Professional Documents
Culture Documents
Revision 01
1. In documents preparation, I was asked to publish the Map Location and Schematic of related
ODP as evidences.
2. Helping to close the ticket order of several projects, such as PT2 Simple, TOMPS, Retail, and
reporting for currently running project, updating the data and validating As Build Drawing
(ABD) document alongwith project mapping.
3. Clearing jobs with low-level authorization such as Pemkab's request to calculate Distribution
Cable for taxing, enumerate Bill of Quantity (BoQ), and mapping the customer's place.
4. Mapping several ODPs into unified project by Central Office using Masterplan format.
5. In loose time, I used to help Data Management (DaMan) division to keep their inventory
availability for construction.