You all are divided into several groups to visit the construction site to collect information for
writing your report. The group is given a task where they work together for a written report
to be submitted within 7 days after site visit. Pls include your site group photo in report.
TASK
Usually, the construction project has several activities at site. Your task is to collect
information relevant to your area of inquiry. Your group is responsible to seek information
according to the category assigned to you.
AREA OF INQUIRY
1. PROJECT ACTIVITY – Project duration, client and contractors, project cost,
problems on site, etc [Group nos. 1A, 1B, 1C, 1M]
________________________________________________________________________________________________________________________________
Lecturers: Professor Dr. Md. Abdul Mannan and Associate Professor Dr. Mohd Ibrahim Safawi b. Mohd Zain
KNS 1042 Civil Engineering Materials (Semester I, Session 2018-2019)
__________________________________________________________________________________________
Project site: Bekalan Air Luar Bandar (BALB), Mentong Merau, Mongkos Bahagian
Serian
Contractor address: Tiya Bina Sdn Bhd-63, 1 st Floor, Lot 9907, Block H, RH Plaza,
Jalan Lapangan Terbang, 93350 Kuching, Attention: En. Ali Rizvi, Tel: 082 452300,
Fax: 082460300 (En Abdul Rahim of HP 0128875050)
Proposed visit dates:
o 1st visit on 27 October 2018, Saturday with 60 students
o 2nd visit on 3 November 2018, Saturday with rest 60 students
Collection of safety shoe and helmet from Civil Eng Lab= 8am
Site visit = 900 to 1100am
Return of shoe and helmet to lab=12 noon
Mode of transport: UNIMAS Bus at 830am
________________________________________________________________________________________________________________________________
Lecturers: Professor Dr. Md. Abdul Mannan and Associate Professor Dr. Mohd Ibrahim Safawi b. Mohd Zain