You are on page 1of 1

PLANT NORTH

TRUE NORTH
C14 / FA TIE-IN LOCATION LP CONDENSATE TIE-IN LOCATION
(C14 / FA Transfer from TK-805A/B (From Sunshine Project)
Via Pump P-805A/B To Sunshine TF) Bu Dewi Info : To Existing HW Tank TK-1207 HOT WATER RETURN TIE-IN LOCATION
LOCATION OF TP-PR05 TP-UT02
For Tank T-818 & T-819 Heating Coil (At TF 3 FA)

SUNSHINE PROJECT STEARIC ACID / FA TIE-IN LOCATION C12 / FA TIE-IN LOCATION


TP-UT06a TP-UT06b
HOT WATER SUPPLY TIE-IN LOCATION
(STEARIC ACID / FA Transfer from TK-806A/B (C12 / FA Transfer from TK-804A/B For Tank T-818 & T-819 Heating Coil (At TF 3 FA)
Via Pump P-806A/B To Sunshine TF) Via Pump P-804A/B To Sunshine TF)
TP-UT05a TP-UT05b
TP-PR06 TP-PR04

GATE D PEDESTRIAN WAY PEDESTRIAN WAY PEDESTRIAN WAY

5m
8.7m

8.7m

10.7m
61.6m
GATE B GATE A

4.7m

33.7m
TRUCK ENTRY MAIN ENTRY

5254

8.4m
10.2m
17000
20000

LANDSCAPE AREA
7M INTERNAL RING ROAD 7M INTERNAL RING ROAD TRUCK ENTRY

20000

15m
16.5m 24m 8.7m
PERTAGAS HOUSE 5m
11.4m
GUARD 1'

EX MU

4.5m
0.6m 0.3m X=538920.164

PA SO 41.9m 2m

D
EXIT ENTRY Y=346720.075

18m
ENTRY ENTRY

1
POWER POWER
DISTRIBUTION BOX
DISTRIBUTION BOX MATERIAL D'

METERING NS LA

12000
RECEIVING PRAYER ROOM
DESK PANTRY 2.2M X 2.0M REST ROOM X=538921.327
2

3m 4.8m
2.8M X 2.0M 3.4M X 3.25M Y=346721.715

1.5m
2.3M X 2.1M

C
11m 5.5m
X=538915.686

5.5m 3.7m 11.1m 2.4m 2.4m 2.4m


Y=346719.736
X=538922.853
IO

7m
DISTRIBUTION BOX
PASSAGE 1.4M WIDE Y=346720.118
+48.150M

C'
3

1m 1.8m
FFL

STORAGE CABIN
MEH
N

6m
+48.150M +48.6 RAB

3.2m
SECURITY OFFICE FFL 00M

FFL
17000 12183 4.0 X 3.0 M W.C W.C X=538928.753

HEIGRAIL
VISITOR'S LOUNGE

HT
ENTRY +48.14M

4.2m
B
+48.150M
Y=346716.230

M D
3.4M x 4.5M FFL

300M HAN
FFL

7.2m 7.2m

4
TOILET

B'

S.S.
16200
3.8m
3.40M X 3.25M PLINTH

138m

TAIN
LANE 5 PROTECTION

CUR
LANE 4 A
+48.150M
X=538915.955
2200
UP
Mini open drain Concrete Bundwall +48.150M +47.700M FFL

5
ENTRY
FFL FGL A' Y = 346715.254
20cm thk

TWO WHEELER PARKING


150mm width x 250mm depth LANE 3 LANE 2 LANE 1 SECURITY OFFICE UP

40m
SEA
FOR TING ABL
8800 50 UTIO

2.4m

5000
3100

2.4m
PEOCAP
FIRE CABIN FIRE CABIN +48.1x 1000 N(w
X36
PLEACIT +48.1 ome
50M 0 00 FD
Y

FFL
FFL n)
X=538934.404

7m
PANTRY X=538914.489
40M

GUARD
VISITOR'S LOUNGE PLIN

6
PRO
Y = 346713.879 Y=346711.299

Ruang Makan
+48.150M TH

famale
Bed room
FD

DRUMS 1200
TEC
FFL
0.0000

A
EMERGENCY CONTROL ROOM TION

1.2m

1.2m
Office
+48.150M
FFL

CUSTOM OFFICE TOILET

1
ENT
+48.1 GAL
1 2 3 4 5 6 2.50 X 1.50 7700 RAN
X43 CE
FFL 40M SHO
(wom E
ACC VAN
ESS IZED
X=538916.278 +48.1
FFL 50M 00
150
0X3 en)
RAC
K LAD STE
600

12.5m
Y=346712.583

CAR PARKING
DER EL

STORAGE

33m
Male
Bed room
LOCKERS

1
1 CHANGE 1.40X1.50

HOUSE
ROOM CCTV & FIRE PANEL
1.00 X 1.50
OP
2

12800

12000
2w 2v 2u 2n 2w 2v 2u 2n

Toilet

Toilet
C.L Tank C.L Tank

Toilet
1W 1V 1U 1W 1V 1U

(60 nos.)
TRAFO 2.0 MVA TRAFO 2.0 MVA
B3 SCREEN

(30 nos.)
(SUNSHINE) (FUTURE) 3 ABL
100
DOMESTIC UTIO STE

27m
KER MM
TRAFO AREA

9000
DOCTOR'S CABIN +48.1 N(m T
BRIC
P B THIC
FFL
40M en) R = 300K IN WAL
= WO
L K
TRASH BIN 4
150
X=538932.036
STORAGE
RK
ENT
INDUCTION ROOM (30NOs) WAITING AREA RAIS +48.1 RY
Y=346708.588
ENTRY +48.150M ED FFL 40M
DRA PLA
FFL TFOSEA
X=538920.929 IN

OP
LV PANEL 5 1200.0000

+47.850M
+48.150M POLY CLINIC TRO
UGH
RM T
FFL +48.150M Y=346707.264

SLOPE
BUILDING
FPL

FD
3000 3600 3000 3600 3000 FFL SHO
150 (meE RAC
+47.7
FGL

18m
X=538928.960

SLOPE
FD 00M
0X3 n)
K
600
Y=346705.035

BATTERY CHARGING ROOM


+48.150M
Grating Cover FFL UP ENTRY
SUBSTATION ROOM
100

15.5m
KER MM

7.7m 12.7m 17.1m

WEIGHBRIDGE 1
B THIC
WA K
LL
MH

3600
IN

3530
3m 4m 3m
OUT
X=538926.579
CONTROL MV PANEL
BOX Y=346702.334

PROPOSED NEW
ROAD-J 4M WIDE ROAD 3m
BETAINE HPKO TIE-IN LOCATION
WW DISCHARGE POINT

(10m x30m)
PROPOSED ISBL MCC PANEL

MARVEL 2
1 2 3 4
SUNSHINE MCC ROOM

SLOPE 1:8

SLOPE 1:8
RAMP UP

RAMP UP
(Transfer from Sunshine TF to Dove Plant)
PROPOSED OSBL MCC PANEL
UP UP +47.70M

CHEMICAL
FGL

D ENTRY EXIT ENTRY EXIT ENTRY EXIT

4m
TOILET
TOILET +48.050M

7m
ROAD-G
LABORATORY

WAREHOUSE MARVEL 2
FFL
W.C
ROOM
+48.050M
FFL

6M WIDE ROAD

R1
6.00M WIDE ROAD

MCC PLINTH WORKING


WEIGHT 2500 kgs.
** Actual Location Pump P-27017 TBC at site by UOI
MCC/CONTROL
DCS PANEL
CHEMICAL STORE ROOM
ROOM
C

(Required 530 Pallet)


+48.050M PLC
FFL PLINTH
DCS PANEL ROOM

NEW WAREHOUSE MARVEL 2


+48.00M
FFL

GROUND FLOOR
6.9m 3.00M WIDE PATHWAY
5 4 3 2 1

B
3.7m (31.9m x19m)
+48.00M
RAMP UP
SLOPE 1:8

80m x 60m Car-42 Car-31

TP-PR11
FFL

Car-43 Car-32
21.3m
WWTP

BETAINE & UNCOVER


A
A
Car-44 Car-33

BATTERY CHARGING ROOM


RETAIN SAMPLE
Pump WW3

HOT WATER SUPPLY TIE-IN LOCATION Car-45 Car-34

(9m x31m)
B
Car-46 Car-35

28m
BETAINE ISBL GANTRY 1.775m WIDTH

Pump CR-1A

For Tank T-1017 Heating Coil (At TF 2 FA)


CR-01 CR-02

(10m x31m)
MARVEL 2

34.9m
Car-47 Car-36

EXISTING
LOADING DOCK
Pump CR-1B

C CHEMICAL WH Car-48 Car-37

BETAIN & UNCOVER PARKING

(4m x19m)
Car-49 Car-39

AREA
(31m x22.8m)
D
P2002
T-2002

TP-UT03 Car-50

EXPANSION
Car-40

ROAD-B

#
Car-51 Car-41
Parameter Fencing

#
DMAPA FEEDING SHP 3

19.5m
PUMP 1 (B TIPL) UP
20-P-015A
P2004 T-2004 DMAPA FEEDING FILTER

TR CAN
PUMP 2 (B TIPL)
E 20-P-015B PRESS
DAF 2 CHEMICALS
COOLING
STORAGE
TOWER
E A
FIC T
TREAD = 300 MM. TREAD = 300 MM.

EX ININ EEN
INSTRUMENT AIR TIE-IN LOCATION
RISER = 150 MM. RISER = 150 MM.

OF ION
F GLAZING AS PER DETAIL TREAD = 300 MM.
RISER = 150 MM.
P U

(2n PANG R &


P U

IN NS R) 25m

FORKLIFT PATHWAY
WC
P U
BLOWER

MA XPA FLOO d F SI OO
1
A

1.5m
WC
P2003 T-2003 T-2001D 5A MANAGER

HOT WATER RETURN TIE-IN LOCATION LO ON M


P U OFFICE

E nd
MAIN OFFICE
BETAINE

O
For all On Off Valve or Instrument at
COOLING TOWER

(2 R)
7M INTERNAL RING ROAD

BLOWER
5B
FMR C TREAD = 300.00 MM. WAITING
WALL UPTO

SOAP PLANT MCC


Pump CW-1 RISER = 150.00 MM. HOLD
³ ³ WIDTH = 4000 MM 3.7M HEIGHT
CANOPY ABOVE

SECOND FLOOR
P2006
T-2006
Pump CW-2 T-2001C

19.4m 18.4m 4m & MCC 7


For Tank T-1017 Heating Coil (At TF 2 FA)

3.0M WIDE PATHWAY


Gate
CL OF ROLLING
RM RACKS AREA

Y
SHUTTER

Area T-818 & T-819 (TF 3 FA)


+48.9M FFL

3.2m

WA
FUTURE
10m X 20m

TH
COOLING TOWER 1

ROAD-B
IN

UP
DOCK BUMPER

PA

TE G
300 WIDE x 325 HIGH x 100 THK

SH CKIN
T-2005B

R
IDE
FORKLIFT PATHWAY (6m WIDTH)
T-2001B
6m
℄ OF ROLLING
+48.4M FFL
SHUTTER
1.1 WIDTH ACCESSWAY

O
EL
MW

SM
P2005B

TP-UT04

3.0
3.0M WIDE PATHWAY

TP-UT12
DOCK LEVELER

DOCKS
P2005A CL OF ROLLING
SHUTTER
T-2005A
T-2001A

LOADING / UNLOADING

FUTURE
COOLING TOWER 2

FUTURE
AREA

CL OF ROLLING
BIGLEAP WAREHOUSE
+48.9M FFL 6M WIDE INTERNAL ROAD

Container Sheet
SHUTTER

54.5m
Pump WW2 Pump WW1

300MM WIDE

WASTE WATER TREATMENT PLANT


DRAIN TRENCH

DOVE WAREHOUSE 2 NOS PACKING MACHINE


NITROGEN +48.9M FFL
SKID AREA
CL OF ROLLING JUMBO BAG
BIGLEAP WAREHOUSE

3M width walkway
DOVE WAREHOUSE
SHUTTER

NEW 2M WIDE PIPE RACK


P2001A
DMAPA UNLOADING
PIT
PUMP
(M2) LOADING / UNLOADING
AREA

65m x 40m
PCV Ø8" Wastewater to PTPN
CL OF ROLLING
SHUTTER

N2 INDUSTRIAL GRED TIE-IN LOCATION


Parameter Fencing

PARKING
BAY BETAINE PARKING +47.53M FFL
BETAINE DRUMING BAY CS Ø6" Natural Gas pipeline
Parameter Fencing

AREA DMAPA

SOAP OFFICE (DCS) &


For Blanketing Tank T-818 & T-819 (At TF 3 FA)
DOCK LEVELER

HDPE Ø4" Wastewater pipeline CL OF ROLLING

LOCKER ROOM

32.1m
SHUTTER
+48.4M FFL

PVC Ø2" Raw Water to TOH Plant (20m X 10m)


NEW 2.0M WIDE PIPE RACK

LOADING
BETAINE UNLOADING
DMAPA CS Ø1/2" Instrument Air pipeline

Pak Sahab Data : Existing DN50 (3 ~ 5 barg)


CL OF ROLLING
SHUTTER

HDPE Ø3" Wastewater pipeline +48.9M FFL

FOLDING GATE HDPE Ø3" Wastewater pipeline DRAIN TRENCH

MARVEL 2 SOAP NOODLE 5.8m 6m


RAMP
(SLOPE 1:10)
82.8m 30m 13
MANUFACTURING PLANT

TP-UT09a TP-UT09b
N
N
12.5M X 24 M 2m
ENTRY EMERGENCY EXIT
CORRIDOR
LEVELTOP
LEVELBUTTOM
UP

SLO
NEW 2.0M WIDE PIPE RACK ENGINEERING

PE
+48.900M LVL

SLO

SLO
11.65m

10.9m
J2

11.9m
E

PE

OP

PE
E

OP
FRL

OP

SL
SL

E
SL

OP
SLO
UP 1 . 5 M W I D E P A T H W A Y F O R M A N M O V E M E N T 1 . 5 M W I D E P A T H W A Y F O R M A N M O V E M E N T
OFFICE

SL
PE
FENCING

PE
CORRIDOR

PE
E
SLO

OP
48.900M

SLO
FLOOR TRAP

8.3m
SL
FFL

FG MATERIAL CORRIDOR CORRIDOR


BOX FT

6M WIDE INTERNAL ROAD


COLUMN ON HOLD
RAMP
+0.450M LVL
FT FT FT

EXPANSION

5m
47.700 M SLOPE 1:10
FGL
FRL
T8D T8E
MCC-7
RAMP DOWN

7 M WIDE INTERNAL ROAD


T8C
S

SLO

SLO
E
7M INTERNAL RING ROAD

OP
E
SLO
SLOPE 1:20

SLO
E

OP
(2nd FLOOR)UP

OP
PE
OP

PE
8m

SL
9.6m 38.1m 30m
MCC ROOM

SL
PE
SL

PE
SL
± 0.00M LVL ± 0.00M LVL ± 0.00M LVL
X=538787.349

2000mt 2000mt 2000mt


FRL FRL FRL
EMERGENCY EXIT
J' 4 5 6 7 8 9 10 EMERGENCY EXIT
Y=346587.889
ENTRY ENTRY ENTRY
MPDB-1
M.S HANDRAIL

3.8m
P J
3500 2980 9555 3040
1000
3925
X=538862.754
T4A T4B NLDFA HUL/ NLDFA HUL/ NLDFA HUL/
1000mt 1000mt

2.4m
(SLOPE 1:8)
UP CUTOUT IN WALL OF SIZE 2003MM X 1003MM AT
Y=346584.093

RAMP UP
TRAINING ROOM
PARTITION
PLATE

200 THK. 1800MM.HIGH ± 0.00M LVL


BOTTOM OF OPENING EL.+ 5.950 (FOR HVAC)
± 0.00M LVL

SRI LANKA SRI LANKA SRI LANKA


HOT COLD 9940 X 10000
UP

EXTERNAL ROAD
TOGS TOGS
WELL WELL

48.900M
FFL RCC DYKE WALL (TYP) CLASHING TO STR BEAM
X=538832.792
P U

PFAD PFAD

LADDER
200MM THICK
Y=346585.601
TK-2601

R 600MM HIGH

A11 DYKE WALL

200
CHILLER ROOM
P'
(∅11.644m X 24.384m) (∅11.644m X 24.384m) (∅11.644m X 24.384m)

2250

NEW 1.5m WIDE PIPE RACK


TO BE CONSTRUCTED FT
15600 X 8100
AFTER INSTALLATION

4350
OF EQUIPMENT
OFFICE & UP PLATFORM
(∅7.763m X 24.384m) (∅7.763m X 24.384m)

15.1m

6M INTERNAL RING ROAD


ABOVE

MCC-5
LOCKER UP

CHILLER
MCC
UP AWC TANK
ROOM
TK - 27001
ROOM

18.2m
FT

CONNECTING PASSAGE
Ø4000
DRUMMING
48.900M Q
P U FFL
(1st FLOOR)

10380

7.5 M WIDE
Q

3470
AIT-D TANK NEW 2.5m WIDE PIPE RACK

PLANT T9B
3530 TK-27003A
W/SHOP &
STORE +48.000M LVL
5100 FT
P
FRL FIRE ESCAPE STAIRCASE 500mt

19200
EXPANSION
UP

2430
TREAD = 250mm

RESIDUE
PASSAGE RISER = 175mm / 150mm
P U
FLAKING 48.900M
BETAINE TANK PUMP DRAWINGS

THERMAL OIL PLANT


WIDTH = 1000mm
FFL
NO. OF RISERS = 39NOS.
Y R T N E
LEVELTOP TK - 27004A
(1st FLOOR) AWAITED * STAIRCASE DETAIL AS PER DWG NO.
IES-PE-MU-UL-PDV-CS-GAD-020-041

0
LEVELBUTTOM

T2B

50
T14A T14B T14C

00
(∅5.82m X 22.86m)

FIRE FIGHTING TIE-IN LOCATION


N

10
RAMP STAIRCASE-3 STEP-2

Ø40
NEW BIOMASS

UP A10

Ø
RISER-150MM

HOT WELL/
(SLOPE 1:10) REST
TREAD-300MM

1000mt
FLAKING
W.C ROOM UP
Q' FEMALE PIPE RACK

DRUMMING

25000
2000mt 2000mt 2000mt
W.C W.C W.C
TPM OFFICE TREAD - 300MM
TREAD = 250 MM RISER- 150MM
PUMP

FILE RACK
7250 X 4100
B B B B B

5900
RISER = 182 MM
9000

48.900M

BPO
REST ROOM MALE
PASSAGE FFL
DRAWINGS
HP BOILER

48.890M
P U

DIRTY
LOCKER ROOM (260nos) 48.900M
FFL URINAL AREA
9600 X 4000 FFL MCC ROOM B B B B B

7000
CUTOUT IN WALL OF SIZE

SOAP OIL BLEND SOAP OIL BLEND SOAP OIL BLEND


AWAITED
TANKFARM (DOVE)
48.900M 1000MM X 1000MM WITH
FFL INTERNAL DETAILS BOTTOM LEVEL AT 5000MM

R ON HOLD
BETAINE TANK
T9A

EMPTY PALLETS
WALL CUTOUT LOCATION

9.3m
TK - 27004B & SIZE ON HOLD
(∅7.763m X 24.384m)
500mt
47.700 M SECONDARY LOOP +48.150M FFL

10.4m

00
UP UP

37m COOLING TOWER


P U

27.5m
Pak Sahab Data : Existing DN150 (13 barg) 12m
P U
M
13000 FGL
47.700 M
PROPOSED MCC ROOM AT 0.0M
PUMPS AT 0.0M & BUHLER

Ø40
TANKFARM
(FUTURE MCC ROOM 4.5M)
ATAT

(∅11.644m X 24.384m) (∅11.644m X 24.384m) (∅11.644m X 24.384m)


PROPOSED MCC ROOM 0.0M

RESIDUE
FGL (FUTURE
7.00
MCC
M XROOM
9.00 M
AT 3.5M) AT 3.5M FROM FFL
TREAD - 300MM TREAD - 300MM TREAD - 300MM TREAD - 300MM

BIOMASS STORAGE (M2)


7050 X 8875
RISER- 150MM RISER- 150MM RISER- 150MM RISER- 150MM
CUTOUT IN WALL OF SIZE

46.1m
A9

1.5m
345MM X 345MM AT BOTTOM FREIGHT ELEVATOR

6mX12m

5010
OF OPENING EL + 6.100M (SHAFT SIZE -
(FOR HVAC)
3900 x 3900) (∅5.82m X 22.86m)

11.9m
ROAD-D

NEW 2.5m WIDE PIPE RACK

NEW 2m WIDE PIPE RACK


AIT-D TANK

(DOVE)

6m
+47.700M LVL ( FUTURE ) STAIRCASE-1

FRL BETAINE TANK

890
K
6 M WIDE INTERNAL ROAD ( FUTURE ) 0 SOAP NOODLES PLANT

9000
Ø1050 CUTOUT IN WALL OF SIZE

7820
315MM X 315MM AT BOTTOM

40 x 92M2
OF OPENING EL + 6.100M
(FOR HVAC) MCC ROOM
XX

71.5m
3.8M X 8.2M

46.9m
COAL

51.9m
PRINTER
MCC ROOM DESK
500mt

TP-UT15
1000 3.8M X 8.3M

3m

6000
UP CAGE LADDER
3 ±0.00M LVL
12000 DOVE PLANT SAFETY
UP TREAD = 300mm
RISER = 175mm / 150mm
MCC
ROOM-1 C16C18
3.20m T2A T5A T5B
WIDTH = 1500mm
+48.750M FFL
1
NO. OF RISERS = 39NOS.
EYE WASH

1500
1
TOC A8 * STAIRCASE DETAIL AS PER DWG NO.
IES-PE-MU-UL-PDV-CS-GAD-020-040 (∅5.82m X 22.86m)

1000

PLC PANEL
UP

3000mt 3000mt 3000mt

3000
H

1500
SOAP NOODLES
±0.00M LVL +48.150M FFL FOR STEEL STAIRCASE
PALM KERNEL SHELL

UP
TOC
DETAILS REFER

RBDPO SPLIT CPO + HBPO HUL SPLIT CPO + HBPO HUL


A7 UP

ROAD-B
STRUCTURAL DRAWINGS
START POINT
350°
UP EL(+)3.500
START ANGEL

XX
(T.O.G.)
UP TROLLEY FOR

T12A T12B

6450
OFF SPEC

250
1100 NOODLE

300mt

25.1m
5445
(∅13.585m X 24.384m) (∅13.585m X 24.384m) (∅13.585m X 24.384m)

69555
REFINERY
2M WALL

P3

P3
2000mt 2000mt +47.700M LVL C12C14

7.5 M WIDE CONNECTING PASSAGE


200MM THICK
CL. OF PUMP ASA - D TANK 600MM HIGH

CL. OF PUMP
DISCHARGE G FRL DYKE WALL

DISCHARGE
(∅4.85m X 19.812m)

19.3m
STEARIC STEARIC

1370
INSTRUMENT AIR TIE-IN LOCATION
CL. OF PUMP CL. OF PUMP
DISCHARGE DISCHARGE A6

PLANT
00
Ø85
T13

11470
± 0.00M LVL

6 M WIDE INTERNAL ROAD


(FUTURE ) (FUTURE ) TOGS

ACID ACID
TOC. 47.70M
CL. OF PUMP
F 200MM THICK
BLOCK WALL UPTO
DISCHARGE

300mt PIPE RACK COMPRESSOR ROOM AT 0.0M LVL


BOTTOM OF STR. BEAM /
DECK SLAB ABOVE AT
3.50 M. LEVEL.
400MM WIDE
STORM WATER XX
(∅11.644m X 24.384m) (∅11.644m X 24.384m) HEAVY END
DYKE WALL

(1000TPD)
(BUHLER AT 3.5M FROM FFL) TRENCH WITH

32m
P3

P3
9500 X 7700 400MM WIDE

8020
300mt
MS GRATING(1:200) STORM WATER
TRENCH WITH
MS GRATING(1:200)

3m
A B (∅4.85m X 19.812m) 200mm THK LOADING / UNLOADING AREA RAMP
C12C14 NEW 2.5m WIDE PIPE RACK

1000
UP UP

9970
-0.450M LVL
(SLOPE 1:8)
GRADE SLAB

For all On Off Valve or Instrument at


± 0.00M LVL
8000

FRL
1500 FGL

(∅4.85m X 19.812m)
32m X 14m

P3

P3

2475
PUMP DRAWINGS
1
5250

1 AWAITED LOCKERS 14NOS.


A5 WC (EACH 300X450X450X4NOS.)

T7

DOOR
SERVICE
TREAD = 300mm
±0.00M LVL
3350 3000 5270 6000 2287 3713
1500 X 1000 SLIDING DOOR WITH WC

2287 3713 8380 4000 1 2 3 4 5 6 7 8 9


RISER = 175mm / 150mm WC
WIDTH = 1450mm
FFL SAMPLE 1300 X 1000 DUCT FEMALE ACCESS CONTROL 1500 X 1000 P U
NO. OF RISERS = 39NOS.
HOT ROOM RECEIVING 1000 X TOILET
FEMALE LOCKERS DUCT
1000 X N E X=538860.491
5550 X 5400 R T

LOCKER
* STAIRCASE DETAIL AS PER DWG NO.
STAIRCASE-2 Y

3000
WINDOW 2000
Y=346539.150
100mt
IES-PE-MU-UL-PDV-CS-GAD-020-040
3750 X 3800 2650 X 2200
(56 NOS.)
ASA - D TANK WC WC

LINEN CABINET
2100
1300 X 1000 1500 X 1000

MANUAL DRUM
MS CAGE STEP-1

CLEAN
200MM THICK LADDER
FIRE EXIT X=538799.764
LE D1
RISER-150MM
RAMP
SLIDING DOOR
X=538844.308
( FUTURE ) UP MALE TOILET
3500 1350

600MM HIGH PASSAGE TREAD-300MM


Y=346536.199

JANITOR
CHIMNEY

UP

SITTING
SITTING
E
FEMALE TOILET
Y=346533.957
CHIMNEY

(SLOPE 1:10) DYKE WALL LABORATORY TABLE 3250 X 3300 1100MM WIDE TEA /
COFEE 3950 X 3850

FILLING STATION A4
VENDING
CANOPY ABOVE
TOILET

(∅3.881m X 10.668m)
10

SERVER ROOM
46

P3

P3
P U 5.0M X 2.0M

LINEN CABINET
Area T-1017 (TF 2 FA)
2648

3440 X2615
C.P.
10

PLATFORM FOR

DIRTY
QUALITY TEST
2800X2925

00
46

10

(SLOPE 1:8)
500 2000 C.P. BREAK OUT AREA

85
MEETING ROOM ACCESS
PASSAGE 1350MM WIDE P U
46

25.9m
3150X2925

5.7m

RAMP
2985 x 3640 CONTROL
4550 M X 2925 M

Ø
DOOR

6085

5330
2 LOCKERS ACCESS FACTORY WORKERS

2000
SPECIAL ANALYSIS 9 NOS. CONTROL ENTRANCE
PASSAGE 1350MM WIDE

UP
LABORATORY TABLE DOOR

3.20m
WITH FUME HOOD
ID FAN

ID FAN

ID FAN

ID FAN

5.14m

1000 3750 X 3775

T10

8000
CL. OF PUMP CL. OF PUMP CL. OF PUMP MALE LOCKERS
CL. OF PUMP
DISCHARGE DISCHARGE (144 NOS.)
CONF. ROOM SPARE ROOM

DISCHARGE

230
DISCHARGE
5390 7000 X 6175M

JANITOR
100mt

1000

1000

(EACH 300X450X450X4NOS.)
SILO

(EACH 300X450X450X4NOS.)
MALE TOILET
OFFICE

LOCKERS 14 NOS.
12.3m
4650X4625

LOCKERS 13 NOS.
OPERATIONS

SITTING
SITTING

SITTING
SITTING
SLIDING DOOR

LE D2

P3

P3
ENTRY FOR
713 713 713 713 D

REPROGRAPHIC
11440 EQUIPMENT MOVEMENT OFFICE

20.1m

COUNTER
LABORATORY

FILING UNIT
5047

NIR & GC ROOM LABORATORY TABLE

SERVICE
X=538799.462
NEW BIOMASS

TABLE
GRIT ARRESTOR 45 CYC

GRIT ARRESTOR 45 CYC

GRIT ARRESTOR 45 CYC

GRIT ARRESTOR 45 CYC

(∅3.881m X 10.668m)

DOOR
3750 X 3800
LOBBY
HOT WATER Y=346530.207 CUTOUT IN WALL OF SIZE
454MM X204MM
CUTOUT IN WALL OF SIZE
454MM X204MM
WC
1500 X 1000 DUCT
REFRIGERATOR AT BOTTOM OF OPENING ±0.00M LVL

UP
SAND FOR AT BOTTOM OF OPENING 1000 X
EMERGENCY IN CASE EL.+ 3335 (FOR HVAC) EL.+ 3325 (FOR HVAC) FFL

NEW LOADING AREA


GENERATION SKID EMERGENCY EXIT OF SPILLAGE & FOAM
2200

5255
A3 WC

NEW 2.5m WIDE PIPE RACK


2.72m 6m
DETAILS AWAITED

P3

P3
1500 X 1000

17.49m 3m 6m 12.5m 6m
3200

TP-UT11
FROM VENDOR N2 H2 LPG H2
COMPRESS
AIR
HP BOILER

SPACE FOR

ACP CLADDING AS

45.1m
CYLINDER STANDBY TROLLEY
3 CYLINDER ON LINE
SLIDING DOOR

RCC BLOCK
ROSINK OIL PREHEATER

ROSINK OIL PREHEATER

ROSINK OIL PREHEATER

ROSINK OIL PREHEATER

6.5m
PER ELEVATION

WALL (TYP)
N2 N2
CYLINDER STANDBY
H2 3000 x 1000

+0.150M LVL

2.3m

450 HIGH
CL. OF PUMP

200 THK.
±0.00M LVL
CUTOUT IN WALL OF SIZE
24000

X=538844.008
3828

DISCHARGE 754MM X 754MM


CL. OF PUMP AT BOTTOM OF OPENING
C Y=346527.964

NEW THERMAL

(SLOPE 1:8)
15.3m
EL.+ 3325 (FOR HVAC)

5m
CL. OF PUMP

TOC
DISCHARGE SLOPE: 1:8

RAMP
DISCHARGE PLINTH PROTECTION

19.8m 1.5m

8000
2m
RAMP UP
2100

SLAB PROJECTION ABOVE

NEW 2.0M WIDE PIPE RACK


FUTURE AREA
P U
100mm THK PCC

F
10000

5850 500 X 400 BOXING WITH 500 X 400 BOXING WITH

200 150 ACP CLADDING AS PER -0.450M LVL CANOPY ABOVE ACP CLADDING AS PER

(1000KVA, 400V)
APPROVED SHOP APPROVED SHOP
FGL 8.8M X 4.4M

P3

P3
4300 1000 DRAWINGS DRAWINGS

DG + SYNCH PANEL

NEW 1.0M WIDE PIPE RACK


DG-1
33350

TRANSFORMER-01
OIL HEATER PLANT
4000

20KV/0.420KV
MS GRILL AS PER

GATE-3
GATE

OE1
6075
& GATE
CANOPY ABOVE A2

2MVA
11340
-0.450M LVL
7519

C OFCL TRANSFO.
APPROVED
34655
28M X 41M

ROAD-E
FGL
OF TRANSFO.

(12800 x 4000) MAIN ENTRANCE


CONTROL ROOM

SPECIFICATIONS

6m
10000

5860
10M WIDE INTERNAL ROAD

5860

(1000KVA, 400V)

10m
ROAD-H
HOLD

7710
2M WALL

FORMED GR. LVL


Ø3000

GATE-4

DG-2
26" COOLING WATER 300mm THK
4000

E
NITROGEN

41x74 M2
SUPPLY AND RETURN LINE
T.O.H #1

T.O.H #2

T.O.H #3

T.O.H #4

18.4m
GRADE SLAB
4000 3350 3000 TANK
LAB

P3

P3

-0.45M FGL
N2 INDUSTRIAL GRED TIE-IN LOCATION

LV PANEL ROOM

TRANSFORMER-02
COOLING TOWER - DOVE
COOLING TOWER - FUTURE

20KV/0.420KV
3000 2209

PMH PMH

2MVA
PMCC
EXPANSION

UPS-2
GATE

GATE-2
6000
& GATE
L

(1000KVA, 400V)
B
L

1200
C OF TRANSFO.

2M WALL NEW 1.5M WIDE PIPE RACK 300Ø PWP PIPE U/G

DG-3

OE1
A1
4000
(10m X 20m)

24150
T11A T11B

UPS-1
100mt 100mt T15A T15B T15C
MAIN PLANT

D
NEW GLY LOADING AREA

5.4m
FILTERED WATER TIE-IN LOCATION
99C16FA 99C16FA

1825
500mt 500mt 500mt

For Blanketing Tank T-1017 (At TF 2 FA)


P3

P3
M

5.2m 2m 7.5m

TRANSFORMER-03
C'
DFA BLEND DFA BLEND DFA BLEND
30m
(∅3.881m X 10.668m)(∅3.881m X 10.668m)
SUBSTATION - DOVE

(FUTURE)
11620 6000 6000 6000 12380

UP

GATE-1
2700
UP UP
(∅5.82m X 22.86m) (∅5.82m X 22.86m) (∅5.82m X 22.86m) 300Ø RCC PIPE U/G
6897

UP
4.5m
6000

NEW 1.0M WIDE PIPE RACK (SLOPE 1:300)

21.3m
C

CHARGER &

2.0M WIDE INTERNAL ROAD


BATTERY
17.6m
1. COMPRESS AIR 1"

12.4m

DCDB
2. SOFTEN WATER 1"

1425
3. LOW STEAM 1"

15000 1000 4. NITROGEN FLUSHING 1"

+0.00M LVL
P2
T22A T22B

B
27.3m
1. HOT WATER SUPPLY 2"

MV PANEL
2. HOT WATER RETURN 2"
3. NITROGEN FLUSHING 1" SLOPE: 1:8
4. NITROGEN BLANKETING 2"

Pak Sahab Data : Existing DN80 (5 barg)

ROOM

FUTURE
FUTURE
5. INSTRUMEN AIR 1" RAMP UP

P2

FFL
FIRE PUMP HOUSE

Pak Sahab Data : Existing DN50 (3 ~ 5 barg)


HEADER IA

1000mt 1000mt

-0.45M LVL

9.4m
1910

P2

P2

SOAK

6.2m
EXPANSION TANK

OIL

PIT
DRAIN TANK
3500

FRL
4000

5575
HT PANEL
USP GLY. USP GLY.

6125
50 CBM
FIRE PUMP HOUSE
20 CBM

2.8m
T-819 T-818
PUMPS (∅7.763m X 24.384m) (∅7.763m X 24.384m)
5090

(FUTURE)
23.4m

A
8050 6335
18.1m 6m
SLOPE: 1:8

HEADER RETURN HEADER SUPPLY


RAMP UP

NEW 2.5M WIDE PIPE RACK NEW 2.5M WIDE PIPE RACK
9500 1 1' 2

TP-UT08 61.1m
5.1m 800 4800
12675
7075

2.4m
FILTER
PUMP
G
FILTER
WATER TANK WATER TANK
ROOM
MCC 7, MCC 3, TP-UT14

3'

1
3
+47.70M +48.00M

WB-
FFL

WB-12
FGL

ISR
WB-12 12
ISRAEL MOT
2005 (IL) AEL
MO

6M WIDE INTERNAL ROAD


WB-12
ROAD-C MCC 4.1 &

6m
6m

T 200 F

3.3m
ISRAEL MOT 2005 (IL) ISRAEL MOT 2005 (IL)
FA REFINERY
ROAD-C 5 (IL
)

&
47.70m
UP

LOCKER ROOM RAW & FIRE RAW & FIRE


MCC / CONTROL ROOM
+48.00M
FFL

SOFT WATER
T27 MCC 4.2

4.6m
C12C18FA TIE-IN LOCATION
500mt
P2

WATER TANK WATER TANK SOFT WATER


NEW 2.5M WIDE PIPE RACK NEW 2.5M WIDE PIPE RACK
(M2)
UP

TANK
P2

SOFT. WATER
UP

TANK E

FA DISTILLATION & FRACTIONATION


P2

P2
3.48m

DIA THERMIC OIL DRAIN TANK UP


(∅5.82m X 22.86m)

3.5m
+47.80M
2548.6440

15m X 20m
FPL

W=4500
H=4500

(C12C18 FA Transfer from TK-1014A/B


P1

P1

WALKWAY D

T-1017
4m 6m 8.5m THERMAL OIL DRAIN TANK HOUSE SOFT WATER SOFT WATER
2.6m T25 TANK TANK
FAT SPLITTING &
+47.950M LVL
FFL
CL. OF PUMP
DISCHARGE
ACID SEWER WTP
5m 1000mt
SYSTEM C
LC DEAERATOR

Via Pump P-1014A/B To Sunshine TF)


P1

P1

TRENCH

DEMIN WATER TIE-IN LOCATION


EYE WASH/SHOWER HAND
METAL GRATING

6M WIDE INTERNAL ROAD


WASH

DIESEL STORAGE TANKS Option 1 GLYCERINE PROCESSING RAW WATER


(∅7.763m X 24.384m) DM/RO
P1

P1

NEW 1.0M WIDE PIPE RACK


P2 E1 P2 P3 P3 P1 HAND
DM/RO B
(NEW RELOCATION)
E1 A

WASH

PLANT
NEW 2.5M WIDE PIPE RACK

WATER TANK WATER TANK


Option 2 CHEMICAL STORAGE

FATTY ACID PLANT

NEW 3.0M WIDE PIPE RACK


CL. OF PUMP ROOM

(41m X 12m)
DISCHARGE TRENCH +47.950M LVL
P1
P1

Pak Sahab Data : Existing DN50 (XX barg)


TOC. 47.70M P3 P3 FFL
P2 P2 A

P1
+48.00M
FFL
E1 E1

(48m X 22m)
CL. OF PUMP
DISCHARGE

PLANT

6M INTERNAL RING ROAD


A

TP-PR08
P1

P1

MCC ROOM

UP
NEW 2.5m WIDE PIPE RACK
5m

FFL
+48.00M
TRENCH

COOLING TOWER

CONTROL
ACID SEWER

ROOM
SYSTEM
50.77m

C12C18FA TIE-IN LOCATION

P1
P1
METAL GRATING

(BIGLEAP)
TP-PR13

UP
1.5m
P1

P1

+49.150M LVL

5.9m EXISTING
20.1m

P1

P1
7m FAT TRAP FA
Ø400.0000 Ø400.0000

Ø400.0000

CATALYST
LOADING (2.5m x 6m)

(C12C18 FA Transfer from TK-1010A/B

P1

P1
23m
2710.2764

AREA
UP
P1

P1

GROUND

6.8m
HSD DAY TANK WATER

5.8m
34.6802

Ø1000.0000

Ø1200.0000 Ø1200.0000

UP

Ø2000.0000 Ø2000.0000
CL. OF PUMP
DISCHARGE
CL. OF PUMP
CL. OF PUMP
DISCHARGE
CL. OF PUMP
72m TANK

Via Pump P-1010A/B To Sunshine TF)


1N 1U 1V
P1 1W
CL. OF PUMP DISCHARGE
DISCHARGE DISCHARGE

2U 2V 2W
P1

P1

P1 A

P1 A

P1 P3 P3 A

P1 A

P1 A

P1 A

P1 A A A A
A A A A VALVE PIT
Ø1600.0000 CABLE TRENCH A A

(TYP.)

NEW CHP
Ø1600.0000

3M WIDE PAVED ROAD

6m
W=6000

8.9m
H=4500
P1

P1

COOLING TOWER -BIGLEAP


A

P1 A

P1 A

P1 P3 P3 A

P1 A

P1 A

P1 A

P1 A A A A A A
A A

A A

BIG LEAP DCS & MARVEL 2 DCS &


25x40 M2
CL. OF PUMP
DISCHARGE
CL. OF PUMP
DISCHARGE

PANEL CONTROL ROOM PANEL CONTROL ROOM

P1

P1
NEW 2.5m WIDE PIPE RACK
FUTURE ROAD
TP-PR07
P1

P1

A A
P1

P1

E1 P2 E1 P2 P3 P3 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1

2m
A A
P1

P1

P2 P2 P3 P3 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1 P1
E1

3m

3m
E1
A A

+47.700M LVL
UP 2M WIDE PAVED ROAD
P1

P1

FGL

1.5M WIDE PAVED PATHWAY

6.2m
A A

2HR FIRE RATED


DOOR
6 M WIDE INTERNAL ROAD

150MM HIGH KERB WALL

SLOPE : 1:8
TANKFARM
UP OPERATOR / NITROGEN MCC ROOM

RAMP UP
EQUIPMENT MANUAL TOILET
RACK
EWS CONTROL SHIFT INCHARGE +48.150M LVL WIDTH = 1000MM
50mt 200 THK.
A A
P1

P1

DESK ROOM PRAYER FFL UP TREAD = 250MM


P-1001A

P-1001B

TREAD = 250 MM 1.50X3.54M


FIRE RATED
7.50m

RISER = 150.00MM RISER = 150MM WALL


400x2000MM INSTRU
BOILER ROOM WALL CUTOUT EWC
@50MM FROM FFL 1.4X1.2M
BOILER +48.150M LVL
FEED PUMPS FFL
GLASS CONTROL ROOM SERVER
RC PEDE STAL FOR PARTITION +48.750M LVL
BOILER (GAS FIRED) MCC

2NOS X 750MM WIDE CABINET

1&2
ABLUTION EWC
DETAILS REFER VERTICAL CABLE TRAY FFL 1.5X0.9M 1.4X1.2M MAC
STRUCTURAL DWGS. +48.150M LVL
WITH SUPPORTS
N2 PLANT MCC
P1

P1

+48.150M LVL
FGL. 0.000M DCS PANEL UPS FFL
FFL

UTILITY SPACE / BOILER HOUSE


A A

FOR DETAILS
REFER
D-3 +47.850M LVL
200MM THK BLOCK FFL
MECHANICAL
SAMPLE STORE
15m

WALL UPTO 3400MM


DWGS. D-2 D-1 HEIGHT +48.150M LVL MAC
P3

P3

300MM WIDE TRENCH 300MM WIDE TRENCH FFL K111


A A

WITH MS GRATING WITH MS GRATING (1:300 200MM THK BLOCK


P1

P1

(BIGLEAP)
SLOPE) WALL UPTO 3400MM

ELEC. TRAC. MCC


TANKFARM-1&2

900x2000MM ELECTRICAL HEIGHT


COMPRESSOR ROOMWALL CUTOUT
LV MCC-04

FUTURE
EL. 13.283M
TANK +48.150M LVL @4605MM FROM FFL SECTION A SECTION B SECTION C SECTION D TRANSFORMER - 1

WITH ENGINEERING STORE &


FFL
MCC -1
PLATFORM EL. 13.900M RC PED ESTAL FOR CHEMICAL STORE
COMPRESSOR MCC

TYP.
DETAILS REFER MAC

NEW 2.5M WIDE PIPE RACK


+48.150M LVL
ROAD-A

STRUCTURAL DWGS.
MCC -2 K112

T1A T1C
FFL
TK-1001A
TK-1001D
NEW 2.5M WIDE PIPE RACK

RAW WATER TIE-IN LOCATION


SECTION A SECTION B SECTION C SECTION D 47.700 M LVL
BOILER CONTROL

1.5M WIDE PAVED PATHWAY


ROOM MAIN PLANT
CONTROL PANEL

WORKSHOP
+48.150M LVL
+48.150M
AC-1 FFL OFFICE/UTILITY
SUBSTATION
FFL AC-2 AC-3
2000X600MM 2000X600MM 48.150 M
CONTROL DESK
A A

+48.150M LVL WALL CUTOUT WALL CUTOUT


P1

P1

2010X610MM HVAC FFL


EL. 13.283M 2710X810MM HVAC 1110X810MM HVAC FFL HVAC @ 3145MM HVAC @ 4145MM MAC

15000mt 15000mt
1810X810MM HVAC WALL CUTOUT@ WALL CUTOUT WALL CUTOUT FROM FFL FROM FFL
(TYP.) WALL CUTOUT 4145MM FROM FFL @ 55MM FROM FFL K113
@ 55MM FROM FFL @ 55MM FROM FFL
X 150MM HIGH KERB WALL
TRANSFORMER - 2
TOS. 2.200M
P-1000A 47.700 M LVL
(TYP.)

SLOPE 1:8
RAMP
STEPS-4 (TYPICAL) 475MM Ø HVAC WALL CUTOUT STEPS-2 (TYPICAL)

SLOPE 1:8
SLOPE 1:8

SLOPE 1:8

SLOPE 1:8

SLOPE 1:8

WIDTH = 3000MM @ 5540MM FROM FFL (TYP) WIDTH = 1500MM


UP UP UP UP

CPO CPO
UP

Pak Sahab Data : Existing DN150 (3 barg)


P-1000B TREAD = 300MM TREAD = 300MM
RAMP

RAMP

RAMP

RAMP

RAMP
RISER = 150MM RISER = 150MM STEPS-1 (TYPICAL)
WIDTH = 3000MM
LADDER
MONKEY

TREAD = 300MM
RISER = 150MM
P-1000C

4M WIDE INTERNAL ROAD


A A
P1

P1

X ENTRY ENTRY ENTRY ENTRY


1 2 3 3' 4 4' 5 6

TRANSFORMER - 3

(∅30.080m X 24.384m) (∅30.080m X 24.384m)

You might also like