FIT - UP INSPECTION REPORT

Report No : 33/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10


Date : 14/06/2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/05 Client : PERTAMINA RU VII
Job Item : RAFTER Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 RAFTER RF1 fillet 6/10/2017 6mm SMAW - - - Acc -

12-WPS-AWS-JKB-2014
A.36
2 RAFTER RF2 fillet A.36 6/10/2017 6mm SMAW - - - Acc -
3 RAFTER RF3 fillet A.36 6/10/2017 6mm SMAW - - - Acc -
4 RAFTER RF4 fillet A.36 6/10/2017 6mm SMAW - - - Acc -
5 RAFTER RF5 fillet A.36 6/10/2017 6mm SMAW - - - Acc -
6 RAFTER RF6 fillet A.36 6/10/2017 6mm SMAW - - - Acc -
7 RAFTER RF7 fillet A.36 6/10/2017 6mm SMAW - - - Acc -
8 RAFTER RF8 fillet A.36 6/10/2017 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 32/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 14/06/2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/05 Client : PERTAMINA RU VII
Job Item : RAFTER Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 RAFTER RF9 fillet 6/10/2017 6mm SMAW - - - Acc -

12-WPS-AWS-JKB-2014
A.36
2 RAFTER RF10 fillet A.36 6/11/2017 6mm SMAW - - - Acc -
3 RAFTER RF11 fillet A.36 6/11/2017 6mm SMAW - - - Acc -
4 RAFTER RF12 fillet A.36 6/11/2017 6mm SMAW - - - Acc -
5 RAFTER RF13 fillet A.36 6/11/2017 6mm SMAW - - - Acc -
6 RAFTER RF14 fillet A.36 6/11/2017 6mm SMAW - - - Acc -
7 RAFTER RF15 fillet A.36 6/11/2017 6mm SMAW - - - Acc -
8 RAFTER RF16 fillet A.36 6/11/2017 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 31/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 3/07/2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/10 Client : PERTAMINA RU VII
Job Item : BTTOM SUMP Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 BTTOM SUMP Bs.1 Fillet Joint A.283 30/06/2017 8mm/6mm SMAW - - - Acc -

008-ASME-JKB-IV/10
,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by
PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 32/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 3-08-2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/11 Client : PERTAMINA RU VII
Job Item : ROOF MANHOLE 24'' Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 NECK TO FLANGE RM.1 FILLET 8/2/2017 6mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
A.36

flange

Neck
,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by
PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 33/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 3-08-2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM21 Client : PERTAMINA RU VII
Job Item : FLOAT WELL 21'' Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 NECK TO FLANGE FW.1 FILLET 8/2/2017 6mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
A.36

flange

Neck

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 30/FIR/JKB/QA-AC/VI/2017 Project N : OVERHAUL TANK 5-T-10
Date : 2/07/2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : WIND GIRDER Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 WIND GIRDER. WG1 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -

12-WPS-AWS-JKB-2014
WG2 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -
WG3 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -
WG4 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -
WG5 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -
WG6 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -
WG7 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -
WG8 Fillet Joint A.36 30/06/2017 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 28/FIR/JKB/QA-AC/VI/2017 Project N : OVERHAUL TANK 5-T-10
Date : 29/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 7 In side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 7 to Shell 8 H7PL1 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 7 to Shell 8 H7PL2 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -
3 Shell 7 to Shell 8 H7PL3 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -
4 Shell 7 to Shell 8 H7PL4 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -
5 Shell 7 to Shell 8 H7PL5 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -
6 Shell 7 to Shell 8 H7PL6 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -
7 Shell 7 to Shell 8 H7PL7 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc -
8 Shell 7 to Shell 8 H7PL8 Butt Joint A.283 Gr.c 27/6/17 SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 29/FIR/JKB/QA-AC/VI/2017 Project N : OVERHAUL TANK 5-T-10
Date : 29/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 7 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 7 to Shell 8 H7PL1 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
2 Shell 7 to Shell 8 H7PL2 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc
3 Shell 7 to Shell 8 H7PL3 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc
4 Shell 7 to Shell 8 H7PL4 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc
5 Shell 7 to Shell 8 H7PL5 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc
6 Shell 7 to Shell 8 H7PL6 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc
7 Shell 7 to Shell 8 H7PL7 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc
8 Shell 7 to Shell 8 H7PL8 Butt Joint A.283 Gr.c 27/6/17 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 27/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 29/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 6 In side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 6 to Shell 7 H6PL1 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
2 Shell 6 to Shell 7 H6PL2 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc
3 Shell 6 to Shell 7 H6PL3 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc
4 Shell 6 to Shell 7 H6PL4 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc
5 Shell 6 to Shell 7 H6PL5 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc
6 Shell 6 to Shell 7 H6PL6 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc
7 Shell 6 to Shell 7 H6PL7 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc
8 Shell 6 to Shell 7 H6PL8 Butt Joint A.283 Gr.c 23/617 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 26/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 29/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 6 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 6 to Shell 7 H6PL1 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 6 to Shell 7 H6PL2 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -
3 Shell 6 to Shell 7 H6PL3 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -
4 Shell 6 to Shell 7 H6PL4 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -
5 Shell 6 to Shell 7 H6PL5 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -
6 Shell 6 to Shell 7 H6PL6 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -
7 Shell 6 to Shell 7 H6PL7 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -
8 Shell 6 to Shell 7 H6PL8 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 25/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 21/06/2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 5 In side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 5 to Shell 6 H5PL1 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
2 Shell 5 to Shell 6 H5PL2 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc
3 Shell 5 to Shell 6 H5PL3 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc
4 Shell 5 to Shell 6 H5PL4 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc
5 Shell 5 to Shell 6 H5PL5 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc
6 Shell 5 to Shell 6 H5PL6 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc
7 Shell 5 to Shell 6 H5PL7 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc
8 Shell 5 to Shell 6 H5PL8 Butt Joint A.283 Gr.c 6/21/2017 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 24/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 21/06/2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 5 out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 5 to Shell 6 H5PL1 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 5 to Shell 6 H5PL2 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -
3 Shell 5 to Shell 6 H5PL3 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -
4 Shell 5 to Shell 6 H5PL4 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -
5 Shell 5 to Shell 6 H5PL5 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -
6 Shell 5 to Shell 6 H5PL6 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -
7 Shell 5 to Shell 6 H5PL7 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -
8 Shell 5 to Shell 6 H5PL8 Butt Joint A.283 Gr.c 6/20/2017 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 23/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 4 in side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 4 to Shell 5 H4PL1 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 4 to Shell 5 H4PL2 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -
3 Shell 4 to Shell 5 H4PL3 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -
4 Shell 4 to Shell 5 H4PL4 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -
5 Shell 4 to Shell 5 H4PL5 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -
6 Shell 4 to Shell 5 H4PL6 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -
7 Shell 4 to Shell 5 H4PL7 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -
8 Shell 4 to Shell 5 H4PL8 Butt Joint A.283 Gr.c 11/6/2017 8mm/6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 22/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 4 out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 4 to Shell 5 H4PL1 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc

008-ASME-JKB-IV/10
2 Shell 4 to Shell 5 H4PL2 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc
3 Shell 4 to Shell 5 H4PL3 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc
4 Shell 4 to Shell 5 H4PL4 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc
5 Shell 4 to Shell 5 H4PL5 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc
6 Shell 4 to Shell 5 H4PL6 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc
7 Shell 4 to Shell 5 H4PL7 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc
8 Shell 4 to Shell 5 H4PL8 Butt Joint A.283 Gr.c 10/6/2017 8mm/6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 20/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 3 in side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 3 to Shell 4 H3PL1 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 3 to Shell 4 H3PL2 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -
3 Shell 3 to Shell 4 H3PL3 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -
4 Shell 3 to Shell 4 H3PL4 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -
5 Shell 3 to Shell 4 H3PL5 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -
6 Shell 3 to Shell 4 H3PL6 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -
7 Shell 3 to Shell 4 H3PL7 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -
8 Shell 3 to Shell 4 H3PL8 Butt Joint A.283 Gr.c 10/6/17 8 mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 21/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 3 out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 3 to Shell 4 H3PL1 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc

008-ASME-JKB-IV/10
2 Shell 3 to Shell 4 H3PL2 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc
3 Shell 3 to Shell 4 H3PL3 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc
4 Shell 3 to Shell 4 H3PL4 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc
5 Shell 3 to Shell 4 H3PL5 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc
6 Shell 3 to Shell 4 H3PL6 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc
7 Shell 3 to Shell 4 H3PL7 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc
8 Shell 3 to Shell 4 H3PL8 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 18/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 2 out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 2 to Shell 3 H2PL1 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc

008-ASME-JKB-IV/10
2 Shell 2 to Shell 3 H2PL2 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc
3 Shell 2 to Shell 3 H2PL3 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc
4 Shell 2 to Shell 3 H2PL4 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc
5 Shell 2 to Shell 3 H2PL5 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc
6 Shell 2 to Shell 3 H2PL6 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc
7 Shell 2 to Shell 3 H2PL7 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc
8 Shell 2 to Shell 3 H2PL8 Butt Joint A.283 Gr.c 8/6/17 8 mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 19/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 2 In side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 2 to Shell 3 H2PL1 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 2 to Shell 3 H2PL2 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -
3 Shell 2 to Shell 3 H2PL3 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -
4 Shell 2 to Shell 3 H2PL4 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -
5 Shell 2 to Shell 3 H2PL5 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -
6 Shell 2 to Shell 3 H2PL6 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -
7 Shell 2 to Shell 3 H2PL7 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -
8 Shell 2 to Shell 3 H2PL8 Butt Joint A.283 Gr.c 9/6/17 8 mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 17/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 1 In side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 1 to Shell 2 H1PL1 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc

008-ASME-JKB-IV/10
Shell 1 to Shell 2 H1PL2 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc
Shell 1 to Shell 2 H1PL3 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc
Shell 1 to Shell 2 H1PL4 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc
Shell 1 to Shell 2 H1PL5 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc
Shell 1 to Shell 2 H1PL6 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc
Shell 1 to Shell 2 H1PL7 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc
Shell 1 to Shell 2 H1PL8 Butt Joint A.283 Gr.c 10/6/17 10mm/8mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 16/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 11/6/17 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : HORIZONTAL 1 out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Shell 1 to Shell 2 H1PL1 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -

008-ASME-JKB-IV/10
2 Shell 1 to Shell 2 H1PL2 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -
3 Shell 1 to Shell 2 H1PL3 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -
4 Shell 1 to Shell 2 H1PL4 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -
5 Shell 1 to Shell 2 H1PL5 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -
6 Shell 1 to Shell 2 H1PL6 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -
7 Shell 1 to Shell 2 H1PL7 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -
8 Shell 1 to Shell 2 H1PL8 Butt Joint A.283 Gr.c 9/06/2017 10mm/8mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 14/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 27/06/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 8 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 8 PL1 To PL2 V1 Butt Joint 23/6/17 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 8 PL2 To PL3 V2 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc
3 SHELL 8 PL3 To PL4 V3 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc
4 SHELL 8 PL4 To PL5 V4 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc
5 SHELL 8 PL5 To PL6 V5 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc
6 SHELL 8 PL6 To PL7 V6 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc
7 SHELL 8 PL7 To PL8 V7 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc
8 SHELL 8 PL8 To PL1 V8 Butt Joint A.283 Gr.c 23/6/17 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 15/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 27/06/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 8 IN side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 8 PL1 To PL2 V1 Butt Joint 27/06/2017 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 8 PL2 To PL3 V2 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc
3 SHELL 8 PL3 To PL4 V3 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc
4 SHELL 8 PL4 To PL5 V4 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc
5 SHELL 8 PL5 To PL6 V5 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc
6 SHELL 8 PL6 To PL7 V6 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc
7 SHELL 8 PL7 To PL8 V7 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc
8 SHELL 8 PL8 To PL1 V8 Butt Joint A.283 Gr.c 27/06/2017 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 11/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 23/6/17 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 7 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 7 PL1 To PL2 V1 Butt Joint 21/6/17 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 7 PL2 To PL3 V2 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc
3 SHELL 7 PL3 To PL4 V3 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc
4 SHELL 7 PL4 To PL5 V4 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc
5 SHELL 7 PL5 To PL6 V5 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc
6 SHELL 7 PL6 To PL7 V6 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc
7 SHELL 7 PL7 To PL8 V7 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc
8 SHELL 7 PL8 To PL1 V8 Butt Joint A.283 Gr.c 21/6/17 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 12/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 23/6/17 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 7 IN side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 7 PL1 To PL2 V1 Butt Joint 22/6/17 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 7 PL2 To PL3 V2 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc
3 SHELL 7 PL3 To PL4 V3 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc
4 SHELL 7 PL4 To PL5 V4 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc
5 SHELL 7 PL5 To PL6 V5 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc
6 SHELL 7 PL6 To PL7 V6 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc
7 SHELL 7 PL7 To PL8 V7 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc
8 SHELL 7 PL8 To PL1 V8 Butt Joint A.283 Gr.c 22/6/17 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 09/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 14/06/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 6 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 6 PL1 To PL2 V1 Butt Joint 14/06/2017 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 6 PL2 To PL3 V2 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
3 SHELL 6 PL3 To PL4 V3 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
4 SHELL 6 PL4 To PL5 V4 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
5 SHELL 6 PL5 To PL6 V5 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
6 SHELL 6 PL6 To PL7 V6 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
7 SHELL 6 PL7 To PL8 V7 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
8 SHELL 6 PL8 To PL1 V8 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 10/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 14/06/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 6 IN side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 6 PL1 To PL2 V1 Butt Joint 14/06/2017 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 6 PL2 To PL3 V2 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
3 SHELL 6 PL3 To PL4 V3 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
4 SHELL 6 PL4 To PL5 V4 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
5 SHELL 6 PL5 To PL6 V5 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
6 SHELL 6 PL6 To PL7 V6 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
7 SHELL 6 PL7 To PL8 V7 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc
8 SHELL 6 PL8 To PL1 V8 Butt Joint A.283 Gr.c 14/06/2017 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 07/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 12/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 5 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 5 PL1 To PL2 V1 Butt Joint 12/06/2017 6mm SMAW - - - Acc -

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 5 PL2 To PL3 V2 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -
3 SHELL 5 PL3 To PL4 V3 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -
4 SHELL 5 PL4 To PL5 V4 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -
5 SHELL 5 PL5 To PL6 V5 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -
6 SHELL 5 PL6 To PL7 V6 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -
7 SHELL 5 PL7 To PL8 V7 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -
8 SHELL 5 PL8 To PL1 V8 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 08/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 12/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 5 IN side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 5 PL1 To PL2 V1 Butt Joint 12/06/2017 6mm SMAW - - - Acc

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 5 PL2 To PL3 V2 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc
3 SHELL 5 PL3 To PL4 V3 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc
4 SHELL 5 PL4 To PL5 V4 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc
5 SHELL 5 PL5 To PL6 V5 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc
6 SHELL 5 PL6 To PL7 V6 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc
7 SHELL 5 PL7 To PL8 V7 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc
8 SHELL 5 PL8 To PL1 V8 Butt Joint A.283 Gr.c 12/06/2017 6mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 05/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 10/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 4 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 4 PL1 To PL2 V1 Butt Joint 6/12/2017 8mm SMAW - - - Acc -

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 4 PL2 To PL3 V2 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -
3 SHELL 4 PL3 To PL4 V3 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -
4 SHELL 4 PL4 To PL5 V4 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -
5 SHELL 4 PL5 To PL6 V5 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -
6 SHELL 8 PL6 To PL7 V6 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -
7 SHELL 4 PL7 To PL8 V7 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -
8 SHELL 4 PL8 To PL1 V8 Butt Joint A.283 Gr.c 6/12/2017 8mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 04/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 10/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 3 IN side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 3 PL1 To PL2 V1 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
2 SHELL 3 PL2 To PL3 V2 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
3 SHELL 3 PL3 To PL4 V3 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
4 SHELL 3 PL4 To PL5 V4 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -

008-ASME-JKB-IV/10
5 SHELL 3 PL5 To PL6 V5 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
6 SHELL 3 PL6 To PL7 V6 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
7 SHELL 3 PL7 To PL8 V7 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
8 SHELL 3 PL8 To PL1 V8 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 03/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 10/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 3 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 3 PL1 To PL2 V1 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
2 SHELL 3 PL2 To PL3 V2 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
3 SHELL 3 PL3 To PL4 V3 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
4 SHELL 3 PL4 To PL5 V4 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -

008-ASME-JKB-IV/10
5 SHELL 3 PL5 To PL6 V5 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
6 SHELL 3 PL6 To PL7 V6 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
7 SHELL 3 PL7 To PL8 V7 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -
8 SHELL 3 PL8 To PL1 V8 Butt Joint A.283 Gr.c 6/2/2017 8mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 02/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 10/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 2 IN side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 2 PL1 To PL2 V1 Butt Joint 9/6/17 8mm SMAW - - - Acc -

008-ASME-JKB-IV/10
A.283 Gr.c
2 SHELL 2 PL2 To PL3 V2 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -
3 SHELL 2 PL3 To PL4 V3 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -
4 SHELL 2 PL4 To PL5 V4 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -
5 SHELL 2 PL5 To PL6 V5 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -
6 SHELL 2 PL6 To PL7 V6 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -
7 SHELL 2 PL7 To PL8 V7 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -
8 SHELL 2 PL8 To PL1 V8 Butt Joint A.283 Gr.c 9/6/17 8mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 001/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 10/6/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : SHELL 2 Out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SHELL 2 PL1 To PL2 V1 Butt Joint A.283 Gr.c 5/30/2017 8mm SMAW - - - Acc
2 SHELL 2 PL2 To PL3 V2 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc
3 SHELL 2 PL3 To PL4 V3 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc
4 SHELL 2 PL4 To PL5 V4 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc

008-ASME-JKB-IV/10
5 SHELL 2 PL5 To PL6 V5 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc
6 SHELL 2 PL6 To PL7 V6 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc
7 SHELL 2 PL7 To PL8 V7 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc
8 SHELL 2 PL8 To PL1 V8 Butt Joint A.283 Gr.c 5/31/2017 8mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 011/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 16-06-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/02 Client : PERTAMINA RU VII
Job Item : LONG SHEAM Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Bottom LS1 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
LS2 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc

13-WPS-ASME-JKB-14
LS3 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
LS4 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
LS5 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
LS6 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
LS7 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
LS8 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 011A/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 16-06-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/02 Client : PERTAMINA RU VII
Job Item : SHORT SEAM Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Bottom SS1 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS2 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc

008-ASME-JKB-IV/10
SS3 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS4 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS5 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS6 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS7 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS8 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS9 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc
SS10 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 011B/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 16-06-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/02 Client : PERTAMINA RU VII
Job Item : Bottom Short Seam Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Bottom SS11 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS12 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
SS13 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS14 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS15 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS16 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS17 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS18 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS19 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -
SS20 FILLET A.283 Gr.c 5/23/2017 8mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 23/FIRR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 13/06/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/02 Client : PERTAMINA RU VII
Job Item : Corneer out side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Corneer Bottom CR1 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -

15-WPS-ASME-JKB-2017
2 Corneer Bottom CR2 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -
3 Corneer Bottom CR3 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -
4 Corneer Bottom CR4 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -
5 Corneer Bottom CR5 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -

10mm

Corneer Joint

8mm

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 22/FIRR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 23/05/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/02 Client : PERTAMINA RU VII
Job Item : Corneer In side Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Corneer Bottom CR1 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -

15-WPS-ASME-JKB-2017
2 Corneer Bottom CR2 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -
3 Corneer Bottom CR3 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -
4 Corneer Bottom CR4 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -
5 Corneer Bottom CR5 T.Joint A.283 Gr.c 5/23/2017 8mm,10mm SMAW - - - Acc -

10mm

Corneer Joint

8mm

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 36/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 31-07-2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/17 Client : PERTAMINA RU VII
Job Item : GAUGE/GAGE POLE 8'' Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 PLANGE TO PIPE 1 butt Joint 7/30/2017 8'' SMAW - - - Acc -

008-ASME-JKB-IV/10
A.36
2 PIPE TO PIPE 2 butt Joint A.36 7/30/2017 8'' SMAW - - - Acc -
3 PIPE TO PIPE 3 butt Joint A.36 7/30/2017 8'' SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 37/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 31-07-2017 Location : Field Kasim
Drawing No : T-CO/RU-VII/KSM/15 Client : PERTAMINA RU VII
Job Item : SILLING WELL ATG 8'' Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 PLANGE TO PIPE 1 butt Joint 7/30/2017 8'' SMAW - - - Acc -

008-ASME-JKB-IV/10
A.36
2 PIPE TO PIPE 2 butt Joint A.36 7/30/2017 8'' SMAW - - - Acc -
3 PIPE TO PIPE 3 butt Joint A.36 7/30/2017 8'' SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 38/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10 & 5-T-10
Date : 31-07-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/15 Client : PERTAMINA RU VII
Job Item : HOUSING TEMP. ATG 2'' Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 PLANGE TO PIPE 1 butt Joint A.36 7/30/2017 40 sch SMAW - - - Acc -

008-ASME-JKB-IV/10
2 PIPE TO PIPE 2 butt Joint A.36 7/30/2017 40 sch SMAW - - - Acc -
3 PIPE TO PIPE 3 butt Joint A.36 7/30/2017 40 sch SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 31/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/06 Client : PERTAMINA RU VII
Job Item : Short Seam Upper deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Short Seam Upper deck SS1 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
2 Short Seam Upper deck SS2 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
3 Short Seam Upper deck SS3 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
4 Short Seam Upper deck SS4 fillet A.283 Gr.c 2/9/17 5mm SMAW - - - Acc -
5 Short Seam Upper deck SS5 fillet A.283 Gr.c 4/9/17 5mm SMAW - - - Acc -
6 Short Seam Upper deck SS6 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
7 Short Seam Upper deck SS7 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 32/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/06 Client : PERTAMINA RU VII
Job Item : Short Seam Upper deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Short Seam Upper deck SS8 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
2 Short Seam Upper deck SS9 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
3 Short Seam Upper deck SS10 fillet A.283 Gr.c 2/9/17 5mm SMAW - - - Acc -
4 Short Seam Upper deck SS11 fillet A.283 Gr.c 4/9/17 5mm SMAW - - - Acc -
5 Short Seam Upper deck SS12 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
6 Short Seam Upper deck SS13 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
7 Short Seam Upper deck SS14 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 33/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/06 Client : PERTAMINA RU VII
Job Item : Short Seam Upper deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Short Seam Upper deck SS15 fillet A.283 Gr.c 2/9/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
2 Short Seam Upper deck SS16 fillet A.283 Gr.c 4/9/17 5mm SMAW - - - Acc -
3 Short Seam Upper deck SS17 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
4 Short Seam Upper deck SS18 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 34/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/06 Client : PERTAMINA RU VII
Job Item : Short Seam Upper deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Long Seam Upper deck LS1 fillet 5/9/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
A.283 Gr.c
2 Long Seam Upper deck LS2 fillet A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
3 Long Seam Upper deck LS3 fillet A.283 Gr.c 4/9/17 5mm SMAW - - - Acc -
4 Long Seam Upper deck LS4 fillet A.283 Gr.c 4/9/17 5mm SMAW - - - Acc -
5 Long Seam Upper deck LS5 fillet A.283 Gr.c 3/9/17 5mm SMAW - - - Acc -
6 Long Seam Upper deck LS6 fillet A.283 Gr.c 3/9/17 5mm SMAW - - - Acc -
7 Long Seam Upper deck LS7 fillet A.283 Gr.c 4/9/17 5mm SMAW - - - Acc -
8 Long Seam Upper deck LS8 fillet A.283 Gr.c 3/9/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 35/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/05 Client : PERTAMINA RU VII
Job Item : Rim Plate Upper deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Rim Plate Upper deck CRP.1 T.Joint 5/9/17 5mm SMAW - - - Acc -

15-WPS-ASME-JKB-2017
A.283 Gr.c
2 Rim Plate Upper deck CRP.2 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
3 Rim Plate Upper deck CRP.3 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
4 Rim Plate Upper deck CRP.4 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
5 Rim Plate Upper deck CRP.5 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
6 Rim Plate Upper deck CRP.6 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
7 Rim Plate Upper deck CRP.7 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -
8 Rim Plate Upper deck CRP.8 T.Joint A.283 Gr.c 5/9/17 5mm SMAW - - - Acc -

5mm
upper

Corneer Joint
RIM PLATE

LOWER
4mm
5mm

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 22/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 16-8-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/07 Client : PERTAMINA RU VII
Job Item : Short Seam Lower deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Short Seam Lower deck SS1 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
2 Short Seam Lower deck SS2 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
3 Short Seam Lower deck SS3 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
4 Short Seam Lower deck SS4 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
5 Short Seam Lower deck SS5 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
6 Short Seam Lower deck SS6 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
7 Short Seam Lower deck SS7 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
8 Short Seam Lower deck SS8 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 23/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 16-8-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/07 Client : PERTAMINA RU VII
Job Item : Short Seam Lower deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Short Seam Lower deck SS9 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
2 Short Seam Lower deck SS10 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
3 Short Seam Lower deck SS11 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
4 Short Seam Lower deck SS12 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
5 Short Seam Lower deck SS13 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
6 Short Seam Lower deck SS14 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
7 Short Seam Lower deck SS15 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
8 Short Seam Lower deck SS16 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
9 Short Seam Lower deck SS17 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -
10 Short Seam Lower deck SS18 fillet A.283 Gr.c 14/8/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 24/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 16-8-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/07 Client : PERTAMINA RU VII
Job Item : Long Seam Lower deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Long Seam Lower deck LS1 fillet 15/8/17 5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
A.283 Gr.c
2 Long Seam Lower deck LS2 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -
3 Long Seam Lower deck LS3 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -
4 Long Seam Lower deck LS4 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -
5 Long Seam Lower deck LS5 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -
6 Long Seam Lower deck LS6 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -
7 Long Seam Lower deck LS7 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -
8 Long Seam Lower deck LS8 fillet A.283 Gr.c 15/8/17 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 25/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 23/8/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/05 Client : PERTAMINA RU VII
Job Item : Rim Plate Lower deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Rim Plate Lower deck CRP.1 T.Joint 23/8/2017 5mm SMAW - - - Acc -

15-WPS-ASME-JKB-2017
A.283 Gr.c
2 Rim Plate Lower deck CRP.2 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
3 Rim Plate Lower deck CRP.3 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
4 Rim Plate Lower deck CRP.4 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
5 Rim Plate Lower deck CRP.5 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
6 Rim Plate Lower deck CRP.6 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
7 Rim Plate Lower deck CRP.7 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
8 Rim Plate Lower deck CRP.8 T.Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -

5mm
Corneer Joint
RIM PLATE

LOWER
4mm
5mm

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 026/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 23/8/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/05 Client : PERTAMINA RU VII
Job Item : Rim Plate Lower deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Rim Plate.1 to Rim Plate.2 RP.1 butt Joint 23/8/2017 5mm SMAW - - - Acc -

008-ASME-JKB-IV/10
A.283 Gr.c
2 Rim Plate.2 to Rim Plate.3 RP.2 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
3 Rim Plate.3 to Rim Plate.4 RP.3 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
4 Rim Plate.4 to Rim Plate.5 RP.4 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
5 Rim Plate.5 to Rim Plate.6 RP.5 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
6 Rim Plate.6 to Rim Plate.7 RP.6 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
7 Rim Plate.7 to Rim Plate.8 RP.7 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -
8 Rim Plate.8 to Rim Plate.1 RP.8 butt Joint A.283 Gr.c 23/8/2017 5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 027/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 25/8/2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/05 Client : PERTAMINA RU VII
Job Item : CENTER RING PLATE Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
CRP.1 butt Joint 24-8-17 5mm SMAW - - - Acc -

008-ASME-JKB-IV/10
1 CENTER RING PLATE.1 To PLATE. 2 A.283 Gr.c
2 CENTER RING PLATE.2 To PLATE. 1 CRP.2 butt Joint A.283 Gr.c 24-8-17 5mm SMAW - - - Acc -
3 CENTER RING PLATE To LOWER CRP.3 FILLET 24-8-17 SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : 28/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/11 Client : PERTAMINA RU VII
Job Item : Roof Mahole Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Roof Mahole RM.1 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
2 Roof Mahole RM.2 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
3 Roof Mahole RM.3 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
4 Roof Mahole RM.4 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
5 Roof Mahole RM.5 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
6 Roof Mahole RM.6 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
7 Roof Mahole RM.7 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
8 Roof Mahole RM.8 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -
9 Roof Mahole RM.9 fillet A.283 Gr.c 5/9/17 6&5mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 29/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : Floating Roof suport Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 Floating Roof suport FRS.1 fillet A.283 Gr.c 4/9/17 Sch 80 SMAW - - - Acc -

13-WPS-ASME-JKB-14
2 Floating Roof suport FRS.2 fillet A.283 Gr.c 4/9/17 Sch 80 SMAW - - - Acc -
3 Floating Roof suport FRS.3 fillet A.283 Gr.c 4/9/17 Sch 80 SMAW - - - Acc -
4 Floating Roof suport FRS.4 fillet A.283 Gr.c 4/9/17 Sch 80 SMAW - - - Acc -
5 COVER LEADDER CL.1 fillet A.283 Gr.c 5/9/17 8mm SMAW - - - Acc -
6 HOUSNG TEMP 2'' HT.1 fillet A.283 Gr.c 5/9/17 Sch 80 SMAW - - - Acc -
7 STILLING WELL 8'' SW.1 fillet A.283 Gr.c 5/9/17 Sch 80 SMAW - - - Acc -
8 GAGE POLE 8'' GP.1 fillet A.283 Gr.c 5/9/17 Sch 80 SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


______________________ ________________________ ______________________ ______________________

FIT - UP INSPECTION REPORT


Report No : 30/FIR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10
Date : Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/03 Client : PERTAMINA RU VII
Job Item : FOAM DAM to Upper Deck Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 FOAM DAM FD.1 fillet 9/13/2017 5mm SMAW - - - Acc -

15-WPS-ASME-JKB-2017
A.283 Gr.c
2 FOAM DAM FD.2 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -
3 FOAM DAM FD.3 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -
4 FOAM DAM FD.4 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -
5 FOAM DAM FD.5 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -
6 FOAM DAM FD.6 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -
7 FOAM DAM FD.7 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -
8 FOAM DAM FD.8 fillet A.283 Gr.c 9/13/2017 5mm SMAW - - - Acc -

FOAM DAM

UPPER PLATE

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : U22/IPDR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10 & 5-T-12
Date : Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/26 Client : PERTAMINA RU VII
Job Item : SPIRAL STAIRWAY LEADER Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 SPIRAL STAIRWAY LEADER TPY fillet A.283 Gr.c 20-7-2017 6mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
No.1 s/d 67

plate bordes

Shell plate

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________


FIT - UP INSPECTION REPORT
Report No : U23/IPDR/JKB/QA-AC/VI/2017 Project Name : OVERHAUL TANK 5-T-10 & 5-T-12
Date : 8-9-2017 Location Field Kasim
Drawing No : T-CO/RU-VII/KSM/10 Client : PERTAMINA RU VII
Job Item : Roof MANHOLE 24'' & Deck sump Tank : T-10
Joint Joint THK WPS Welding Welding Stamp Fit-up result
No Description MAT'L TGL Result
No Type ( mm ) No Process Root Root Cover Acc Reject
1 PONTONN MANHOLE PM.1 fillet A.283 Gr.c 5/9/17 6mm SMAW - - - Acc -

13-WPS-ASME-JKB-14
Deck sump DS.2 fillet A.283 Gr.c 5/9/17 6mm SMAW - - - Acc -

,Prepared By ,Reviewed / Witnessed By Reviewed / Approved by Approved by


PT. Jasa Kita Bersama PERTAMINA PJIT MIGAS

______________________ ________________________ ______________________ ______________________