Carpentry NC II
Developed by: Ma. Joan R. Ferrolino Issued by: PSAI Page
NOTES: Unit of Competency: Prepare/Stake-out Building Lines
NC Level II
______________________________________________________
______________________________________________________ Learnin Task/Activity Date Instructors
______________________________________________________ g Outcome Required Accomplishe Remarks
______________________________________________________ d
______________________________________________________ LO 1: Selected and October 4, Competen
______________________________________________________ Prepare used 2021 t
______________________________________________________ materials appropriate
______________________________________________________ for stake- PPE
______________________________________________________ out lines according to
______________________________________________________ job
______________________________________________________ requirements
______________________________________________________ and OSHC
______________________________________________________ standards
______________________________________________________
______________________________________________________ Interpreted
______________________________________________________ related plans
_ and details
according to
job
requirements
Prepared
materials,
hand tools
and
equipment
consistent
Carpentry NC II
Developed by: Ma. Joan R. Ferrolino Issued by: PSAI Page
with job Unit of Competency: Prepare/Stake-out Building Lines
requirements
Responded NC Level II
to the
unexpected Learning Task/Activity Date Instructors
situations in Outcome Required Accomplishe Remarks
d
line with the
company LO 2: Set Set October 5, Competen
rules and batterboard batterboards 2021 t
regulations s away from
Performed the building
housekeepin line
g according excavation.
to safety Secured
regulations batterboards
properly with
tolerances
for
dimensions
___________________ ____________________ at +- 5 mm,
Trainee’s Signature Trainer’s Signature and levelness
of +-3 mm.
Responded
to the
unexpected
situations in
line with the
company
Date Developed: October 7, 2021 Document No.
Carpentry NC II
Developed by: Ma. Joan R. Ferrolino Issued by: PSAI Page
rules and Unit of Competency: Prepare/Stake-out Building Lines
regulations
Performed NC Level II
housekeepin Learning Task/Activity Date Instructors
g according Outcome Required
to safety Accomplished Remarks
regulations LO 3: Fix Staked-out October 6, Competent
stake-out building lines 2021
building are properly
lines secured for
____________________ ______________________ reference in
excavating
Trainee’s Signature Trainer’s Signature building
foundation.
Squared and
plumbed
marking lines
from the
batterboard
lines with
tolerance of +-
3 mm on all
measurement
, plumbness,
squareness
and rigid.
Cleaned and
kept worksite
Date Developed: October 7, 2021 Document No.
Carpentry NC II
Developed by: Ma. Joan R. Ferrolino Issued by: PSAI Page
in safe state
according to
OSHC
regulations.
Accomplished
daily work
report in
accordance
with company
rules and
regulations.
______________________ ______________________
Trainee’s Signature Trainer’s Signature
Carpentry NC II
Developed by: Ma. Joan R. Ferrolino Issued by: PSAI Page
TRAINEE’S PROGRESS SHEET
:Ken Virgin L.
Name Trainer : Ma. Joan R. Ferrolino
Ferrolino
Qualificatio Nominal
:Carpentry NC II : 24 Hours
n Duration
Units of Training Date Date Trainee’
Supervisor
Competenc Training Activity Duratio Starte Finish Rating s Initial
’s Initial
y n d ed
PREPARE / STAKE-OUT BUILDING LINES
LO 1: Selected and used 8 Hours Octobe Octobe Competen Ken Ma. Joan
Prepare appropriate PPE r 4, r 4, t Virgin L. R. Ferrolino
materials according to job 2021 2021 Ferrolino
for stake- requirements and
out OSHC standards
building
Interpreted related
lines
plans and details
according to job
requirements
Prepared
materials, hand
tools and
equipment
consistent with job
requirements
Carpentry NC II
Developed by: Ma. Joan R.
Issued by: PSAI Page
Ferrolino
Responded to the
unexpected
situations in line
with the company
rules and
regulations
Performed
housekeeping
according to safety
regulations
LO 2: Set Set batterboards 8 Hours Octobe Octobe Competen Ken Ma. Joan
batterboard away from the r 5, r 5, t Virgin L. R. Ferrolino
s building line 2021 2021 Ferrolino
excavation.
Secured
batterboards
properly with
tolerances for
dimensions at +-
5 mm, and
levelness of +-3
mm.
Responded to the
unexpected
situations in line
with the company
Carpentry NC II
Developed by: Ma. Joan R.
Issued by: PSAI Page
Ferrolino
rules and
regulations
Performed
housekeeping
according to safety
regulations
LO 3: Fix Staked-out 8 Hours Octobe Octobe Competen Ken Ma. Joan
stake-out building lines are r 6, r 6, t Virgin L. R. Ferrolino
building properly secured 2021 2021 Ferrolino
lines for reference in
excavating
building
foundation.
Squared and
plumbed marking
lines from the
batterboard lines
with tolerance of
+- 3 mm on all
measurement,
plumbness,
squareness and
rigid.
Cleaned and kept
worksite in safe
state according to
Carpentry NC II
Developed by: Ma. Joan R.
Issued by: PSAI Page
Ferrolino
OSHC regulations.
Accomplished
daily work report
in accordance with
company rules and
regulations.
24 3 Days
Total
Hours
Note: The trainee and the supervisor must have a copy of this form. The column for rating maybe used either by
giving a numerical rating or simply indicating competent or not yet competent. For purposes of analysis, you
may require industry supervisors to give a numerical rating for the performance of your trainees. Please take
note however that in TESDA, we do not use numerical ratings.
Carpentry NC II
Developed by: Ma. Joan R.
Issued by: PSAI Page
Ferrolino