2.1 Dead Loads
Dead load
Floor and roof materials, including floor and roof joists (beams), Ceiling materials, including dust work for
environmental control and power supplies Exterior walls Mechanical equipment Fire proofing.
Dead Load
Corrugated Own weight of
Higher Technological Institute 10th of Ramadan City
Typically for industrial area (factory) the roof is a corrugated sheet (cladding), either single layer or double layer and the
following weights may be used in the structural analysis:
• Single layer steel sheets (Wc)= 5→8 kg/m2
• Double layered steel sheets with insulation (Wc) 10→18 kg/m2
The O.W of steel structure (Ws)=20→35 kg/m2 according to span (as the span increase, the steel weight also increases),
these values represents the weight of main system (truss), purlins, girts, bracing and any other steel components.
“Design of Steel Structures I”
2.1 Dead Loads
a
PDL= Wc*( * S)+Ws*(a*S)= ✓ kg = ✓ ton
cos α
Where:
Where:
Higher Technological Institute 10th of Ramadan City
fig.3 fig.2
“Design of Steel Structures I”
2.3 Wind Loads (a) (a/2)
Panel width(a)
The area in the previous equation is the (S) (S)
Interior joint
Exterior joint
area that each joint serve regarding wind g (S)
cin
spa
load as shown in the following figure. ste
m
sy
in
Where exterior joint serve an area of = Ma
𝑎∗𝑆 e (q)
r
. While the interior one serve an area Pre
ssu
2∗cos α
ind
W
Higher Technological Institute 10th of Ramadan City
𝑎∗𝑆
of
cos α
𝑎∗𝑆
P3 = (-0.5*k *q)*( ) =✓t
𝑐𝑜𝑠 𝛼
DF, additional
Primary case
Design force
Type of the
NOTE:
load effect
Secondary
of loading
comment
Secondary load effect
If case (II) / case (I) < 1.2⸫ use DF from Case I
If case (II) / case (I) ≥ 1.2⸫ use DF from Case II
LOAD CASES
Higher Technological Institute 10th of Ramadan City
Calculate all loads acting on the shown truss, knowing that the spacing between
trusses 6m.
Higher Technological Institute 10th of Ramadan City
SOLUTION
II- Structural
I- Load Analysis to III- Load IV- DESIGN
Calculation obtain straining combination according to the
action design force
“Design of Steel Structures I”
Higher Technological Institute 10th of Ramadan City I-Load Calculation
SOLUTION
3- Wind load
Assume wind effect is Left & tan α =0.1, hence Ce2 = - 0.8
Higher Technological Institute 10th of Ramadan City
𝑎∗𝑆 2∗6
P2 = (Ce*k *q)*( ) = (-0.8*1 *70)*( )= -675 kg = -0.675 t
𝑐𝑜𝑠 𝛼 𝑐𝑜𝑠 5.71
𝑎∗𝑆 𝑎∗𝑆
P3 = (-0.5*k *q)*( ) = (-0.5*1 *70)*( )= - 422 kg = - 0.422 t
𝑐𝑜𝑠 𝛼 𝑐𝑜𝑠 𝛼
P4 = (-0.5*k *q)* (S) = (-0.5*1 *70)* (6) = - 210 kg/m = -0.21 t/m
Higher Technological Institute 10th of Ramadan City “Design of Steel Structures I”
II-Structural Analysis
Higher Technological Institute 10th of Ramadan City “Design of Steel Structures I”
L4
L3
L2
L1
V4
V3
V2
V1
U4
U3
U2
U1
D4
D3
D2
D1
Mem DL LL WL WR
III-Load combination
“Design of Steel Structures I” III-Load combination
LOAD CASES
Mem DL LL WL WR CASE (I) CASE (II)
DL+LL DL+WL DL+WR DL+LL+WL DL+LL+WR
D1 1.31 2.69 -4.77 0.66
D2 0.69 1.41 -3.29 0.99
D3 0.23 0.47 -2.14 1.27
D4 -0.13 -0.27 -1.12 1.52
L1 -0.13 -0.27 4.96 -5.10
Higher Technological Institute 10th of Ramadan City
L1 -0.13 -0.27 4.96 -5.10 -0.40 4.83 -5.23 4.56 -5.50 4.83 -5.50 CASE(II)
Higher Technological Institute 10th of Ramadan City
L2 0.79 1.63 1.59 -4.64 2.42 2.38 -3.85 4.01 -2.22 4.01 -3.85 CASE(II)
L3 1.23 2.53 -0.52 -4.00 3.76 0.71 -2.77 3.24 -0.24 3.24 -2.77 CASE(I)
L4 1.37 2.81 -1.77 -3.27 4.18 -0.40 -1.90 2.41 0.91 2.41 -1.90 CASE(I)
U1 -0.84 -1.72 -1.95 4.55 -2.56 -2.79 3.71 -4.51 1.99 3.71 -4.51 CASE(II)
U2 -1.29 -2.64 0.28 3.99 -3.93 -1.01 2.70 -3.65 0.06 2.70 -3.65 CASE(I)
U3 -1.43 -2.92 1.66 3.32 -4.35 0.23 1.89 -2.69 -1.03 1.89 -2.69 CASE(I)
U4 -1.36 -2.78 2.39 2.58 -4.14 1.03 1.22 -1.75 -1.56 1.22 -1.75 CASE(I)
V1 -0.93 -1.91 3.37 -0.47 -2.84 2.44 -1.40 0.53 -3.31 2.44 -3.31 CASE(I)
V2 -0.53 -1.08 2.53 -0.76 -1.61 2.00 -1.29 0.92 -2.37 2.00 -2.37 CASE(II)
V3 -0.19 -0.39 1.74 -1.03 -0.58 1.55 -1.22 1.16 -1.61 1.55 -1.61 CASE(II)
V4 0.22 0.45 -0.42 -0.48 0.67 -0.20 -0.26 0.25 0.19 0.25 -0.26 CASE(I)
“Design of Steel Structures I” III-Load combination
LOAD CASES
CASE (II) CASE (II)
Mem DL LL WL WR CASE (I) CASE (II) DF NOTES
/ CASE (I)
DL+LL DL+WL DL+WR DL+LL+WL DL+LL+WR "+VE" "-VE"
D1 1.31 2.69 -4.77 0.66 4.00 -3.46 1.97 -0.77 4.66 4.66 -3.46 CASE(I)
D2 0.69 1.41 -3.29 0.99 2.10 -2.60 1.68 -1.19 3.09 3.09 -2.60 CASE(II)
D3 0.23 0.47 -2.14 1.27 0.70 -1.91 1.50 -1.44 1.97 1.97 -1.91 CASE(II)
D4 -0.13 -0.27 -1.12 1.52 -0.40 -1.25 1.39 -1.52 1.12 1.39 -1.52 CASE(II)
L1 -0.13 -0.27 4.96 -5.10 -0.40 4.83 -5.23 4.56 -5.50 4.83 -5.50 CASE(II)
Higher Technological Institute 10th of Ramadan City
L2 0.79 1.63 1.59 -4.64 2.42 2.38 -3.85 4.01 -2.22 4.01 -3.85 CASE(II)
L3 1.23 2.53 -0.52 -4.00 3.76 0.71 -2.77 3.24 -0.24 3.24 -2.77 CASE(I)
L4 1.37 2.81 -1.77 -3.27 4.18 -0.40 -1.90 2.41 0.91 2.41 -1.90 CASE(I)
U1 -0.84 -1.72 -1.95 4.55 -2.56 -2.79 3.71 -4.51 1.99 3.71 -4.51 CASE(II)
U2 -1.29 -2.64 0.28 3.99 -3.93 -1.01 2.70 -3.65 0.06 2.70 -3.65 CASE(I)
U3 -1.43 -2.92 1.66 3.32 -4.35 0.23 1.89 -2.69 -1.03 1.89 -2.69 CASE(I)
U4 -1.36 -2.78 2.39 2.58 -4.14 1.03 1.22 -1.75 -1.56 1.22 -1.75 CASE(I)
V1 -0.93 -1.91 3.37 -0.47 -2.84 2.44 -1.40 0.53 -3.31 2.44 -3.31 CASE(I)
V2 -0.53 -1.08 2.53 -0.76 -1.61 2.00 -1.29 0.92 -2.37 2.00 -2.37 CASE(II)
V3 -0.19 -0.39 1.74 -1.03 -0.58 1.55 -1.22 1.16 -1.61 1.55 -1.61 CASE(II)
V4 0.22 0.45 -0.42 -0.48 0.67 -0.20 -0.26 0.25 0.19 0.25 -0.26 CASE(I)
“Design of Steel Structures I” III-Load combination
LOAD CASES
CASE (II) CASE (II)
Mem DL LL WL WR CASE (I) CASE (II) DF NOTES
/ CASE (I)
DL+LL DL+WL DL+WR DL+LL+WL DL+LL+WR "+VE" "-VE"
D1 1.31 2.69 -4.77 0.66 4.00 -3.46 1.97 -0.77 4.66 4.66 -3.46 CASE(I) 4.00 TEN. &CHECK-COMP.
D2 0.69 1.41 -3.29 0.99 2.10 -2.60 1.68 -1.19 3.09 3.09 -2.60 CASE(II) 3.09 TEN. &CHECK-COMP.
D3 0.23 0.47 -2.14 1.27 0.70 -1.91 1.50 -1.44 1.97 1.97 -1.91 CASE(II) 1.97 TEN. &CHECK-COMP.
D4 -0.13 -0.27 -1.12 1.52 -0.40 -1.25 1.39 -1.52 1.12 1.39 -1.52 CASE(II) -1.52 COMP. &CHECK-TEN.
L1 -0.13 -0.27 4.96 -5.10 -0.40 4.83 -5.23 4.56 -5.50 4.83 -5.50 CASE(II) -5.50 COMP. &CHECK-TEN.
Higher Technological Institute 10th of Ramadan City
L2 0.79 1.63 1.59 -4.64 2.42 2.38 -3.85 4.01 -2.22 4.01 -3.85 CASE(II) 4.01 TEN. &CHECK-COMP.
L3 1.23 2.53 -0.52 -4.00 3.76 0.71 -2.77 3.24 -0.24 3.24 -2.77 CASE(I) 3.76 TEN. &CHECK-COMP.
L4 1.37 2.81 -1.77 -3.27 4.18 -0.40 -1.90 2.41 0.91 2.41 -1.90 CASE(I) 4.18 TEN. &CHECK-COMP.
U1 -0.84 -1.72 -1.95 4.55 -2.56 -2.79 3.71 -4.51 1.99 3.71 -4.51 CASE(II) -4.51 COMP. &CHECK-TEN.
U2 -1.29 -2.64 0.28 3.99 -3.93 -1.01 2.70 -3.65 0.06 2.70 -3.65 CASE(I) -3.93 COMP. &CHECK-TEN.
U3 -1.43 -2.92 1.66 3.32 -4.35 0.23 1.89 -2.69 -1.03 1.89 -2.69 CASE(I) -4.35 COMP. &CHECK-TEN.
U4 -1.36 -2.78 2.39 2.58 -4.14 1.03 1.22 -1.75 -1.56 1.22 -1.75 CASE(I) -4.14 COMP. &CHECK-TEN.
V1 -0.93 -1.91 3.37 -0.47 -2.84 2.44 -1.40 0.53 -3.31 2.44 -3.31 CASE(I) -2.84 COMP. &CHECK-TEN.
V2 -0.53 -1.08 2.53 -0.76 -1.61 2.00 -1.29 0.92 -2.37 2.00 -2.37 CASE(II) -2.37 COMP. &CHECK-TEN.
V3 -0.19 -0.39 1.74 -1.03 -0.58 1.55 -1.22 1.16 -1.61 1.55 -1.61 CASE(II) -1.61 COMP. &CHECK-TEN.
V4 0.22 0.45 -0.42 -0.48 0.67 -0.20 -0.26 0.25 0.19 0.25 -0.26 CASE(I) 0.67 TEN. &CHECK-COMP.
“Design of Steel Structures I”
2.6 Example
Calculate all loads acting on the shown truss, knowing that the spacing between
trusses 6m.
Higher Technological Institute 10th of Ramadan City
SOLUTION
II- Structural
IV- DESIGN
I- Load Analysis to III- Load
according to the
Calculation obtain straining combination
design force
action