VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 -
0+040
Date :
Settings
(input for current task)
Materials and standards
Concrete structures : ACI 318-11
Wall analysis
Active earth pressure calculation : Mazindrani (Rankine)
Passive earth pressure calculation : Mazindrani (Rankine)
Earthquake analysis : Mononobe-Okabe
Shape of earth wedge : Consider always vertical
Base key : The base key is considered as inclined footing bottom
Allowable eccentricity : 0.167
Verification methodology : Safety factors (ASD)
Safety factors
Permanent design situation
Safety factor for overturning : SFo = 2.00 [–]
Safety factor for sliding resistance : SFs = 2.00 [–]
Safety factor for bearing capacity : SFb = 1.00 [–]
Material of structure
Unit weight = 23.00 kN/m 3
Analysis of concrete structures carried out according to the standard ACI 318-11.
1
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
Coordinate Depth
No.
X [m] Z [m]
11 -0.25 0.00
The origin [0,0] is located at the most upper right point of the wall.
Wall section area = 2.90 m2.
Name : Geometry Stage - analysis : 1 - 0
0.25
3.50 14.00:1
4.00
4.40
1.10 1.25
0.50
0.90
2.85 0.40
2
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
Name : Profile and assignment Stage - analysis : 1 - 0
4.00
4.40
1. SUELO CONTENIDO
2.85
Foundation
Type of foundation : input parameters of contact base-soil
Parameters
Angle of friction base-soil = 27.00 °
Cohesion base-soil a = 11.77 kPa
Terrain profile
Terrain behind the structure is flat.
Water influence
Ground water table is located below the structure.
Input surface surcharges
Surcharge Mag.1 Mag.2 Ord.x Length Depth
No. Action
new change [kN/m2] [kN/m2] x [m] l [m] z [m]
1 Yes permanent 5.88 on terrain
No. Name
1 S/C
Resistance on front face of the structure
Resistance on front face of the structure: 1/3 pass., 2/3 at rest
Soil on front face of the structure - SUELO CONTENIDO
Soil thickness in front of structure h = 0.50 m
3
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
4.00
4.40
0.50
2.85
4
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
7.35
78.93
4.00
66.64 4.40
9.22
70.87
2.72
+x
2.85
+z
Eccentricity verification
Max. eccentricity of normal force e = 0.074
Maximum allowable eccentricity ealw = 0.167
Eccentricity of the normal force is SATISFACTORY
5
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
Name : Bearing cap. Stage - analysis : 1 - -1
4.00
4.40
2.85
2.85
31.63
82.18
Dimensioning No. 1
Wall stem check - front reinf.
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -1.56 30.17 0.31 1.000
Pressure at rest 63.75 -1.17 0.00 0.50 1.000
S/C 11.88 -1.75 0.00 0.50 1.000
Wall stem check - front reinf.
Front reinforcement is not required.
Wall stem check - back reinf.
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -1.56 30.17 0.31 1.000
Pressure at rest 63.75 -1.17 0.00 0.50 1.000
S/C 11.88 -1.75 0.00 0.50 1.000
Wall stem check - back reinf.
Wall check at the construction joint 3.50 m from the wall crest
Reinforcement and dimensions of the cross-section
5 prof. No. 5, cover 75.0 mm
Inputted reinforcement area = 989.7 mm 2
Required reinforcement area = 816.8 mm 2
Cross-section width = 1.00 m
Cross-section height = 0.50 m
6
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
Wall jump check
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -1.04 66.64 1.48 1.000
FF resistance -2.72 -0.17 0.00 0.00 1.000
Weight - earth wedge 0.00 -2.25 78.93 2.23 1.000
Active pressure 70.87 -1.07 0.00 2.85 1.000
S/C 9.22 -1.79 0.00 2.85 1.000
S/C 0.00 -4.00 7.35 2.23 1.000
Wall jump check
Reinforcement and dimensions of the cross-section
5 prof. No. 4, cover 75.0 mm
Inputted reinforcement area = 633.4 mm 2
Required reinforcement area = 440.2 mm 2
Cross-section width = 1.00 m
Cross-section height = 0.50 m
Reinforcement ratio = 0.15 % > 0.11 % = min
Position of neutral axis c = 0.02 m < 0.18 m = cmax
Ultimate shear force Vn = 250.07 kN > 67.02 kN = Vu
Ultimate moment Mn = 96.73 kNm > 50.93 kNm = Mu
Cross-section is SATISFACTORY.
Wall heel check
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -0.25 14.38 2.23 1.000
Weight - earth wedge 0.00 -2.25 78.93 2.23 1.000
Active pressure 70.87 -1.07 0.00 2.85 1.000
S/C 9.22 -1.79 0.00 2.85 1.000
Contact stress 0.00 0.00 -53.40 2.17 1.000
Gravity surch. 1 0.00 -4.00 7.35 2.23 1.000
Wall heel check
Reinforcement and dimensions of the cross-section
5 prof. No. 4, cover 75.0 mm
Inputted reinforcement area = 633.4 mm 2
Required reinforcement area = 367.0 mm 2
Cross-section width = 1.00 m
Cross-section height = 0.50 m
Reinforcement ratio = 0.15 % > 0.09 % = min
Position of neutral axis c = 0.02 m < 0.18 m = cmax
7
MURO DE CONTENCION H=4.00 M
VIA PRINCIPAL N° 02 - LADO DERECHO - TRAMO 02 - PROG. 0+035 - 0+040
Name : Dimensioning Stage - analysis : 1 - 1
7.35
78.93
70.87
+x
5 prof. No. 4, cover. 75.0mm
2.85
+z 53.40