Supplier PPAP Level - Detail Required: Qualified Laboratory Documentation
Supplier PPAP Level - Detail Required: Qualified Laboratory Documentation
PPAP Level
Click on the selected section to go directly to its tab. 1 2 3 4* 5
1 Design Record R R S R
2 Engineering Change Documents R S R
3 Customer Engineering Approval R S R
4 Design FMEA R S R
5 Process Flow Diagram R S R
6 Process FMEA R S R
7 Control Plan R S R
8 Measurement System Analysis Studies R S R
9 Dimensional Results R R S R
10 Material, Performance Test Results R R S R
11 Initial Process Capability Studies R S R
12 Qualified Laboratory Documentation R R S R
13 Appearance Approval Report (AAR) R R S R
14 Sample Product R R S R
15 Master Sample S
16 Checking Aids S R S R
17 Records of Compliance (Substance of Concern & Conflict Minerals) R R R R
18 Part Submission Warrant R R R R R
Other Specific Requirements
19 Packaging Data Sheet R SR
20 Capacity Checklist R R
21 Capacity Worksheet R R
22 Castings Checklist: Evidence of Qualification (Photos, R-Ray pictures, …) S R R
23 Safe Launch Plan S S S
24 SAS and/or PSR audit rquired R
R = Required (unless not applicable)
S = Submit upon request from RBC
*Level 4 PPAP: get guidance from SDE
RBC PPAP info and forms: http://www.regalbeloit.com/suppliers
SUPPLIER PPAP GUIDELIN
PPAP LEVELS
Level Documentation Inspection Data
1 Part Submission Warrant (PSW) only No
2 PSW + limited documentations Yes, (5) pcs full layout
3 PSW + full documentations Yes, (5) pcs full layout + Capability Data on C
4 PSW + as required docs and samples (a la carte) as required
Level 3 plus SAS or PSR before PPAP or Start of
Production at Regal for New Supplier or Supplier Site
5 Change Yes, (5) pcs full layout + Capability Data on C
COMMON PPAP TYPES
(Ref. PPAP Change Management Mat
New Products and Changes PPAP Level
Brand New Part (entire product) from Current Supplier Level 3 PPAP
Product from New Supplier Level 3 PPAP
Design / Feature / Spec Change to an Existing Baseline Product Level 2 PPAP (if non-CTQ change)
Level 3 PPAP (if CTQ change)
Catalogue Products Level 1
PPAP by PART FAMILY
If PPAP is needed on multiple, similar part numbers, PPAP can be done as a family of parts. PPAP to the 'Parent'
PPAP.
LOW VOLUME PPAP
For PPAP Level 2 and Level 3, full layout on 5 samples (or fewer samples depending on the volume of the project
if the project volume or the supplier production run size does not support 30 pc capability study. For normal pro
period of multiple production runs, supplier can aggregate the CTQ data (with same sub-group size) to run the 30
provide waiver to supplier the suspension of collecting CTQ data.
URGENT PPAPs
In situations where an urgent PPAP approval is needed , SDE can support the PPAP as needed (if notified in adva
FAQ
Who determines PPAP level?
Supplier Development Engineer (SDE). SDE will assign PPAP level based on information provided & available. Howe
needs to know additional information to correctly assign PPAP level.
What happens to PPAP approval if the supplier inspection data is out of spec?
SDE should review the data with Product Eng if the supplier out-of-spec data is acceptable. If acceptable, supplier
followed by granting an Interim PPAP approval. Product Eng will need to update the print to match the deviation
spec data is not acceptable to Product Eng, supplier will need to resubmit PPAP with in-spec data.
Who determines PPAP level?
Supplier Development Engineer (SDE). SDE will assign PPAP level based on information provided & available. Howe
needs to know additional information to correctly assign PPAP level.
What happens to PPAP approval if the supplier inspection data is out of spec?
SDE should review the data with Product Eng if the supplier out-of-spec data is acceptable. If acceptable, supplier
followed by granting an Interim PPAP approval. Product Eng will need to update the print to match the deviation
spec data is not acceptable to Product Eng, supplier will need to resubmit PPAP with in-spec data.
If an existing part is sourced to another plant, does the supplier have to PPAP to the new plant?
Assuming the PPAP exists to the current consuming plant, supplier will need to submit Level 1 PPAP. If PPAP does n
If the part to be PPAP's is used at multiple Regal plants, do all of those plants need to approved the PPAP?
No. Pick one plant to be the lead or primary plant (based on volume usage) for plant quality approval of supplier P
If I have questions on supplier PPAP process or requirements, who should I contact?
Contact regional SDE Manager for guidance. Located Regal Inside/Global Supply Chain/
PLIER PPAP GUIDELINES
PPAP LEVELS
a Samples to Plant Quality Samples to Product Eng
No No
l layout Yes as needed
l layout + Capability Data on CTQs Yes as needed
as needed as needed
URGENT PPAPs
as needed (if notified in advance), working with requester and supplier.
FAQ
on provided & available. However, the PPAP requester or Product Eng may and should contact SDE if SDE
ptable. If acceptable, supplier will need to submit Deviation Request form, and Prod Eng will approve,
e print to match the deviation request, after which the full PPAP approval will be granted to supplier. If out-of-
in-spec data.
on provided & available. However, the PPAP requester or Product Eng may and should contact SDE if SDE
ptable. If acceptable, supplier will need to submit Deviation Request form, and Prod Eng will approve,
e print to match the deviation request, after which the full PPAP approval will be granted to supplier. If out-of-
in-spec data.
e new plant?
mit Level 1 PPAP. If PPAP does not exist, PPAP request should be initiated.
to approved the PPAP?
t quality approval of supplier PPAP.
t?
ain/
Version 10.0 PPAP Change Management Matrix Requirements
Level 1 - Warrant only.
(1-2 Business Days)
)
on
si
Level 2 - Warrant with (5) product samples and limited supporting data.
is
)
al
(10-15 Business Days from initial production run)
on
ub
n
e
io
si
ng
re
lS
en
at
Level 3 - Warrant with (5) product samples and complete supporting documentation.
tu
ha
a
c
im
iti
ifi
c
g
(10-15 Business Days from initial production run unless engineering test are required, timing depending on tests)
C
fa
(In
rt
(D
in
n
u
e
Level 4 - Warrant and other requirements as defined by RBC.
ol
io
an
ec
e
t
uc
To
ng
at
ss
l
M
(10-15 Business Days from initial production run unless engineering test are required, timing depending on tests)
lR
ia
c
od
ha
ce
er
ed
Lo
or
ua
Level 5 - PPAP Level 3 with SAS and/or PSR required before PPAP or before start of production at Regal. For
Pr
at
o
ifi
r
nn
Pr
te
M
lie
g
New Suppleir to Regal (SAS). For supplier site change - SAS or PSR depending on nature of site change.
od
or
Si
in
A
in
pp
in
M
rt
er
r
r
e
e
Su
lie
lie
Pa
ne
or
ng
ng
pp
pp
gi
ew
a
Ch
Ch
En
Ne
Su
Ne
Su
N
Supplier Development Engineer (SDE) has the responsibility of defining PPAP Level. Always contact SDE for PPAP requirements.
Supplier Quality Development has overall coordination responsibility for the PSW signoff.
SDE has responsibility on PPAP Package review and readiness sign off for distribution to Quality and Engineering for sign off. (R1)
Quality has sign off responsibility for manufacturing (R2)
Engineering has sign off responsibility for technical evaluation as required. (R3)
SOURCED COMPLETE/BRANDED PRODUCTS/PROCESSES
3 5 5 4 4 4 4 4
Motors, Generators, Gear Boxes, Gear Reducer, Controls, Outsourced Processes, etc.
METAL COMPONENTS
3 5 5 4 4 4 4 4
Die-Castings, Sand Castings, Extrusions, Forgings, Bearings, Gears, Powder Metal, Stampings, Springs, Shafts,
Sheaves, Sprockets, Chains, Finished Shells, Castings, Machined Parts and Contacts
ELECTRONICS/ELECTRO-MECHANICAL
3 5 5 4 4 4 4 4
ECM Controls, PCB, DVR/AVR, Power Modules, Miscellaneous Electronics, Capacitors, Switches, Terminals,
Terminal Blocks and Capacitor Film
STEEL
3 5 5 4 4 4 2 4
Lam Steel, Service Centers, Bar Steel, Steel Tubing and Shell Steel
Copper Wire, Shading Bands, Sheet and Coils. Aluminum Wire, Aluminum Ingots (Prime and Secondary), Zinc, and
Lead Wire
ENGINEERED COMPONENTS
3 5 5 4 4 4 2 4
Protectors, Plastic Parts, Plastic Resins, Cord set and Plugs, Rubber/Felt/Fiber, Nameplates, Blowers/Fans,
Magnets, Brakes/Clutches/Valves, Brushing, Commutators and Heating Elements
FASTENERS
3 5 5 4 2 2 2 4
Engineered fasteners
Parts that can be ordered through supplier catalogue or made to industry common standards specs (i.e. ASTM,
SAE). For this category, supplier provides same parts all of their clients.
FLUIDS
4 4 4 4 4 4 4 4
(SUPPLIER)
APPROVED
INCLUDED
IN PPAP
REGAL
Element
YES
YES
N/A
NO
NO
Latest detailed print and/or material spec reflecting part-number and rev level. For
1 Design Record complicated assemblies an iso-plot will be accepted. Element also needs to include a
Bill of Materials (BOM).
Engineering Change Any ECN not yet recorded in latest print and/or material spec or ISO-plot referenced in
2
Documents Element 1.
If required by RBC a written statement that approves the component/material to be
3 Customer Engineering Approval
PPAP’d by RBC Engineering.
4 Design FMEA If supplier is design responsible, a DFMEA will be required.
Process map of the manufacturing process from receiving raw/sub- components to
5 Process Flow Diagrams
shipping finished product.
Process FMEA identifying all critical process Failure Modes as well as critical to Quality
6 Process FMEA
(CTQ) characteristics. Format expected is per AIAG-FMEA.
Process Control Plan identifying all critical process controls per pFMEA as well as
7 Control Plan
critical to Quality (CTQ) characteristics. Format expected per AIAG-APQP.
Measurement System Analysis MSA studies (at a minimum Gage R&R) for all gages associated with measuring CTQ’s
8
Studies or supplier identified critical characteristics.
Full lay-out of the component to be PPAP’d relative to all print dimensions on a
9 Dimensional Results
minimum of 5 samples (per tool or cavity).
Data submitted needs to prove that component/material meets all material, performance
Material, Performance Test
10 and test requirements identified by RBC and Supplier (internal). A minimum data set of
Results
5 samples is required.
At a minimum all CTQ’s will have to demonstrate a process capability with a Cpk ≥ 1.33
Initial Process Capability
11 (minimum 10 sub-groups of 3 - (beginning of process / middle of process / end of
Studies (Ref 11a, 11b, 11c)
process) based on a stable process.
If using in-house lab for material and/or performance test results, insert the lab’s testing
Qualified Laboratory
12 scope and cerification in this section. If using an outside lab, include lab certification and
Documentation
scope.
Is waived unless specifically requested by RBC. Enclose approved Appearance
13 Appearance Approval Report
Approval Report (AAR).
Product samples to be submitted with the PPAP are the same samples used for part
14 Sample Product layout (element 9). Parts will have to be identified so that the data reported in element 9
can be verified (default 5 parts).
15 Master Sample Supplier to keep a PPAP Master sample.
In order to avoid different measurement techniques on key-product features (CTQ's),
16 Checking Aids document the method of measurement (i.e. pin-gage, micrometer, height-gage, special
gage) by feature.
Records of Compliance Mandatory Requirements to be submitted via the Regal compliance portal. Use the
17 (Substance of Concern & PSW to identify if declarations are included in PPAP (as required). If 'No', contact
Conflict Minerals) Regal.Materials.Compliance@regalbeloit.com
A completed RBC-PSW warranting the product/material meeting all applicable
Part Submission Warrant
18 specifications and standards. No product and/or process changes are allowed unless
(PSW)
RBC has given approval to do so per AIAG-PPAP latest edition section 3.
19 Packaging Data Sheet Include the details about the packaging standards to be used.
Use capacty checklist & worksheet to demonstrate that the supplier has the required
20 Capacity Checklist
equipment capacity to meet customer demand (Quoted capacity).
Use capacty checklist & worksheet to demonstrate that the supplier has the required
21 Capacity Worksheet
equipment capacity to meet customer demand (Quoted capacity).
Evidence of part validation. Documentation includes pictures of cross-sections and/or X-
22 Castings Checklist ray pictures to demonstrate that the casting process is capable of producing quality
parts (i.e. internal integrity/porosity, …).
Enhanced process and product controls during new process / new product launch. As
23 Safe Launch Plan
required by SDE.
Part Submission Warrant
Part Name Cust. Part Number
Shown on Drawing No. Org. Part Number
Has the substance of concern information for the part being warranted been submitted via Yes No
the Regal compliance portal?
Level 1 - Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.
Level 2 - Warrant with product samples and limited supporting data submitted to customer.
Level 3 - Warrant with product samples and complete supporting data submitted to customer.
Level 4 - Warrant and other requirements as defined by customer.
Level 5 - Warrant with product samples and complete supporting data reviewed at organization's manufacturing location.
SUBMISSION RESULTS
The results for dimensional measurements
material and functional tests
appearance criteria statistical process package
Yes
These results meet all drawing and specification requirements: No (If "NO" - Explanation Required)
Mold / Cavity / Production Process
DECLARATION
I hereby affirm that the samples represented by this warrant are representative of our parts which were made by a process that meets all Production Part
Approval Process Manual 4th Edition Requirements. I further affirm that the designated process to produce this part have the minimum capacity
of 120% of the quoted volume with production tools and equipment in the quoted work patterns. Any deviations from the declaration are noted below.
EXPLANATION/COMMENTS:
Title E-mail
Engineering Other
Oct-16
Add here or attach the Design Records (Drawings and Specifications)
being PPAP'd to:
Add here or attach any document related to an Engineering Change
(ECR/ECO) as applicable for PPAP
(Refer to PPAP Checklist)
Add here or attach any approval from Regal Engineering related to
documents such as drawings and specifications
(Refer to PPAP Checklist)
If Design responsible, add here or attach the DFMEA
(Refer to PPAP Checklist)
Add here or attach the Process Flow Diagram (Using an AIAG approved
format)
(Refer to PPAP Checklist)
SAMPLES
P L E
SA M
L E
P L E
SA M
24
P L E
4
M
M P
4
5
SA
6
25
9
13
10 14
NO
ACCEPTED?
NO
NO
11 20
12
11 20
12
YES
ACCEPTED?
YES
15 16 17
OPERATIONS
1.- Wip Material
2.- Solder
3.- Put bottom insulator
4.- Put top insulator
5.- Put mylar
6.- Put roll
7.- Welding
8.- Oil
9.- Seaming
10.- Electrical test
11.- Labeling
E
12.- Repair area
L
13.- Scrap area
14.- Scrap area
15.- Label
P
16.- Waiting for process
17.- Oven
18.- Waiting test
19.- Final electrical test
20.- Repair area
21.- Waiting
22.- Packaging
23.- Storage
P 24.- Subassy area
25.- Subassy area
23
22
21
YES
NO
20
19 ACCEPTED?
20
19
18
POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (FMEA)
(PROCESS FMEA)
FMEA Number:
PRODUCT Name PROCESS RESPONSIBILITY: PREPARED BY:
Part number: Eng Rev Level ORIGINAL DATE:
CORE TEAM REVISION DATE:
C O O
S l c D R Responsibility & S c D R
Process Potential cause(s)/ Current Process Current Process Controls Recommended
Requirements Potential Failure Mode Potential Effect(s) of Failure e a c e P Target Completion Actions Taken e c e P
Number s Mechanism of Failure Controls Prevention Detection Actions
v u t N Date v u t N
s
r r
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
(PROCESS FMEA)
FMEA Number:
PRODUCT Name PROCESS RESPONSIBILITY: PREPARED BY:
Part number: Eng Rev Level ORIGINAL DATE:
CORE TEAM REVISION DATE:
C O O
S l c D R Responsibility & S c D R
Process Potential cause(s)/ Current Process Current Process Controls Recommended
Requirements Potential Failure Mode Potential Effect(s) of Failure e a c e P Target Completion Actions Taken e c e P
Number s Mechanism of Failure Controls Prevention Detection Actions
v u t N Date v u t N
s
r r
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
(PROCESS FMEA)
FMEA Number:
PRODUCT Name PROCESS RESPONSIBILITY: PREPARED BY:
Part number: Eng Rev Level ORIGINAL DATE:
CORE TEAM REVISION DATE:
C O O
S l c D R Responsibility & S c D R
Process Potential cause(s)/ Current Process Current Process Controls Recommended
Requirements Potential Failure Mode Potential Effect(s) of Failure e a c e P Target Completion Actions Taken e c e P
Number s Mechanism of Failure Controls Prevention Detection Actions
v u t N Date v u t N
s
r r
0 0
Part Number / Latest Change Level Core Team Customer Engineering Approvals (if required)
Part Number / Description Supplier / Plant Approval / Date Customer Quality Approval (if required)
Supplier / Plant Supplier Code Other Approval / Date (if required) Other Approval / Date (if required)
CHARACTERISTIC METHODS
SAMPLE
Part Number / Latest Change Level Core Team Customer Engineering Approvals (if required)
Part Number / Description Supplier / Plant Approval / Date Customer Quality Approval (if required)
Supplier / Plant Supplier Code Other Approval / Date (if required) Other Approval / Date (if required)
CHARACTERISTIC METHODS
SAMPLE
Part Number / Latest Change Level Core Team Customer Engineering Approvals (if required)
Part Number / Description Supplier / Plant Approval / Date Customer Quality Approval (if required)
Supplier / Plant Supplier Code Other Approval / Date (if required) Other Approval / Date (if required)
CHARACTERISTIC METHODS
SAMPLE
Part Number / Latest Change Level Core Team Customer Engineering Approvals (if required)
Part Number / Description Supplier / Plant Approval / Date Customer Quality Approval (if required)
Supplier / Plant Supplier Code Other Approval / Date (if required) Other Approval / Date (if required)
CHARACTERISTIC METHODS
SAMPLE
Part Number / Latest Change Level Core Team Customer Engineering Approvals (if required)
Part Number / Description Supplier / Plant Approval / Date Customer Quality Approval (if required)
Supplier / Plant Supplier Code Other Approval / Date (if required) Other Approval / Date (if required)
CHARACTERISTIC METHODS
SAMPLE
n D4 d2 dO
Factors
DIMENSION SPECIFICATION TOLERANCE TEST QTY. MEASUREMENT RESULTS (DATA) MEASUREMENT GAGE NOT
ITEM OK
(Nominal) DESCRITPION (-) (+) DATE TESTED (Minimum 5 pieces) TYPE OK
Mark inspected parts #1 - #5. The inspected parts are to be
shipped to Regal for PAPP samples.
Sample #1 Sample #2 Sample #3 Sample #4 Sample #5
Note: If the characteristic is considered a 'REFERENCE' or 'BASIC' dimension, add 'Reference' in the Specification Description column
42644 Blanket statements of conformance are unacceptable for any test results.
SIGNATURE TITLE DATE
Production Part Approval
Material Test Results
ORGANIZATION: PART NUMBER:
SUPPLIER/VENDOR CODE: PART NAME:
MATERIAL SUPPLIER: DESIGN RECORD CHANGE LEVEL:
*CUSTOMER SPECIFIED SUPPLIER/VENDOR CODE ENGINEERING CHANGE DOCUMENTS:
*If source approval is req'd, include the Supplier (Source) & Customer assigned code. NAME of LABORATORY:
42644 Blanket statements of conformance are unacceptable for any test results.
SIGNATURE TITLE DATE
Production Part Approval
Performance Test Results
ORGANIZATION: PART NUMBER:
SUPPLIER/VENDOR CODE: PART NAME:
MATERIAL SUPPLIER: DESIGN RECORD CHANGE LEVEL:
*CUSTOMER SPECIFIED SUPPLIER/VENDOR CODE ENGINEERING CHANGE DOCUMENTS:
*If source approval is req'd, include the Supplier (Source) & Customer assigned code.
42644 Blanket statements of conformance are unacceptable for any test results.
SIGNATURE TITLE DATE
30 Piece Capability Study
Supplier Name:
No. Data Part Number: Engineering Release #:
1 Drawing Number: Drawing Rev:
2 Part Description: Asset/Tool #:
3 Characteristic: Gage Type:
4 Specification: Date:
5
6 Specification Process Capability Calculations
7 USL 0.0000 + 3 Sigma #DIV/0! Standard Deviation (Sigma) #DIV/0!
8 + 2 Sigma #DIV/0! Total Specification Tolerance 0.00000
9 + Tol. + 1 Sigma #DIV/0! Process Spread (6*Sigma) #DIV/0!
10 Target Dim. MEAN #DIV/0! Capability Ratio (Cr) #DIV/0!
11 -Tol. - 1 Sigma #DIV/0! Process Potential (Cp) #DIV/0!
12 - 2 Sigma #DIV/0!
13 LSL 0.0000 - 3 Sigma #DIV/0!
Process Capability (Cpk) #DIV/0!
14 3 Sig. Process Tolerance = +/- #DIV/0!
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29 COMMENTS:
30
Comments:
HIGH 0.0000
LOW 0.0000
Range 0.0000
#DIV/0!
Capabilty Study on Low Volume Products - 100% Inspection on CTQs on ALL (100%) Parts
Low Volume = Less than 30 pcs for a single run / batch run / PPAP run due to low annual volume usage
ORGANIZATION: PART NUMBER:
SUPPLIER CODE: PART NAME:
NAME OF INSPECTION FACILITY: DESIGN RECORD CHANGE LEVEL:
ENGINEERING CHANGE DOCUMENTS:
X
X
Samples and data from multiple runs, over a period of time, can be grouped together with the same sub-group size, to run normal Capability Study. At which time, if the capabilty analysis
demonstrates Cpk>1.3, then 100% inspection on CTQs will be waived.
Note: If the characteristic is considered a 'REFERENCE' or 'BASIC' dimension, add 'Reference' in the Specification Description column
TYPE 1
If the unilateral tolerance is NOT BOUNDED, meaning the feature can physically go outside of MIN and MAX;
TYPE 2
If the unilateral tolerance is BOUNDED, meaning the feature CANNOT physically go outside of MIN and/or MAX;
APPEARANCE EVALUATION
AUTHORIZED RBC
ORGANIZATION SOURCING AND TEXTURE INFORMATION PRE-TEXTURE REPRESENTATIVE
EVALUATION SIGNATURE AND DATE
CORRECT AND
PROCEED
CORRECT AND
RESUBMIT
APPROVED TO
ETCH/TOOL/EDM
COLOR EVALUATION
COLOR
COLOR TRISTIMULUS DATA MASTER MASTER MATERIAL MATERIAL HUE VALUE CHROMA GLOSS METALLIC SHIPPING PART
SUFFIX NUMBER DATE TYPE SOURCE BRILLIANCE SUFFIX DISPOSITION
DL* Da* Db.* DE* CMC RED YEL GRN BLU LIGHT DARK GRAY CLEAN HIGH LOW HIGH LOW
COMMENTS
42644
Brief description about shipment of PPAP samples sent to Regal for
evaluation: Quantity, Part Number, Where to, ...
(Refer to PPAP Checklist)
DOCUMENTATION
REQUIREMENTS FOR
REACH AND RoHS
DOCUMENTATION
REQUIREMENTS FOR
REACH AND RoHS
REGAL BELOIT
(Reference Regal - Supplier Packaging/Labeling Standards)
Regal Part Number PART NAME: PRODUCT DESCRIPTION: DATE:
SUPPLIER DEVELOPMENT R
E
G
MATERIALS / PLANNING A
L
PRODUCT ENGINEER
I
N
PLANT QUALITY
P
U
Expected Delivery Frequency: (Weekly, Daily, Etc.) Expected Volume of Parts per Delivery: T
Specific-Special Packaging/Labeling Requirements:
S
U
P
P
L
I
E
PALLET INFORMATION Material: Wood HT Other: ESD Material YES NO R
Size:48" x 48" Other: IF YES, GIVE DETAILS OF PROTECTION USED AND PRECAUTION LABEL
TO BE IN CONTAINERS I
N
P
PACKAGING PROPOSAL: NEW: YES NO IF NO, REVISION # PLASTIC BAGS CORROSION PROTECTION
U
RETURNABLE OR EXPENDABLE TOTAL GROSS WEIGHT (INCHES or MM ) NO. OF USED? NEEDED? T
PACKAGING? (US LBS or KG) LENGTH WIDTH HEIGHT PARTS YES NO YES NO
SHIPPING PACK: Ret Exp IF YES, QUANTITY IF YES, WHAT TYPE OF
SUB-PACK: Ret Exp PER BAG? PROTECTION IS USED.
SINGLE PART: DIMENSIONS________
Packaging description Supplier Checklist:
1.Fiberboard compression strength (ECT, Mullen, or VDW)
2.Stackup height of shipping pack (st 1. This packaging/labeling data form shall be filled out completely.
3 2. All data shall conform to the Regal Beloit Supplier Packaging/Labeling
4 Standards.
BAR CODE ASSIGNED ID: Sample 3. Submit this form via email.
4. Mail actual shipping label samples.
SUPPLIER SIGNATURE: DATE: 5. Supplier shall be responsible for cleanliness of returnable packaging
containers.
Comments:
2. Can all line changeovers, if any, be performed within the quoted tooling capacity requirements?
Yes No Comments:
3. Does the net through-put of good pieces (scrap taken out, ant allowable rework) meet daily/yearly quoted capacity?
Yes No Comments:
Comments:
B. SUBCONTRACTOR REQUIREMENTS
1. Were subcontractors' abilities to meet the customer's quality and capacity requirements confirmed by the supplier?
Yes No Comments:
COMMENTS:
PASS
PASS OPEN
OPEN FAIL
FAIL
Page 50 of 56
II. Capacity Planning
Operating pattern for the specific part Process 1 Process 2 Process 3
Process description (ID batch or continuous process)
Identify asset ID # or code
Dedicated or Shared process (for shared process,
show only the operating pattern for the specific part/part
family)
If shared process - shared with other Regal parts or
other Customer parts
A Shifts/day
B Total hours/shift
B1 Hours/shift used for this part number (shared prod)
C1 Personal breaks: lunch, breaks (minutes/shift)
C2 Planned Maintenance (minutes/shift)
D Days/week
E Net available time (production hours/week)
[A*(B1-(B1/B)*((C1+C2)/60))*D]
- - -
II. Capacity Planning SHARED
Operating pattern for the specific part/part family Process 1 Process 2 Process 3 Process 4
Process description (ID batch or continuous process) Identify asset Bore #1
Turning #1 (batch) Drill #1 (batch) Washing (batch)
ID # or code (batch)
Dedicated or Shared process (for shared process,
SHARED
show only the operating pattern for the specific part/part family)
If shared process - shared with other Regal parts or other
OTHER CUSTOMERS
Customer parts
A. Shifts/day 1.00 2.00 1.00 1.00
B. Total hours/shift 8.00 8.00 8.00 3.00
B1 Hours/shift used for this part number (shared prod) 5.00 4.00 4.00 4.00
C1 Personal breaks: lunch, breaks (minutes/shift) 30.00 30.00 30.00 30.00
C2 Planned Maintenance (minutes/shift) 30.00 30.00 30.00 30.00
D Days/week 1.00 5.00 4.00 5.00
E
Net available time (production hours/week)
[A*(B1-(B1/B)*((C1+C2)/60))*D]
4.38 35.00 14.00 16.67
Castings Qualification & Validation Checklist
Add or attach evidence - documents and/or pictures
D2). Has supplier sectioned (cut) during a development run to review and document for internal porosity/inclusions?
Yes No Comments:
D3). Has supplier utilized destructive testing (sectioning & trial machining) to validate internal integrity of casting?
Yes No Comments:
D4). Has supplier utilized non-destructive testing (such as x-ray, ultrasound) to validate internal integrity of casting?
Yes No List method:
P3). Will supplier ship one of the samples from 1st production run as PAPP samples?
Yes No Comments:
P4). Does supplier Control Plan include an on-going process integrity checks, including checks at a minimum from the beginning, middle and end of
each production run?
Yes No Comments:
P5). If there are current Regal casting quality issues, has the supplier revalidated process and casting integrity as outlined in the above Casting
Development?
Yes No Comments:
Add or attach details about the Safe Launch Plan (Enhanced Control Plan)
(Refer to PPAP Checklist)