.384m)
2250
4350
OF EQUIPMENT
OFFICE & UP PLATFORM
(∅7.763m X 24.384m) (∅7.763m X 24.384m)
15.1m
MCC-5
LOCKER UP
CHILLER
MCC
UP AWC TANK
ROOM
TK - 27001
ROOM
18.2m
FT
CONNECTING PASSAGE
Ø4000
DRUMMING
48.900M Q
P U FFL
(1st FLOOR)
10380
7.5 M WIDE
Q
3470
AIT-D TANK NEW 2.5m WIDE PIPE RACK
PLANT T9B
3530 TK-27003A
W/SHOP &
STORE +48.000M LVL
5100 FT
P
FRL FIRE ESCAPE STAIRCASE 500mt
19200
EXPANSION
UP
2430
TREAD = 250mm
RESIDUE
PASSAGE RISER = 175mm / 150mm
P U
FLAKING 48.900M
BETAINE TANK PUMP DRAWINGS
0
LEVELBUTTOM
T2B
50
T14A T14B T14C
00
(∅5.82m X 22.86m)
10
RAMP STAIRCASE-3 STEP-2
Ø40
NEW BIOMASS
UP A10
Ø
RISER-150MM
HOT WELL/
(SLOPE 1:10) REST
TREAD-300MM
1000mt
FLAKING
W.C ROOM UP
Q' FEMALE PIPE RACK
DRUMMING
25000
2000mt 2000mt 2000mt
W.C W.C W.C
TPM OFFICE TREAD - 300MM
TREAD = 250 MM RISER- 150MM
PUMP
FILE RACK
7250 X 4100
B B B B B
5900
RISER = 182 MM
9000
48.900M
BPO
REST ROOM MALE
PASSAGE FFL
DRAWINGS
HP BOILER
48.890M
P U
DIRTY
LOCKER ROOM (260nos) 48.900M
FFL URINAL AREA
9600 X 4000 FFL MCC ROOM B B B B B
7000
CUTOUT IN WALL OF SIZE
R ON HOLD
BETAINE TANK
T9A
EMPTY PALLETS
WALL CUTOUT LOCATION
9.3m
TK - 27004B & SIZE ON HOLD
(∅7.763m X 24.384m)
500mt
47.700 M SECONDARY LOOP +48.150M FFL
10.4m
00
UP UP
27.5m
Pak Sahab Data : Existing DN150 (13 barg) 12m
P U
M
13000 FGL
47.700 M
PROPOSED MCC ROOM AT 0.0M
PUMPS AT 0.0M & BUHLER
Ø40
TANKFARM
(FUTURE MCC ROOM 4.5M)
ATAT
RESIDUE
FGL (FUTURE
7.00
MCC
M XROOM
9.00 M
AT 3.5M) AT 3.5M FROM FFL
TREAD - 300MM TREAD - 300MM TREAD - 300MM TREAD - 300MM
46.1m
A9
1.5m
345MM X 345MM AT BOTTOM FREIGHT ELEVATOR
6mX12m
5010
OF OPENING EL + 6.100M (SHAFT SIZE -
(FOR HVAC)
3900 x 3900) (∅5.82m X 22.86m)
11.9m
ROAD-D
(DOVE)
6m
+47.700M LVL ( FUTURE ) STAIRCASE-1
890
K
6 M WIDE INTERNAL ROAD ( FUTURE ) 0 SOAP NOODLES PLANT
9000
Ø1050 CUTOUT IN WALL OF SIZE
7820
315MM X 315MM AT BOTTOM
40 x 92M2
OF OPENING EL + 6.100M
(FOR HVAC) MCC ROOM
XX
71.5m
3.8M X 8.2M
46.9m
COAL
51.9m
PRINTER
MCC ROOM DESK
500mt
TP-UT15
1000 3.8M X 8.3M
3m
6000
UP CAGE LADDER
3 ±0.00M LVL
12000 DOVE PLANT SAFETY
UP TREAD = 300mm
RISER = 175mm / 150mm
MCC
ROOM-1 C16C18
3.20m T2A T5A T5B
WIDTH = 1500mm
+48.750M FFL
1
NO. OF RISERS = 39NOS.
EYE WASH
1500
1
TOC A8 * STAIRCASE DETAIL AS PER DWG NO.
IES-PE-MU-UL-PDV-CS-GAD-020-040 (∅5.82m X 22.86m)
1000
PLC PANEL
UP
3000
H
1500
SOAP NOODLES
±0.00M LVL +48.150M FFL FOR STEEL STAIRCASE
PALM KERNEL SHELL
UP
TOC
DETAILS REFER
ROAD-B
STRUCTURAL DRAWINGS
START POINT
350°
UP EL(+)3.500
START ANGEL
XX
(T.O.G.)
UP TROLLEY FOR
T12A T12B
6450
OFF SPEC
250
1100 NOODLE
300mt
25.1m
5445
(∅13.585m X 24.384m) (∅13.585m X 24.384m) (∅13.585m X 24.384m)
69555
REFINERY
2M WALL
P3
P3
2000mt 2000mt +47.700M LVL C12C14
CL. OF PUMP
DISCHARGE G FRL DYKE WALL
DISCHARGE
(∅4.85m X 19.812m)
19.3m
STEARIC STEARIC
1370
INSTRUMENT AIR TIE-IN LOCATION
CL. OF PUMP CL. OF PUMP
DISCHARGE DISCHARGE A6
PLANT
00
Ø85
T13
11470
± 0.00M LVL
ACID ACID
TOC. 47.70M
CL. OF PUMP
F 200MM THICK
BLOCK WALL UPTO
DISCHARGE
(1000TPD)
(BUHLER AT 3.5M FROM FFL) TRENCH WITH
32m
P3
P3
9500 X 7700 400MM WIDE
8020
300mt
MS GRATING(1:200) STORM WATER
TRENCH WITH
MS GRATING(1:200)
3m
A B (∅4.85m X 19.812m) 200mm THK LOADING / UNLOADING AREA RAMP
C12C14 NEW 2.5m WIDE PIPE RACK
1000
UP UP
9970
-0.450M LVL
(SLOPE 1:8)
GRADE SLAB
FRL
1500 FGL
(∅4.85m X 19.812m)
32m X 14m
P3
P3
2475
PUMP DRAWINGS
1
5250
T7
DOOR
SERVICE
TREAD = 300mm
±0.00M LVL
3350 3000 5270 6000 2287 3713
1500 X 1000 SLIDING DOOR WITH WC
LOCKER
* STAIRCASE DETAIL AS PER DWG NO.
STAIRCASE-2 Y
3000
WINDOW 2000
Y=346539.150
100mt
IES-PE-MU-UL-PDV-CS-GAD-020-040
3750 X 3800 2650 X 2200
(56 NOS.)
ASA - D TANK WC WC
LINEN CABINET
2100
1300 X 1000 1500 X 1000
MANUAL DRUM
MS CAGE STEP-1
CLEAN
200MM THICK LADDER
FIRE EXIT X=538799.764
LE D1
RISER-150MM
RAMP
SLIDING DOOR
X=538844.308
( FUTURE ) UP MALE TOILET
3500 1350
JANITOR
CHIMNEY
UP
SITTING
SITTING
E
FEMALE TOILET
Y=346533.957
CHIMNEY
(SLOPE 1:10) DYKE WALL LABORATORY TABLE 3250 X 3300 1100MM WIDE TEA /
COFEE 3950 X 3850
FILLING STATION A4
VENDING
CANOPY ABOVE
TOILET
(∅3.881m X 10.668m)
10
SERVER ROOM
46
P3
P3
P U 5.0M X 2.0M
LINEN CABINET
Area T-1017 (TF 2 FA)
2648
3440 X2615
C.P.
10
PLATFORM FOR
DIRTY
QUALITY TEST
2800X2925
00
46
10
(SLOPE 1:8)
500 2000 C.P. BREAK OUT AREA
85
MEETING ROOM ACCESS
PASSAGE 1350MM WIDE P U
46
25.9m
3150X2925
5.7m
RAMP
2985 x 3640 CONTROL
4550 M X 2925 M
Ø
DOOR
6085
5330
2 LOCKERS ACCESS FACTORY WORKERS
2000
SPECIAL ANALYSIS 9 NOS. CONTROL ENTRANCE
PASSAGE 1350MM WIDE
UP
LABORATORY TABLE DOOR
3.20m
WITH FUME HOOD
ID FAN
ID FAN
ID FAN
ID FAN
5.14m
T10
8000
CL. OF PUMP CL. OF PUMP CL. OF PUMP MALE LOCKERS
CL. OF PUMP
DISCHARGE DISCHARGE (144 NOS.)
CONF. ROOM SPARE ROOM
DISCHARGE
230
DISCHARGE
5390 7000 X 6175M
JANITOR
100mt
1000
1000
(EACH 300X450X450X4NOS.)
SILO
(EACH 300X450X450X4NOS.)
MALE TOILET
OFFICE
LOCKERS 14 NOS.
12.3m
4650X4625
LOCKERS 13 NOS.
OPERATIONS
SITTING
SITTING
SITTING
SITTING
SLIDING DOOR
LE D2
P3
P3
ENTRY FOR
713 713 713 713 D
REPROGRAPHIC
11440 EQUIPMENT MOVEMENT OFFICE
20.1m
COUNTER
LABORATORY
FILING UNIT
5047
SERVICE
X=538799.462
NEW BIOMASS
TABLE
GRIT ARRESTOR 45 CYC
(∅3.881m X 10.668m)
DOOR
3750 X 3800
LOBBY
HOT WATER Y=346530.207 CUTOUT IN WALL OF SIZE
454MM X204MM
CUTOUT IN WALL OF SIZE
454MM X204MM
WC
1500 X 1000 DUCT
REFRIGERATOR AT BOTTOM OF OPENING ±0.00M LVL
UP
SAND FOR AT BOTTOM OF OPENING 1000 X
EMERGENCY IN CASE EL.+ 3335 (FOR HVAC) EL.+ 3325 (FOR HVAC) FFL
5255
A3 WC
P3
P3
1500 X 1000
17.49m 3m 6m 12.5m 6m
3200
TP-UT11
FROM VENDOR N2 H2 LPG H2
COMPRESS
AIR
HP BOILER
SPACE FOR
ACP CLADDING AS
45.1m
CYLINDER STANDBY TROLLEY
3 CYLINDER ON LINE
SLIDING DOOR
RCC BLOCK
ROSINK OIL PREHEATER
6.5m
PER ELEVATION
WALL (TYP)
N2 N2
CYLINDER STANDBY
H2 3000 x 1000
+0.150M LVL
2.3m
450 HIGH
CL. OF PUMP
200 THK.
±0.00M LVL
CUTOUT IN WALL OF SIZE
24000
X=538844.008
3828
NEW THERMAL
(SLOPE 1:8)
15.3m
EL.+ 3325 (FOR HVAC)
5m
CL. OF PUMP
TOC
DISCHARGE SLOPE: 1:8
RAMP
DISCHARGE PLINTH PROTECTION
19.8m 1.5m
8000
2m
RAMP UP
2100
F
10000
200 150 ACP CLADDING AS PER -0.450M LVL CANOPY ABOVE ACP CLADDING AS PER
(1000KVA, 400V)
APPROVED SHOP APPROVED SHOP
FGL 8.8M X 4.4M
P3
P3
4300 1000 DRAWINGS DRAWINGS
DG + SYNCH PANEL
TRANSFORMER-01
OIL HEATER PLANT
4000
20KV/0.420KV
MS GRILL AS PER
GATE-3
GATE
OE1
6075
& GATE
CANOPY ABOVE A2
2MVA
11340
-0.450M LVL
7519
C OFCL TRANSFO.
APPROVED
34655
28M X 41M
ROAD-E
FGL
OF TRANSFO.
SPECIFICATIONS
6m
10000
5860
10M WIDE INTERNAL ROAD
5860
(1000KVA, 400V)
10m
ROAD-H
HOLD
7710
2M WALL
GATE-4
DG-2
26" COOLING WATER 300mm THK
4000
E
NITROGEN
41x74 M2
SUPPLY AND RETURN LINE
T.O.H #1
T.O.H #2
T.O.H #3
T.O.H #4
18.4m
GRADE SLAB
4000 3350 3000 TANK
LAB
P3
P3
-0.45M FGL
N2 INDUSTRIAL GRED TIE-IN LOCATION
LV PANEL ROOM
TRANSFORMER-02
COOLING TOWER - DOVE
COOLING TOWER - FUTURE
20KV/0.420KV
3000 2209
PMH PMH
2MVA
PMCC
EXPANSION
UPS-2
GATE
GATE-2
6000
& GATE
L
(1000KVA, 400V)
B
L
1200
C OF TRANSFO.
2M WALL NEW 1.5M WIDE PIPE RACK 300Ø PWP PIPE U/G
DG-3
OE1
A1
4000
(10m X 20m)
24150
T11A T11B
UPS-1
100mt 100mt T15A T15B T15C
MAIN PLANT
D
NEW GLY LOADING AREA
5.4m
FILTERED WATER TIE-IN LOCATION
99C16FA 99C16FA
1825
500mt 500mt 500mt
P3
M
5.2m 2m 7.5m
TRANSFORMER-03
C'
DFA BLEND DFA BLEND DFA BLEND
30m
(∅3.881m X 10.668m)(∅3.881m X 10.668m)
SUBSTATION - DOVE
(FUTURE)
11620 6000 6000 6000 12380
UP
GATE-1
2700
UP UP
(∅5.82m X 22.86m) (∅5.82m X 22.86m) (∅5.82m X 22.86m) 300Ø RCC PIPE U/G
6897
UP
4.5m
6000
21.3m
C
CHARGER &
12.4m
DCDB
2. SOFTEN WATER 1"
1425
3. LOW STEAM 1"
+0.00M LVL
P2
T22A T22B
B
27.3m
1. HOT WATER SUPPLY 2"
MV PANEL
2. HOT WATER RETURN 2"
3. NITROGEN FLUSHING 1" SLOPE: 1:8
4. NITROGEN BLANKETING 2"
ROOM
FUTURE
FUTURE
5. INSTRUMEN AIR 1" RAMP UP
P2
FFL
FIRE PUMP HOUSE
1000mt 1000mt
-0.45M LVL
9.4m
1910
P2
P2
SOAK
6.2m
EXPANSION TANK
OIL
PIT
DRAIN TANK
3500
FRL
4000
5575
HT PANEL
USP GLY. USP GLY.
6125
50 CBM
FIRE PUMP HOUSE
20 CBM
2.8m
T-819 T-818
PUMPS (∅7.763m X 24.384m) (∅7.763m X 24.384m)
5090
(FUTURE)
23.4m
A
8050 6335
18.1m 6m
SLOPE: 1:8
NEW 2.5M WIDE PIPE RACK NEW 2.5M WIDE PIPE RACK
9500 1 1' 2
TP-UT08 61.1m
5.1m 800 4800
12675
7075
2.4m
FILTER
PUMP
G
FILTER
WATER TANK WATER TANK
ROOM
MCC 7, MCC 3, TP-UT14
3'
1
3
+47.70M +48.00M
WB-
FFL
WB-12
FGL
ISR
WB-12 12
ISRAEL MOT
2005 (IL) AEL
MO
6m
6m
T 200 F
3.3m
ISRAEL MOT 2005 (IL) ISRAEL MOT 2005 (IL)
FA REFINERY
ROAD-C 5 (IL
)
&
47.70m
UP
SOFT WATER
T27 MCC 4.2
4.6m
C12C18FA TIE-IN LOCATION
500mt
P2
TANK
P2
SOFT. WATER
UP
TANK E
P2
3.48m
3.5m
+47.80M
2548.6440
15m X 20m
FPL
W=4500
H=4500
P1
WALKWAY D
T-1017
4m 6m 8.5m THERMAL OIL DRAIN TANK HOUSE SOFT WATER SOFT WATER
2.6m T25 TANK TANK
FAT SPLITTING &
+47.950M LVL
FFL
CL. OF PUMP
DISCHARGE
ACID SEWER WTP
5m 1000mt
SYSTEM C
LC DEAERATOR
P1
TRENCH
P1
WASH
PLANT
NEW 2.5M WIDE PIPE RACK
(41m X 12m)
DISCHARGE TRENCH +47.950M LVL
P1
P1
P1
+48.00M
FFL
E1 E1
(48m X 22m)
CL. OF PUMP
DISCHARGE
PLANT
TP-PR08
P1
P1
MCC ROOM
UP
NEW 2.5m WIDE PIPE RACK
5m
FFL
+48.00M
TRENCH
COOLING TOWER
CONTROL
ACID SEWER
ROOM
SYSTEM
50.77m
P1
P1
METAL GRATING
(BIGLEAP)
TP-PR13
UP
1.5m
P1
P1
+49.150M LVL
5.9m EXISTING
20.1m
P1
P1
7m FAT TRAP FA
Ø400.0000 Ø400.0000
Ø400.0000
CATALYST
LOADING (2.5m x 6m)
P1
P1
23m
2710.2764
AREA
UP
P1
P1
GROUND
6.8m
HSD DAY TANK WATER
5.8m
34.6802
Ø1000.0000
Ø1200.0000 Ø1200.0000
UP
Ø2000.0000 Ø2000.0000
CL. OF PUMP
DISCHARGE
CL. OF PUMP
CL. OF PUMP
DISCHARGE
CL. OF PUMP
72m TANK
2U 2V 2W
P1
P1
P1 A
P1 A
P1 P3 P3 A
P1 A
P1 A
P1 A
P1 A A A A
A A A A VALVE PIT
Ø1600.0000 CABLE TRENCH A A
(TYP.)
NEW CHP
Ø1600.0000
6m
W=6000
8.9m
H=4500
P1
P1
P1 A
P1 A
P1 P3 P3 A
P1 A
P1 A
P1 A
P1 A A A A A A
A A
A A
P1
P1
NEW 2.5m WIDE PIPE RACK
FUTURE ROAD
TP-PR07
P1
P1
A A
P1
P1
E1 P2 E1 P2 P3 P3 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
2m
A A
P1
P1
P2 P2 P3 P3 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
E1
3m
3m
E1
A A
+47.700M LVL
UP 2M WIDE PAVED ROAD
P1
P1
FGL
6.2m
A A
SLOPE : 1:8
TANKFARM
UP OPERATOR / NITROGEN MCC ROOM
RAMP UP
EQUIPMENT MANUAL TOILET
RACK
EWS CONTROL SHIFT INCHARGE +48.150M LVL WIDTH = 1000MM
50mt 200 THK.
A A
P1
P1
P-1001B
1&2
ABLUTION EWC
DETAILS REFER VERTICAL CABLE TRAY FFL 1.5X0.9M 1.4X1.2M MAC
STRUCTURAL DWGS. +48.150M LVL
WITH SUPPORTS
N2 PLANT MCC
P1
P1
+48.150M LVL
FGL. 0.000M DCS PANEL UPS FFL
FFL
FOR DETAILS
REFER
D-3 +47.850M LVL
200MM THK BLOCK FFL
MECHANICAL
SAMPLE STORE
15m
P3
P1
(BIGLEAP)
SLOPE) WALL UPTO 3400MM
FUTURE
EL. 13.283M
TANK +48.150M LVL @4605MM FROM FFL SECTION A SECTION B SECTION C SECTION D TRANSFORMER - 1
TYP.
DETAILS REFER MAC
STRUCTURAL DWGS.
MCC -2 K112
T1A T1C
FFL
TK-1001A
TK-1001D
NEW 2.5M WIDE PIPE RACK
WORKSHOP
+48.150M LVL
+48.150M
AC-1 FFL OFFICE/UTILITY
SUBSTATION
FFL AC-2 AC-3
2000X600MM 2000X600MM 48.150 M
CONTROL DESK
A A
P1
15000mt 15000mt
1810X810MM HVAC WALL CUTOUT@ WALL CUTOUT WALL CUTOUT FROM FFL FROM FFL
(TYP.) WALL CUTOUT 4145MM FROM FFL @ 55MM FROM FFL K113
@ 55MM FROM FFL @ 55MM FROM FFL
X 150MM HIGH KERB WALL
TRANSFORMER - 2
TOS. 2.200M
P-1000A 47.700 M LVL
(TYP.)
SLOPE 1:8
RAMP
STEPS-4 (TYPICAL) 475MM Ø HVAC WALL CUTOUT STEPS-2 (TYPICAL)
SLOPE 1:8
SLOPE 1:8
SLOPE 1:8
SLOPE 1:8
SLOPE 1:8
CPO CPO
UP
RAMP
RAMP
RAMP
RAMP
RISER = 150MM RISER = 150MM STEPS-1 (TYPICAL)
WIDTH = 3000MM
LADDER
MONKEY
TREAD = 300MM
RISER = 150MM
P-1000C
P1
TRANSFORMER - 3