You are on page 1of 25

Republic of the Philippines

Technical Education and Skills Development


Authority (TESDA)
MAXIMA
Technical and Skills Training Institute Inc.

TRAINEE’S RECORD BOOK


Trainee’s No.:
22-CARPTRY-T041

I.D PICTURE
ARTHUR C. ARSENIO
Trainee

Qualification: Carpentry NC II

Training Duration: 120 hours

Schedule: Monday to Friday (8:00am – 5:00pm)

Trainer: Joseph M. Estrada


Instructions: TECHNICAL EDUCATION &
SKILLS DEVELOPMENT AUTHORITY
This Trainees’ Record Book (TRB) is intended to serve as
record of all accomplishment/task/activities while undergoing
training in the industry. It will eventually become evidence Vision: TESDA is the leading partner in the development of the Filipino workforce
with world-class competence and positive work values.
that can be submitted for portfolio assessment and for
whatever purpose it will serve you. It is therefore important Mission: TESDA provides direction, policies, programs and standards towards
that all its contents are viably entered by both the trainees quality technical education and skill development.
and instructor. Values Statement: We believe in demonstrated competence, institutional integrity,
personal commitment and deep sense of nationalism.
The Trainees’ Record Book contains all the required
competencies in your chosen qualification. All you have to do Quality Policy: “We measure our worth by the satisfaction of the customers we
is to fill in the column “Task Required” and “Date serve” Through: Strategic Decisions
Effectiveness
Accomplished” with all the activities in accordance with the Responsiveness
training program and to be taken up in the school and with Value Adding
the guidance of the instructor. The instructor will likewise Integrity
Citizen focus
indicate his/her remarks on the “Instructors Remarks” Efficiency
column regarding the outcome of the task accomplished by
the trainees. Be sure that the trainee will personally
accomplish the task and confirmed by the instructor.
It is of great importance that the content should be
written legibly on ink. Avoid any corrections or erasures and
maintain the cleanliness of this record.
This will be collected by your trainer and submit the
same to the Vocational Instruction Supervisor (VIS) and shall
form part of the permanent trainee’s document on file.

THANK YOU.
NOTES: RECORD OF ACHIEVEMENT OF COMPETENCY
Basic Competency: 1 PARTICIPATE IN WORKPLACE COMMUNICATION
CARPENTRY NC II
____________________________________________________ Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks
____________________________________________________
1. Obtain and 1.1 Specific and relevant August 02, 2023
____________________________________________________ convey information is
workplace accessed from
____________________________________________________ information appropriate sources 8:00am –
1.2 Effective questioning, 10:00am
____________________________________________________ active listening and (2hours)
speaking skills are
____________________________________________________ used to gather and
convey information
____________________________________________________ 1.3 Appropriate medium
is used to transfer
____________________________________________________ information and ideas
____________________________________________________ 1.4 Appropriate non-
verbal
____________________________________________________ communication is
used
____________________________________________________ 1.5 Appropriate lines of
communication with
____________________________________________________ supervisors and
colleagues are
____________________________________________________ identified and
followed
____________________________________________________ 1.6 Defined workplace
procedures for the
____________________________________________________ location and storage
of information are
used
1.7 Personal interaction
is carried out clearly
and concisely
2. Perform 2.1 Team meetings are August 02, 2023
duties attended on time
following 2.2 Own opinions are
clearly expressed and 10:00am-
workplace
those of others are 11:00am
instructions
listened to without (1 hour)
interruption
2.3 Meeting inputs are
consistent with the
meeting purpose and
established protocols TRAINEE TRAINER
2.4 Workplace interactions
are conducted in a
courteous manner
2.5 Where necessary,
clarifications about SUSANA E. TANDOC
routine workplace
SCHOOL HEAD
procedures and
matters concerning
conditions of
employment are
sought and asked from
appropriate sources
2.6 Meeting’s outcomes
are interpreted and
implemented
3. Complete 3.1 Range of forms August 02, 2023
relevant relating to conditions
work- of employment are
completed accurately 11:00am – 12:00
related
and legibly noon
documents
3.2 Workplace data is (1 hour)
recorded on standard
workplace forms and
documents
3.3 Errors in recording
information on forms/
documents are
identified and properly
acted upon
3.4 Reporting
requirements to
supervisor are
completed according
to organizational
guidelines

RECORD OF ACHIEVEMENT OF COMPETENCY


Basic Competency: 2 WORK IN TEAM ENVIRONMENT
CARPENTRY NC II
Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks

ARTHUR C. ARSENIO JOSEPH M. ESTRADA 1. Obtain and 1.8 The role and objective August 02, 2023
convey of the team is
workplace identified from 1:00pm – 2:00pm work plans based on
information available sources of (1 hour) an understanding of
information team’s role and
1.9 Team parameters, objectives
reporting
relationships and
responsibilities are
identified from team
discussions and
appropriate external
sources
2. Identify 2.1 Individual roles and August 02, 2023
ARTHUR C. ARSENIO JOSEPH M. ESTRADA
one’s role responsibilities within
the team environment TRAINEE TRAINER
and
are identified 2:00pm – 3:00pm
responsibili
ty within a 2.2 Roles and objectives (1 hour)
team of the team is
identified from
available sources of SUSANA E. TANDOC
information
SCHOOL HEAD
2.3 Team parameters,
reporting
relationships and
responsibilities are
identified based on
team discussions and
appropriate external
sources
3. Work as a 3.1 Effective and August 02, 2023
team appropriate forms of
member communications are
used and interactions 3:00pm – 5:00pm
undertaken with (2hours)
team members based
on company
practices.
3.2 Effective and
appropriate
contributions made
to complement team
activities and RECORD OF ACHIEVEMENT OF COMPETENCY
objectives, based on Basic Competency: 3 SOLVE/ADDRESS GENERAL WORKPLACE
workplace context PROBLEMS
3.3 Protocols in reporting
are observed based CARPENTRY NC II
on standard company Learning Task/Activity Required Date Instructors
practices. Outcome Accomplished Remarks
3.4 Contribute to the
development of team 1. Identify 1.1 Routine problems or August 03, 2023
routine procedural problem
problems areas are identified 8:00am – 9:00am SUSANA E. TANDOC
1.2 Problems to be
investigated are (1 hour) SCHOOL HEAD
defined and
determined
1.3 Current conditions of
the problem are
identified and
documented
2. Look for 2.1 Potential solutions to August 03, 2023
solutions to problem are identified
routine 2.2 Recommendations
about possible 9:00am –
problems
solutions are 10:00am
developed, (1 hour)
documented, ranked
and presented to
appropriate person for
decision
3. Recommend 3.1 Implementation of August 03, 2023
solutions to solutions are planned
problems 3.2 Evaluation of
implemented solutions 10:00am –
are planned 12:00noon
3.3 Recommended (2 hours)
solutions are
documented and
submit to appropriate
person for
confirmation

RECORD OF ACHIEVEMENT OF COMPETENCY


Basic Competency: 4 DEVELOP CAREER AND LIFE DECISIONS
ARTHUR C. ARSENIO JOSEPH M. ESTRADA
CARPENTRY NC II
TRAINEE TRAINER Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks

1. Manage 1.1 Self-management August 03, 2023


one’s strategies are 3.3 Positive outlook in life
emotion identified 1:00pm – 3:00pm are maintained.
1.2 Skills to work
(2 hours)
independently and to
show initiative, to be
conscientious, and
persevering in the face ARTHUR C. ARSENIO JOSEPH M. ESTRADA
of setbacks and TRAINEE TRAINER
frustrations are
developed
1.3 Techniques for
effectively handling
negative emotions and SUSANA E. TANDOC
unpleasant situation
SCHOOL HEAD
in the workplace are
examined
2. Develop 2.1 Personal strengths August 03, 2023
reflective and achievements,
practice based on self-
3:00pm- 4:00pm
assessment strategies
and teacher feedback (1 hour)
are contemplated
2.2 Progress when seeking
and responding to
feedback from
teachers to assist
them in consolidating
strengths, addressing
weaknesses and
fulfilling their potential
are monitored
2.3 Outcomes of personal
and academic
challenges by
reflecting on previous
problem solving and
RECORD OF ACHIEVEMENT OF COMPETENCY
decision making Basic Competency: 5 CONTRIBUTE TO WORKPLACE INNOVATION
strategies and
feedback from peers CARPENTRY NC II
and teachers are Learning Task/Activity Required Date Instructors
predicted Outcome Accomplished Remarks
3. Boost self- 3.1 Efforts for continuous August 03, 2023
confidence self-improvement are 1. Identify 1.1 Opportunities for August 04, 2023

and demonstrated opportuniti improvement are


4:00pm- 5:00pm es to do identified proactively
develop 3.2 Counter-productive 8:00am- 9:00am
self- (1 hour) things in own area of work.
tendencies at work are
regulation better 1.2 Information are (1 hour)
eliminated
gathered and reviewed
which may be relevant ARTHUR C. ARSENIO JOSEPH M. ESTRADA
to ideas and which TRAINEE TRAINER
might assist in gaining
support for idea.
2. Discuss 2.1 People who could August 04, 2023
and provide input to ideas
develop for improvements are SUSANA E. TANDOC
9:00am- 11:00am
ideas with identified.
SCHOOL HEAD
others 2.2 Ways of approaching (2 hours)
people to begin
sharing ideas are
selected.
2.3 Meeting is set with
relevant people.
2.4 Ideas for follow up are
review and selected
based on feedback.
2.5 Critical inquiry
method is used to
discuss and develop
ideas with others.
3. Integrate 3.1 Critical inquiry August 04, 2023
ideas for method is used to
change in integrate different
11:00am-
the ideas for change of key
12:00noon
workplace. people.
3.2 Summarizing, (1 hour)
analyzing and
generalizing skills are
used to extract salient
points in the pool of
ideas.
3.3 Reporting skills are
likewise used to
communicate results. RECORD OF ACHIEVEMENT OF COMPETENCY
3.4 Current Issues and Basic Competency: 6 PRESENT RELEVANT INFORMATION
concerns on the
systems, processes CARPENTRY NC II
and procedures, as Learning Task/Activity Required Date Instructors
well as the need for Outcome Accomplished Remarks
simple innovative
practices are 1. Gather 1.1 Evidence, facts and August 04, 2023
identified. data/ information are
information collected
1:00pm- 2:00pm
1.2 Evaluation, terms of
reference and (1 hour)
conditions are SUSANA E. TANDOC
reviewed to determine
whether SCHOOL HEAD
data/information falls
within project scope
2. Assess 2.1 Validity of data/ August 04, 2023
gathered information is
data/ assessed
2:00pm- 4:00pm
information 2.2 Analysis techniques
are applied to assess (2 hours)
data/ information.
2.3 Trends and anomalies
are identified
2.4 Data analysis
techniques and
procedures are
documented
2.5 Recommendations are
made on areas of
possible improvement.
3. Record and 3.1 Studied August 04, 2023
present data/information are
information recorded.
4:00pm- 5:00pm
3.2 Recommendation s are
analyzed for action to (1 hour)
ensure they are
compatible with the
project’s scope and
terms of reference.
3.3 Interim and final
RECORD OF ACHIEVEMENT OF COMPETENCY
reports are analyzed
and outcomes are Basic Competency: 7 PRACTICE OCCUPATIONAL SAFETY AND HEALTH
compared to the POLOCIES AND PROCEDURES
criteria established at
the outset. CARPENTRY NC II
3.4 Findings are presented Learning Task/Activity Required Date Instructors
to stakeholders. Outcome Accomplished Remarks

1. Identify 1.1 Relevant OSH August 07, 2023


OSH requirements,
compliance regulations, policies
ARTHUR C. ARSENIO JOSEPH M. ESTRADA 8:00am- 9:00am
requiremen and procedures are
TRAINEE TRAINER ts identified in (1 hour)
accordance with
workplace policies and
procedures
1.2 OSH activity
nonconformities are
conveyed to ARTHUR C. ARSENIO JOSEPH M. ESTRADA
appropriate personnel
TRAINEE TRAINER
1.3 OSH preventive and
control requirements
are identified in
accordance with OSH
work policies and
procedures SUSANA E. TANDOC

2. Prepare 2.1 OSH work activity August 07, 2023 SCHOOL HEAD
OSH material, tools and
requiremen equipment
9:00am- 11:00am
ts for requirements are
compliance identified in (2 hours)
accordance with
workplace policies and
procedures
2.2 Required OSH
materials, tools and
equipment are
acquired in
accordance with
workplace policies and
procedures
2.3 Required OSH
materials, tools and
equipment are
arranged/ placed in
accordance with OSH
work standards
3. Perform 3.1 Relevant OSH work August 07, 2023
RECORD OF ACHIEVEMENT OF COMPETENCY
tasks in procedures are
Basic Competency: 8 EXERCISE EFFICIENT AND EFFECTIVE
accordance identified in
with accordance with
11:00am- SUSTAINABLE PRACTICES IN WORKPLACE
12:00noon
relevant workplace policies and
OSH procedures (1 hour) CARPENTRY NC II
policies 3.2 Work Activities are Learning Task/Activity Required Date Instructors
and executed in Outcome Accomplished Remarks
procedures accordance with OSH
work standards 1. Identify the 1.1 Required resource August 07, 2023

3.3 Non-compliance work efficiency utilization in the


and workplace is measured
activities are reported 1:00pm- 2:00pm
effectivenes using appropriate
to appropriate
s of techniques (1 hour)
personnel
resource 1.2 Data are recorded in
utilization accordance with TRAINEE TRAINER
workplace protocol
1.3 Recorded data are
compared to determine
the efficiency and
effectiveness of SUSANA E. TANDOC
resource utilization SCHOOL HEAD
according to
established
environmental work
procedures
2. Determine 2.1 Potential causes of August 07, 2023
causes of inefficiency and/or
inefficiency ineffectiveness are
2:00pm- 4:00pm
and/or listed
ineffectiven 2.2 Causes of inefficiency (2 hours)
ess of and/or ineffectiveness
resource are identified through
utilization deductive reasoning
2.3 Identified causes of
inefficiency and/or
ineffectiveness are
validated thru
established
environmental
procedures
3. Convey 3.1 Efficiency and August 07, 2023
inefficient effectiveness of RECORD OF ACHIEVEMENT OF COMPETENCY
and resource utilization are
ineffective reported to
4:00pm- 5:00pm Basic Competency: 9 PRACTICE ENTREPRENEURIAL SKILLS IN THE
environmen appropriate personnel (1 hour) WORKPLACE
tal 3.2 Concerns related
practices resource utilization are CARPENTRY NC II
discussed with Learning Task/Activity Required Date Instructors
appropriate personnel Outcome Accomplished Remarks
3.3 Feedback on
information/ concerns 1. Apply 1.1 Good practices August 08, 2023

raised are clarified entrepreneuri relating to workplace


with appropriate al workplace operations are
8:00am- 9:00am
personnel best practices observed and selected
following workplace (1 hour)
policy.
1.2 Quality procedures
and practices are
complied with
ARTHUR C. ARSENIO JOSEPH M. ESTRADA according to
workplace
requirements.
ARTHUR C. ARSENIO JOSEPH M. ESTRADA
1.3 Cost-conscious habits
in resource utilization TRAINEE TRAINER
are applied based on
industry standards.
2. Communicat 2.1 Observed good August 08, 2023
e practices relating to
entrepreneuri workplace operations SUSANA E. TANDOC
9:00am- 11:00am
al workplace are communicated to SCHOOL HEAD
best practices appropriate person. (2 hours)
2.2 Observed quality
procedures and
practices are
communicated to
appropriate person
2.3 Cost-conscious habits
in resource utilization
are communicated
based on industry
standards.
3. Implement 3.1 Preservation and August 08, 2023
cost-effective optimization of
operations workplace resources is
11:00am-
implemented in
2:00pm
accordance with
enterprise policy (2 hours)
3.2 Judicious use of
workplace tools,
equipment and
materials are observed
according to manual
RECORD OF ACHIEVEMENT OF COMPETENCY
and work Common Competency: 1 PREPARE CONSTRUCTION MATERIALS AND
requirements. TOOLS
3.3 Constructive CARPENTRY NC II
contributions to office
operations are made Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks
according to
enterprise 1.1 Materials are listed
1. Identify August 08, 2023
requirements. as per job
materials 2:00pm /4:00pm
3.4 Ability to work within requirements
one’s allotted time and 1.2 Quantity and (2 hours)
finances is sustained. description of
materials conform
with the job
requirements
1.3 Tools and accessories
are identified
according to
job requirements
2. Requisition 2.1Materials and tools August 08, 2023
materials needed are requested
according to the list
prepared 4:00pm to
2.2 Request is done as per August 09 2023
9:00am
company standard
operating procedures (2 hours)
(SOP)
2.3 Substitute materials
and tools are provided
without
sacrificing cost and quality
of work
3. Receive and 3.1 Materials and tools August 09, 2023
inspect issued are inspected as 9:00am /
materials per 11:00am
quantity and specification
3.2 Tools, accessories and (2 hours)
materials are checked for
damages according to
enterprise procedures
3.3 Materials and tools are
set aside to appropriate
location nearest to the
workplace

RECORD OF ACHIEVEMENT OF COMPETENCY


ARTHUR C. ARSENIO JOSEPH M. ESTADA Common Competency: 2 OBSERVE PROCEDURES, SPECIFICATIONS AND
MANUALS OF INSTRUCTIONS
TRAINEE TRAINER
CARPENTRY NC II
Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks

SUSANA E. TANDOC 1. Observe and August 09, 2023


Access 1.1 Appropriate manuals
SCHOOL HEAD
Specification are identified and
/ Manuals accessed as per job 11:00am/ ARTHUR C. ARSENIO JOSEPH M. ESTRADA
requirements 2:00pm
TRAINEE TRAINER
1.2 Version and date of (2 hours)
manual are checked to
ensure that correct
specification and
procedures
SUSANA E. TANDOC
are identified
2. Interpret 2.1 Relevant sections, August 09, 2023 SCHOOL HEAD
manuals chapters of specifications/ 2:00am -4:00pm
manuals are located in
relation to the work to be (2 hours)
conducted
2.2 Information and
procedure in the manual
are
interpreted in
accordance with
industry practices
3. Apply 3.1 Manual is interpreted August 09, 2023
information according to job
in manuals requirements
3.2 Work steps are 4;00pm-5:00 pm
correctly identified in (1 hour)
accordance
with manufacturer's
specification
3.3 Manual data are
applied according to the
given
task RECORD OF ACHIEVEMENT OF COMPETENCY
3.4 All correct sequencing
Common Competency: 3 PERFORM ESTIMATION AND BASIC
and adjustments are CALCULATION
interpreted in accordance CARPENTRY NC II
with information
contained on the manual Learning Task/Activity Required Date Instructors
or specifications Outcome Accomplished Remarks
4. Store 4.1 Manual or August 10, 2023
specification is stored
1. Select 1.1 Object or component August 10, 2023
manuals measuring to be measured is
appropriately to 9:00am-12:00pm
instrument identified, classified and
prevent damage, ready 8:00am – 9:00am (3 hours)
interpreted according to
access and updating of the appropriate regular
information when required geometric shape
in accordance with ( 1 hour )
1.2 Measuring tools are
company requirements selected/identified as per
object to be measured or
job requirements
1.3 Correct specifications
are obtained from relevant
sources
1.4 Appropriate measuring
instruments are selected
according to job
requirements ARTHUR C. ARSENIO JOSEPH M. ESTRADA
1.5 Alternative measuring
tools are used without TRAINEE TRAINER
sacrificing cost and quality
of work
2. Carry out 2.1 Accurate August 10, 2023
measurement measurements are 12:00pm –
obtained SUSANA E. TANDOC
s and 4:00am
calculation according to job SCHOOL HEAD
requirements (3 hours)
2.3 Alternative measuring
tools are used
without sacrificing cost
and quality of work
2.4 Calculation needed to
complete work tasks are
performed using the four
basic process of
addition (+), subtraction
(-), multiplication (x)
and division (/) including
but not limited to:
trigonometric functions,
algebraic computations
2.5 Calculations involving
fractions, percentages RECORD OF ACHIEVEMENT OF COMPETENCY
and mixed numbers are Common Competency: 4 MAINTAIN TOOLS AND EQUIPMENT
used to complete
workplace tasks CARPENTRY NC II
2.6 Numerical
Learning Task/Activity Required Date Instructors
computation is self- Outcome Accomplished Remarks
checked and
corrected for accuracy 1.1 Materials, tools and August 10, 2023
04:00PM-5:00PM
2.7 Instruments are read 1. Check equipment are identified
to August 11,
to the limit of accuracy of conditions according to classification
2023 09:00am
the tool and tools and job requirements
2.8 Systems of equipment 1.2 Non-functional tools (2 hours)
measurement identified and equipment are
and segregated and labeled
converted according to job according to
requirements/ISO classification
2.9 Workpieces are 1.3 Safety of tools and
measured according to job equipment are observed in
Requirements accordance with
manufacturer's specifications or company
instructions procedures
1.4 Condition of PPE are
checked in accordance
with manufacturer's
instructions
2. . Perform 2.1 Appropriate lubricants August 10, 2023
basic are identified according to
preventive types of equipment
2.2 Tools and equipment 09:00am-
maintenance
are lubricated according to 11:00Am
preventive maintenance (2 hours)
schedule or
manufacturer's
specifications
2.2 Measuring
ARTHUR C. ARSENIO JOSEPH M. ESTRADA
instruments are checked
and TRAINEE TRAINER
calibrated in accordance
with manufacturer’s
instructions
2.4 Tools are cleaned and
lubricated according to SUSANA E. TANDOC
standard procedures
2.2 Defective instruments, SCHOOL HEAD
equipment and
accessories are inspected
and replaced
according to
manufacturer’s
specifications RECORD OF ACHIEVEMENT OF COMPETENCY
2.6 Tools are inspected, Core Competency: 1 Prepare/ Stake-out building lines
repaired and replaced after
use CARPENTRY NC II
2.7 Work place is cleaned
and kept in safe state in Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks
line with OHSA
regulations 1. Prepare 1.1 Appropriate PPE is August 10, 2023
3. Store tools 3.1 Inventory of tools, August 10, 2023 selected and used according
materials 2:00pm to
and instruments and to
for stake- August 11
Equipment equipment job requirements and OSHC 11:00am
11:00am-2:00pm
out
are conducted and standards.
building (6 hours)
recorded as per company (2 hours) 1.2 Related plans and
lines
practices details are correctly
3.3 Tools and equipment interpreted
are stored safely in according to job
appropriate locations in requirements.
accordance with 1.3 Materials, hand tools
manufacturer's and equipment is prepared
consistent with job building foundation.
requirements. 3.2 Marking lines are
1.4 Materials are properly squared and plumbed from
staged and freed from the
defects. batterboard lines with
1.5 Unexpected situations tolerance of  3 mm on all
are responded to in line with measurement, plumbness,
company rules and squareness and rigid.
regulations. 3.3 Worksite is cleaned and
1.6 Housekeeping is kept in safe state according
performed according to to OSHC regulations.
safety 3.4 Daily work report is
regulations. accomplished in accordance
2. Set 2.1 Batterboards are set August 11, 2023 with
batterboard away from the building line 11:00 am to
company rules and
s excavation. August 12, 2023 regulations.
2.2 Batterboards are 09:00am
properly secured with
(6 hours)
tolerances for
dimensions at  5 mm, and
levelness of  3 mm. ARTHUR C. ARSENIO JOSEPH M. ESTRADA
2.3 Unexpected situations TRAINEE TRAINER
are responded to in line with
company rules and
regulations.
2.4 Housekeeping is SUSANA E. TANDOC
performed according to
safety SCHOOL HEAD
regulations. 2.1
Batterboards are set away
from the building line RECORD OF ACHIEVEMENT OF COMPETENCY
excavation. Core Competency: 2 FABRICATE FORMWORKS
2.2 Batterboards are
properly secured with CARPENTRY NC II
tolerances for Learning Task/Activity Required Date Instructors
dimensions at  5 mm, and Outcome Accomplished Remarks
levelness of  3 mm.
2.3 Unexpected situations 1. Prepare 1.1 Appropriate PPE is selected August 12,
and used 2023 4:00pm
are responded to in line with materials for
according to job requirements to August 13,
company rules and fabricating 2023 2:00pm
regulations. formworks and OSHC
2.4 Housekeeping is specifications. ( 6 hours)
performed according to 1.2 Related plans and details
safety are interpreted
regulations. according to job requirements.
1.3 Materials, hand and
3. Fix stake-out 3.1 Stake-out building lines August 12, 2023 power tools and
building are properly secured for 9:00am-4:00pm equipment are selected and
lines reference in excavating prepared
( 6 hours )
consistent with job specified tolerance
requirements. 3.3 Temporary fixing and/or
1.4 Materials are re-checked permanent assembly
and properly staged techniques are applied to hold
according to job requirements form panels
otherwise together as per job
defective materials or not in requirements.
specifications are 3.4 Assembled form panels are
reported to immediate superior. checked for
1.5 Unexpected situations are compliance with job
responded to in requirements.
line with company rules and 3.5 Unexpected situations are
regulations. responded to in line
1.6 Housekeeping is performed with company rules and
according to regulations.
safety regulations. 3.6 Clean up worksite
according to safety
2. Lay-out 2.1 Form sheating and August 13,
regulations and OSHC
dimension of stiffeners are measured 2023 2:00pm
to August 14, specifications.
form sheating and marked according to job 3.7 Daily work report is
2023 11:00 am
and cut with tolerances of 3 mm accomplished in
stiffeners for all (6 hours) accordance with company rules
specifications. and
2.2 Form sheating and
stiffeners are laid out and regulations.
measurements and squareness.
2.3 Form sheating and
stiffeners for column,
beam, wall, slab and stairs are
consistent with
standard spacing for studs or
nailer with
tolerance of + 10 mm. O.C.
2.4 Unexpected situations are ARTHUR C. ARSENIO JOSEPH M. ESTRADA
responded to in line TRAINEE TRAINER
with company rules and
regulations.
2.5 Housekeeping is performed
according to
safety regulations. SUSANA E. TANDOC
SCHOOL HEAD
3. Assemble 3.1 Materials and/or fabricated August 14,
form panels form sheating and 2023 11:00am
stiffeners are correctly to August 15,
2023 9:00am
positioned for
assembly. (6 hours)
3.2 Assembled form panels are
checked for RECORD OF ACHIEVEMENT OF COMPETENCY
squareness, levelness and Core Competency: 3 INSTALL FORMWORKS COMPONENTS
alignment to
CARPENTRY NC II + 3mm for all
measurements and
Learning Task/Activity Required Date Instructors
squareness.
Outcome Accomplished
Remarks 2.4 Connectors, braces,
locks and screws are
1. 1.1 Appropriate PPE is August 15, 2023
properly secured according
selected and used 9:00am- 4:00pm
to job
Prepare according to job (6 hours) requirements.
materials, tools requirements and OSHC 2.5 Unexpected situations
and equipment specifications. are responded to in line
for 1.2 Related plans and with company rules and
installing details are correctly regulations.
formworks interpreted according to job 2.6 Housekeeping is
requirements. performed according to
1.3 Formworks safety
components/materials, regulations.
power
and hand tools and 3. 3.1 Appropriate PPE is August 16, 2023
equipment are selected selected and used 2:00pm to
and prepared consistent Set/fix form according to job August 17, 2023
panels of 10:00am
with job requirements. requirements and OHSA
1.4 Materials are re- building specifications. ( 6 hours )
checked and properly component 3.2 Formworks components
staged s are laid-out with
according to job tolerance of  3 mm for
requirements otherwise measurement,
damaged materials are alignment, squareness,
reported to immediate levelness, plumbness
superior. and with form oil.
1.6 Unexpected situations 3.3 Form panels are
are responded to in set/fixed for components
line with company rules with
and regulations. tolerance to reference
1.7 Housekeeping is structure of + 3mm
performed according to 3.4 Connectors, braces,
safety locks and screws are
regulations. properly secured according
to job
2. 2.1 Appropriate PPE is August 15, 2023
requirements.
selected and used 4:00pm to
August 16, 2023 3.5 Unexpected situations
Lay-out/ according to job
2:00pm are responded to in line
assemble requirements and OSHC with company rules and
scaffolds specifications. ( 6 hours ) regulations.
and braces 2.2 Work area is cleared for 3.6 Daily report is
safe lay-outing and accomplished according to
assembling of scaffolds and company rules and
braces. regulations.
2.3 Scaffolds and braces 3.7 Housekeeping is
are laid-out and performed according to
assembled with tolerance of
safety
regulations.

ARTHUR C. ARSENIO JOSEPH M. ESTRADA


TRAINEE TRAINER

SUSANA E. TANDOC
SCHOOL HEAD

RECORD OF ACHIEVEMENT OF COMPETENCY


Core Competency: 4 STRIP FORMWORKS COMPONENTS
CARPENTRY NC II
Learning Task/Activity Required Date Instructors
Outcome Accomplished Remarks

1. 1.1 Work instruction is August 17, 2023


secured from immediate 10:00am- 5:00pm
Prepare staging superior according to (6 hours)
area, company rules and
tools and regulations.
equipment 1.2 Appropriate PPE is
selected and used
according to job
requirements and OSHC
specifications.
1.3 Formwork
components and
accessories repaired in accordance
staging area is identified with company rules
and prepared based and regulations.
on job requirements. 2.5 Unexpected
1.4 Formwork situations are responded
components power, to in line
hand tools with company rules and
and equipment are regulations.
selected and prepared 2.6 Housekeeping is
consistent with job performed according to
requirements. safety
1.5 Unexpected regulations.
situations are
responded to in 3. 3.1 Appropriate PPE is August 18, 2023
selected and used 3:00pm to August
line with company rules 19, 2023 2:00pm
Shore or/and re- according to job
and regulations.
shore requirements and OHSA (6 hours)
1.6 Housekeeping is
and removal specifications.
performed according to
safety regulations. 3.2 Formworks
components are shored
2. 2.1 Formwork August 18, 2023 and reshored
components and 8:00am-3:00pm in accordance with
Strip formworks of accessories are (6 hours) stripping
building removed carefully, safely procedures.
components and sequentially. 3.3 Shores are removed
2.2 Formwork in accordance with
components and standard dismantling
accessories are procedures.
sorted, arranged and 3.4 Shores, tools and
properly staged equipment are cleaned,
according to company maintained and stored
rules and properly according to
regulations/ company rules and
manufacturer's regulations.
recommendations. 3.5 Unexpected
2.3 Formwork situations are responded
components and to in line
accessories are with company rules and
cleaned, oiled and stored regulations.
according to 3.6 Daily report is
company rules and accomplished according
regulations/manufactur to
er's company rules and
recommendations. regulations.
2.4 Formwork 3.7 Housekeeping is
components and performed according to
accessories, which safety
are beyond repair, are regulations.
discarded otherwise
ARTHUR C. ARSENIO JOSEPH M. ESTRADA
TRAINEE TRAINER

SUSANA E. TANDOC
SCHOOL HEAD

RECORD OF ACHIEVEMENT OF COMPETENCY


Core Competency: 5 INSTALL FRAMING FORMWORKS
CARPENTRY NC II
Learning Outcome Task/Activity Date Instructors
Required Accomplished Remarks

1. Prepare 1.1 Appropriate August 19,


PPE is selected 2023 2:00pm
materials for -5:00pm
framing works and used
according to job (3 hours)
requirements
OSHC
specifications.
1.2 Related plans
and details are
correctly
interpreted
according to job
requirements.
1.3 Materials, support are
power and hand erected/assemble
tools and d
equipment are based on plans
selected and and specifications.
prepared 2.4 Unexpected
consistent with job situations are
requirements. dealt with
1.4 Materials are according to
re-checked and company rules
properly staged and regulations.
according to job 2.5 Housekeeping
requirements. is performed
1.5 Defective according to
materials are safety
reported to regulations.
immediate 3. 3.1 Appropriate August 21,
supervisor PPE is used 2023 11:00-
Lay-out/install 3:00pm
following standard floor joists according to job
operating requirements and (3 hours)
procedures. safety regulations.
1.6 Unexpected 3.2 Floor joists are
situations are set out, cut and
dealt with fixed, and
according to laterally supported
company rules in accordance with
and regulations. working
1.7 Housekeeping drawings and
is performed specifications.
according to 3.3 Floor joists are
safety regulations. trimmed for floor
2. 2.1 Appropriate August 20, openings and
PPE is used 2023 8:00am fixed with
Lay-out/erect and according to job -11:003:00pm fastenings
assemble post, girts requirements and (3 hours) according to
and OSHC working
supports specifications. drawings and
2.2 Posts and girts specifications.
are laid-out 3.4 Floor joists are
according to laid-out/installed
working drawings with tolerance
and specifications of  3mm on all
with measurements
tolerance of  and levelness.
3mm on all 3.5 Unexpected
measurements, situations are
plumbness and dealt with
levelness. according
2.3 Post, girts and to company rules
and regulations. dimensions,
3.6 Housekeeping plumbness,
is performed levelness and
according to safety squareness.
regulations. 5.3 Roof
4. 4.1 Appropriate August 21, components are
PPE is used 2023 3:00pm installed according
Lay-out/install to August 22,
wall studs according to job to
2023 9:00am working drawings
requirements and
safety regulations. (3 hours) and specifications.
4.2 Wall studs are 5.4 Unexpected
identified and situations are
installed based on dealt with
working drawings according
and specifications to company rules
with and regulations.
tolerance of  5.5 Housekeeping
3mm on all is performed
measurements, according to safety
plumbness, regulations.
levelness and 6. 6.1 Appropriate August 22,
squareness. PPE is used 2023 1:00pm
4.3 Unexpected Lay-out/install according to job -4:00pm
situations are ceiling requirements and (3 hours)
dealt with joists/frames safety regulations
according 6.2 Ceiling
to company rules joists/frames are
and regulations. laid out/installed
4.4 Housekeeping according to
is performed working drawings
according to safety and
regulations. specifications with
5. 5.1 Appropriate August 22,  3 mm tolerance
PPE is used 2023 9:00am on all
Lay-out/fabricate/ according to job -12:00pm dimensions,
install requirements and (3 hours) levelness and
roof frames safety regulations. squareness.
5.2 Types of 6.3 Unexpected
roofs and other situations are
components are dealt with
fabricated, laid out according
and installed to company rules
according to and regulations.
working drawings 6.4 Daily report is
and specifications accomplished
with according to
tolerance of  company rules
3mm maximum and regulations.
on all 6.5 Housekeeping
is performed Observe procedures, specifications and manuals of
according to safety instruction
regulations. Perform mensuration’s and calculations

Maintain tools and equipment


ARTHUR C. ARSENIO JOSEPH M. ESTRADA
TRAINEE TRAINER

Prepare / Stake-out building lines

SUSANA E. TANDOC Fabricate formworks

CORE
SCHOOL HEAD Install formwork components

Strip formwork components

Install framing works

SUMMARY RECORD OF ACHIEVEMENT OF


COMPETENCIES

Qualification Title: CARPENTRY NC II

COMPETENCIES GRADE
PARTICIPATE IN WORKPLACE COMMUNICATION

WORK IN TEAM ENVIRONMENT

SOLVE/ADDRESS GENERAL WORKPLACE


PROBLEMS
DEVELOP CAREER AND LIFE DECISIONS
BASIC

CONTRIBUTE TO WORKPLACE INNOVATION

PRESENT RELEVANT INFORMATION

PRACTICE OCCUPATIONAL SAFETY AND HEALTH


POLOCIES AND PROCEDURES
EXERCISE EFFICIENT AND EFFECTIVE
SUSTAINABLE PRACTICES IN WORKPLACE
PRACTICE ENTREPRENEURIAL SKILLS IN THE
WORKPLACE
Prepare construction materials and tools
MON
COM

You might also like