Professional Documents
Culture Documents
WEEKLY:
CONDITION OF HOOKS
ATTACHMENT OF LB
ON LOAD RELEASE GEAR (PROPER N COMPLETE RESET)
ENGINE OF LB, RESCUE BOAT SHALL BE RUN AT A TOTAL PERIOD OF NOT LESS THAN 3 MINS
(AHEAD N ASTERN)
IMO SYSMBOL
LB MOVED FROM THEIR STOWED POSN, W/O ANY PERSON ONBOARD, TO DEMONSTRATE
OPERATION OF LAUNCHING APP (IF WEATHER N SEA ALLOW)
GENERAL EMERGENCY ALARM TESTED
MONTHLY:
LB TURNED OUT FROM THEIR STOWED POSN, W/O ANY PERSON ONBOARD (IF WEATHER N
SEA ALLOW)
LOWER TO EMBARKATION DECK LEVEL
MARKING IN GOOD CONDITION (POB, SIZE, NAME, CALLSIGN, BOAT NO.)
IMO SYMBOL
FITTINGS N EQP
HRU MECHANISM (EXP DATE, WEAK LINK, CRADLES, LASHING)
WATERTIGHT INTERGRITY AND SECURE HANDLES
INSIDE LB EQUIPMENT;
-SPARE TOOLS
-SAFETY BELT
-AIR PRESSURE SUPPORT SYSTEM
-LIGHTING
-COMPASS
-PROPELLER AND RUDDER
-LB EQP
-REMOTE CONTROL WIRE
OUTSIDE LB EQP;
-SHEAVES
-PIVOTS
-STEEL WIRE
-TURNBUCKLES
-EMBARKATION LADDER
-CHECK EXPIRY DATE OF FOOD N WATER
3 MONTHLY:
LIFEJACKET:
MONTHLY:
IMMERSION SUITS:
MONTHLY:
BAG COND
DONNING INSTRUCTION
DRY INSIDE OUT
DAMAGE (RIPS, TEAR, PUNTURES)
WORKING OF ZIPPER
RETRO REFLECTIVE TAPES
IMO SYMBOL
EEBD:
WEEKLY:
SIGN OF LEAKAGES
PRESSURE GAUGE
PRESSURE BELOW MANUFACTURE MANUAL, NEED TO TOP UP
DAMAGE AT CASING, STRAPS MOUTHPIECE
IMO SYMBOL
MONTHLY:
YEARLY:
BOTTLE CHECKED BY CAPABLE AUTHORITY.
SCBA:
WEEKLY:
MONTHLY:
YEARLY:
5 YEARLIES:
LIFEBUOYS:
MOTHLY:
WEEKLY:
POWER SUPPLY
TRY AT ALLOCATED AREAS
TEST GENERAL ALARM
PYROTECHNICS:
MONTHLY:
LTA:
MONTHLY:
MARKING OF LB N RB
TOP:
BOAT NO.
CALLSIGN
RETRO REFLECTIVE TAPES
+ SYMBOL
BOTH SIDE:
SHIP NAME
SZE DIMENSION
PERSON ON BOARD
PORT OF REGISTRY
UNIVERSAL HOSE CONN TO BE PROVIDED ON ALL SHIPS AS PER SOLAT CHAPTER 2-2
PURPOSE TO KEEP SB A HOSE ATTACHMENT TO GET CONNECTION FROM SHORE INCASE P/P
FAILURES
SOLAS REQ (CHAPTER II-2, REG 102.1.7
-SHIPS ABOVE 500T GT N UPWARDS HAVE ATLEASTE 1 ISC
SAME N STANDARD SIZE FOR ALL COUNTRY
FFA ITEMS N MAINTANENCE
FIRE BLANKET:
CASING COND
BLANKETS COND
INSRUCTION MANUAL
IMO SYMBOL
FIREMAN OUTFITS:
PULL THE PIN. HOLD THE EXTINGUISHER WITH THE NOZZLE POINTING AWAY FROM YOU
AND RELEASE THE LOCKING MECHANISM.
AIM LOW. POINT THE EXTINGUISHER AT THE BASE OF THE FIRE.
SQUEEZE THE LEVER SLOWLY AND EVENLY.
SWEEP THE NOZZLE FROM SIDE-TO-SIDE.
LIFEBUOYS:
LIFERAFT:
should be enough to accommodate at least 125% of the number of passengers and crew
PYTOTECHNIC:
IN EACH LB
- 2 SMOKE SIGNAL
- 4 ROCKET PARACHUTE
- 6 HAND FLARES
BRIDGE
- 4 LTA
- 12 ROCKET PARACHUTE
Why there is only one lifeboat if it’s stowed at stern but 2 lifeboats if stowed one the ship’s
side?
AS PER SOLAS REQUIREMENTS FOR FREE FALL KENA ADA SATU JER... (KOR KENA CARI "AYAT
FACT" KAT SOLAS LA BAB TU). TP IF LOGICALLY SPEAKING. IF SHIP HAVE FIRE ON PORT SIDE
PPL CAN BOARD ON STARBOARD SIDE AND VIS- VERSA... IF ASTERN ONLY ONE AND ALL CAN
ASSEMBLE KAT STERN JER....
TRIM 10’
LIST 15’
RELEASING A MOB
BRIDGE WING
EQP DIFFS OF ONE ANOTHER:
At least one lifebuoy on each side of the ship must be fitted with a buoyant lifeline.
Not less than one half of the total number of lifebuoys must be provided with self-igniting
lights.
Not less than two of these must also be provided with lifebuoy self-activating signals and be
capable of quick release from the navigation bridge.
LIFEJACKET
COMFORTABLE
BRIGHT COLOUR
6 RETRO TAPE
BUDDY LINE
WHISTLE
LIGHT (0.75CD, 8HRS, SWITCH, WHITE, Rate Of Flashing (50-70)
DON LESS 1 MIN
NOT SUSTAIN BURNED FOR 2 SECS
BUOYANT NOT REDUCE 5% AFTER 24HRS
Able to SWIM N CLIMB RAFT
IMMERSION SUIT
WATERPROOF MATERIAL
UNPACK N DON LESS 2 MINS
BUOYANT NOT LESS 5% AFTER 24HRS
NOT SUSTAIN BURNED FOR 2 SECS
COVER ALL BODY EXCEPT FACE
CAN CLIMB 5M VERTICAL LADDER
CAN PERFORM DUTIES
CAN JUMP 4.5M
CAN SWIM
LIFERAFT LAUNCHING
AUTO LAUNCH
WHEN THE SHIP SINKS UP TO 1.5M to 4 METRES, THE WATER PRESSURE WILL ACTIVATE A
SHARP KNIFE IN THE HRU
IT WILL CUT THE SECURING ROPE AROUND THE CONTAINER/CANISTER OF THE RAFT AND
THE RAFT WILL FLOAT FREE
AS THE SHIP SINKS FURTHER, THE PAINTER LINE WILL STRETCH AND IT WILL INFLATE THE
LIFE RAFT
DUE TO THE INCREASE IN BUOYANT PRESSURE, THE WEAK LINK WILL BREAK AT AROUND 2.2
KN +/- 0.4 AND THE RAFT WILL BE ON THE SURFACE
MANUAL LAUNCH
CODES IN SOLAS