Professional Documents
Culture Documents
This is to certify that I, the incoming Chief Engineer, have been duly appointed and that the following documents,
procedures and equipment (as applicable to this vessel) have been checked by me and have been found to my
satisfaction:
Departing Chief Engineer – Please provide brief details regarding the status of the following equipment:
If more space is required, please use the provided blank notes page (4)
Thrusters
Alternators
Winches
(Anchor Handling, Towing,
Tuggers, Other)
Compressors
ITEM DETAILS
Repairs
Non-conformance
Defects / Areas of Concern
PMS
QSMS
Customer / Charter
Ordered Parts
Joining Engineer – Following hand-over discussion and review of the above details with the departing Chief
Engineer, the Joining Chief Engineer should make an inspection tour of the applicable parts of the vessel
(preferably accompanied by the departing Chief Engineer.) On completion, brief details of any observations (if
required) should be made in the space below:
If more space is required, please use the provided blank notes page (4)
Joining Chief Engineer (Signature as applicable) Departing Chief Engineer (Signature as applicable )