Cooling Tower Nozzles,
Crossflow
General The Type 1 and 2 Cooling Nozzle are
a re-designation for the Gem Type 1
Description and 2.
1-3/4"
(44,5 mm)
MACHINED
SURFACE
TYPE DESIGNATION (1 or 2):
MACHINED
3/4" NPT WATERWAY
FIGURE 1
TYPES 1 AND 2 COOLING TOWER NOZZLE
1" x 3/4"
1" ELBOW
ELBOW
FIGURE 3
SWING JOINT WITH W-TYPE 11
1" x 2" NIPPLE SPRINKLER WRENCH
PLAN
MACHINED
SURFACE
MACHINED
SURFACE Installation
MUST BE UP MUST BE UP
The TYCO Type 1 and 2 Cooling Tower
Nozzles must be installed in accor-
dance with this section.
NOZZLE NOZZLE
PROJECTION PROJECTION
ANGLE ANGLE NOTICE
(REF. TABLE A) (REF. TABLE A) A leak tight 3/4 in. NPT sprinkler joint
should be obtained with a minimum-to-
DISTRIBUTION DISTRIBUTION
BASIN BASIN
maximum torque of 10 to 20 ft-lb (13,4
to 26,8 N∙m). Higher levels of torque
4" 5-1/2" may damage the nozzle with conse-
(101,6 mm) (139,7 mm) quent leakage or impairment of the
MINIMUM MINIMUM nozzle.
Step 1. With pipe thread sealant
applied to the pipe threads, hand
tighten the nozzle into the nozzle fitting.
Step 2. Tighten the nozzle into the
nozzle fitting using only the W-Type 11
Sprinkler Wrench (Ref. Figure 3). With
reference to Figure 1, the W-Type 11
Sprinkler Wrench is to be applied to
the wrenching area.
NOZZLE FILL FILL
NOZZLE The Cooling Tower Nozzles must be
SECTION SECTION installed with the plane of their frame
DIFFUSION arms horizontal (i.e., parallel to the dis-
DECK tribution basin) and with the machined
surface facing upwards as shown in
OF SPACE BETWEEN BOTTOM OF SPACE BETWEEN BOTTOM Figure 2.
OF DISTRIBUTION BASIN AND TOP OF DISTRIBUTION BASIN AND TOP The Cooling Tower Nozzles must be
OF DIFFUSION DECK OF FILL SECTION installed with the applicable Nozzle
TYPE 1 NOZZLE TYPE 2 NOZZLE Projection Angle indicated in Table A
(COOLING TOWER (COOLING TOWER (according to the fill section length),
WITH DIFFUSION DECKS) WITHOUT DIFFUSION DECKS) and as illustrated in Figure 2. It is rec-
SIDE ELEVATION SIDE ELEVATION ommended that a 3/4 in. (DN20) pipe
nipple be temporarily installed in the
FIGURE 2 1 in. x 3/4 in. (DN25 x DN20) reduc-
INSTALLATION OF TYPES 1 AND 2 COOLING TOWER NOZZLES ing elbow, and that an adjustable spirit
level be used to set the Nozzle Projec-
tion Angle.
TFP830
Page 4 of 4