RECTIFICATION OF SITE SAFETY DEFICIENCIES

PIC R-7514

GENERAL AGENCIES AND CONTRACTING

BRANCH: SHOBOKOSHI DEVELOPMENT AND TRADING CO.

OFF Km. 19 Highway Yanbu-Jeddah

P.O Box 30013, Madinat Yanbu Al Sinaiyah

Tel. No. (04) 396 2810. FAX (04)-321 0890


Date: August 8, 2021

SITE RECTIFICATION

Before Rectification

(TUV has been process)

Description/Recommendation: Rectification:
A front end loader working on the live road
found without beacon light; TUV card or 3rd Expired TUVs has been sent for renewal.
party certificate of operator and equipment
were expired. The activity was stopped.
Contractor was advised not to use both
equipment and operator on site until TUVs
are renewed.

Description/Recommendation: Rectification:
Excavation observed without barricades and
safety signs. All excavations and trenches
shall be appropriately identified with signs,
warnings and barricades. If adjacent to roads
or general public access these must conform
to all relevant traffic regulations

( Compaction has been finish and finalize)

Description/Recommendation: Rectification:
Road shoulder being compacted by roller
compactor however no advance warning Completed road shoulder compaction.
signs and necessary barriers were provided.
The activity was stopped and enforcement
notice issued. Contractor was instructed to
provide required barriers and signs as per
approved Traffic Management Plan (TMP).

Description/Recommendation: Rectification:
Piles of construction wastes, scrape asphalts,
and concrete debris remain not removed Removal of excess asphalt and unwanted materials
and disposed off‐site. Contractor was has been done.
advised to ensure regular disposal of all
waste is carried out and prevent
Accumulation on site. Unused materials
must be stored in designated storage area
Only.

Description/Recommendation: Rectification:
A handle (1m deep) was left open and not
Protected. Contractor was instructed to Hand hole has been temporary covered and
provide temporary rigid cover, cordon off barricaded at the side.
with physical barriers, and provide safety
Sign to prevent fall hazard.

Description/Recommendation: Rectification:
Rest shelter roof side not adequately
Covered, unsecured and short bench pad. Shelter has been repaired.
Contractor was advised to fix the rest shelter
and provide additional layer of green mesh
on the roof and fix the bench with adequate
Seat board or pad.
Description/Recommendation: Rectification:
Steel rebar being used as barricade stakes
observed with protruding ends not protected Rebar caps has been placed.
Or capped. All steel rebar sticking out
should be bended or capped to prevent
Impalement injury.