Professional Documents
Culture Documents
Owner’s Engineer
EPC
Designer
PROJECT:
PV-BESS-ICE PLANTS
FOR APPROVAL
Title:
consent. Any copy of this document in digital or paper support will be considered a not control copy. The only valid copy is the last one approved located in the document manager
system
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
Revision Record
Version Date Section Page Description of Modification and basis
2
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
Table of Contents
1. INTRODUCTION………………………………..…………………..…………………..….….4
1.1 REFERENCE………………………..…………………..……………………………..4
3
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
1. INTRODUCTION
This document describes the procedures to be followed during the Site Acceptance Test
(SAT). The SAT will demonstrate the function and integration of the Distributed Control
System (DCMS).
1.1. REFERENCES
4
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
Before in-depth testing begins, please make sure the whole plant is not in operation, the
related equipment is safe to power off.
Please follow the sequence to power up the DCMS system, after system start up, please
verify the controller and workstations status in system status picture.
SF#1
Hardware Type Hardware Verified Hardware Type Hardware Verified
CONTROLLER 1/51 ENG 200
CONTROLLER 2/52 OPH 160
CONTROLLER 3/53 OPH 161
CONTROLLER 4/54 COM 170
CONTROLLER 5/55 COM 171
OPC 180
OPC 181
COM 190
COM 191
COM 192
COM 193
OPR 211
OPR 212
OPR 213
5
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
In this session, the hardware will be checked to verified the hardware status or function.
6
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
The operation of the text and color copier printers will be demonstrated by printing files
and color copies.
SF#1
Hardware Type Hardware Verified Hardware Type Hardware Verified
CONTROLLER 1/51 ENG 200
EXT 1-1 OPH 160
CONTROLLER 2/52 OPH 161
EXT 2-1 COM 170
CONTROLLER 3/53 COM 171
CONTROLLER 4/54 OPC 180
CONTROLLER 5/55 OPC 181
PRINTER-1 COM 190
PRINTER-2 COM 191
COM 192
COM 193
OPR 211
7
Project:
RED SEA UTILITY ASSETS AND INFRASTRUCTURE PROJECT
Owner: EPC Contractor:
Document number: Rev:
R13-I06B01-TJS-PRC-TC-0065 00
OPR 212
OPR 213
The Punch List is used to record significant discrepancies which are identified during the Site
Acceptance Test. Each discrepancy will be recorded on a variance form. At the end of each
day the Punch List is to be reviewed and a plan of action identified to correct any system
discrepancy.
After the conclusion of the SAT, Emerson will provide a plan for resolving and re-testing any
open variances. The Customer and Emerson will do the re-testing on-site.
Upon successful completion of the Site Acceptance Test and approval by the Customer, the
system will be accepted by customer.
Signature:
OWNER Representative
Sign: ___________________.
Name: __________________.
Date:____________________.
SEPCOIII Representative
Sign: ___________________.
Name: __________________.
Date:____________________.