Professional Documents
Culture Documents
(DCN)
Yes No
Inacial implication:
Proposed Solution:
1. Insert Plate Removed & HST-Hilti bolt given in the drawing.
Signature: Signature:
TYP
500
40
17
22
PLANT NORTH
40
REFER WASTE WATER PUMP
1822 990 1392 894 FOUNDATION DETAIL SEPARATE DRAWING
TR
UE
F18 SH1-HEG-P1HTL-C-M05-DSW-0005
3120
NO
PUMP HOUSE
PIPE SUPPORT
RT
This DWG.
1GH
H
990
990
3 REFER WASTE WATER TANK E-E
40
24 UNIT-02 UNIT-01
45°
PILE CAP DETAIL SEPARATE DRAWING REFER WASTE WATER HC PUMP
19
50
2245
SH1-HEG-P1HTL-C-M05-DSW-0002 M 1:25
FOUNDATION DETAIL SEPARATE DRAWING GRADE SLAB
F18 SH1-HEG-P1HTL-C-M05-DSW-0006 (FOR ABSORBER AREA ALL ROUND)
1255
200mm THK.
1419
20 EL.+3.350mTOC/TOF 1934 1742
GGH SUPPORT FOUNDATION ISOLATION JOINT 3304 901 894 1AST 1392
P4 ISO
4150
EL(+)3.200m (TOPC) TYP LA 20 A ABSORBER
507
TIO REFER ABSORBER STAIR CASE PLOYSULPHIDE 626
POLYMER SEALANT (TYP) EL.+3.700m
902 450
NJ
IS
P5 F19 FOUNDATION DETAIL SEPARATE DRAWING
881
F21 (T.O.C)
OL
3500 1700 1300 1260 OIN SH1-HEG-P1HTD-C-M05-DSW-0008 PERMOULDED FLEXIBLE
20 ION
T
AT
JOINT FILLER THK.20 (TYP)
2049
EL.+3.350m
300
150
20 901 20 SLOPE 1:50
ISOLATION JOINT 360 TOC/TOF TYP
JO
0
200
SF8 (TYP) 2560 F20
300
F22
NT
1054 2501 3118 1AST EL.+3.200m
SF7 P5
1800
B FGL ABSORBER LEGEND:-
2089
P7 P6 P7
1400
SL FOUNDATION
100
1CPR1
1496
2 60° F23 500 01. F.F.L - FINISHED FLOOR LEVEL
780
02. B.O.P - BOTTOM OF PLATE
1400 F26 F27 1CPR2 900 1606 B.O.C 03. T.O.C - TOP OF CONCRETE
1 LEAN CONCRETE
3160
1CPR1 P8
2000
500 1CPR1 1AST 100mm THK. 04. B.O.C - BOTTOM OF CONCRETE
TYP A C F22 1
DRAIN 1CPR2 F22 COMPACTED BACK FILLING OF SAND 05. F.G.L - FINISHED GROUND LEVEL
F26 SLOPE 1:200 06. TOG - TOP OF GROUTING
A
P6 07. SOP - SETTING OUT POINT
1CPR1 08. TOPC - TOP OF PILE CAP
6300
1
2265
1CPR1
12230
GGH SUPPORT FOUNDATION B 4530 NOTE:
EL(+)3.200m (TOPC) TYP 1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS
GRADE SLAB OTHERWISE NOTED AND COORDINATES ARE IN METERS UNLESS
200mm THK. OTHERWISE NOTED.
EL.+3.350mTOC/TOF 2. FINISHED GROUND LEVEL ELEVATION OF PLANT AREA
GL ±0.000m = EL.+3.200m
8626
3. CONCRETE STRENGTH
8420
1) f'c=28.0MPa : STRUCTURAL CONCRETE SUCH AS SUPER-
1GH STRUCTURE AND FOUNDATION.
2 2) f'c=21.0MPa : NON-STRUCTURAL CONCRETE SUCH AS SLEEPER,
EDB AND PAVING.
GGH-01 ABSORBER-01 3) f'c=10.0MPa : LEAN CONCRETE.
WHERE, f'c=CYLINDER COMPRESSIVE STRENGTH AT 28-DAY
4. REINFORCING BAR STRENGTH
9116 10600 1)WELDED WIRE FABRIC: ASTM-A-185 FOR PLAIN WIRE FABRIC
21650 AND ASTM-A-497 FOR WELDED DEFORMED WIRE FABRIC
TYP
2) DEFORMED BILLET-STEEL BARS :
fy=390MPa(N/mm2) (GRADE SD390)
E E
F F 5. CONCRETE COVER (CAST-IN-PLACE CONCRETE)
1934 1742 CONDITION OF EXPOSURE FOUNDATION COLUMN WALL
BEAM SLAB
CL OF FDN CONCRETE NOT
EXPOSED TO WEATHER - 40 30
200 300 200
CONCRETE EXPOSED TO
21519
SF
0 1 WITH EPOXY. NO WELDING TIES TO HY REBAR IS PERMISSABLE.
0
30
2
15 9.BAR SCHEDULE DETAILS SHALL COMPLY WITH THE STANDARD
2300 350 2597 487
2
30
95
29
00 4
00
0 SPLICE,ETC.,)
00
0 P1
15 10.SOIL LAYER UNDER LEAN CONCRETE IS COMPACTED SAND K>=0.9.
29
0
95
10
1GH 15
00
1 00 REFERENCE DRAWINGS:-
737
955
00
300
10
P1 P1
1622
666
250 F17 3499 4474 4474 4052 SH1-HEG-P0HTD-C-M05-DFN-0001
FGD PLOT PLAN AT GROUND LEVEL
1100 Q F28a Q P1
1350 350 15500 1APS FGD PILE CAP FOUNDATION DETAIL FOR
487
SF5a E SH1-HEG-P1HTD-C-M05-DSW-0002
ABSORBER (TOP & BOTTOM LAYER) UNIT-1
1300 13100 1100
45°
P3
1100
F17 SF1
42.5
1025
ODCN1
1250
F28 P1 A=2395.292 FGD ABSORBER RECIRCULATION PIPE SUPPORTHAMON OTHER (Z = positive up)
1PR3 1PR3 1035
21°
42.5
SH1-HEG-P1HTD-C-M05-DFN-0008 Z Y
21°
5545
2942
20
1088
1088
ISOLATION JOINT
5038
2900
1650
1014
1014
21°
1800
1PR3
21°
1600
2°
1246
20
ENGINEERING
680
TYP
1APS P1
700
F17 1APS 1APS VIETNAM OIL AND GAS GROUP FICHTNER GmbH & Co. KG PV ENGINEERING
2°
1054 513
(PVN)
900 394 P2
2300
2300
394 3311
1915
1915
1704
1610
1567
1567
B A C D
1054
1054
F24
GAP
GAP
GAP
611
611
20
20
20
SF4 (LILAMA)
965 2250 2250 2250 2250 2250 2250 1035 A=2392.588 P3 1100 F25
225
F24 F24 F24 SF6
B=2071.847 P3 P3 SONG HAU 1 THERMAL POWER PLANT
870
SF5
50
ODCN1 SF5 ODCN1
1400
450
450
2 x 600MW
PUMP HOUSE-01 P3 ODCN1 P3 P3 ODCN1
P3
225
1097 915
1PH 1PH 1PH 1PH 1PH 1PH
A B C D E F
HAMON
HAMON RESEARCH - COTTRELL GmbH
HAMON
Hamon Research-Cottrell
A0 (1189x841)
KEY PLAN
REINFORCEMENT DETAIL 39º59
SHALLOW FOUNDATION SF1-1Nos. / P1-6Nos & P2-4Nos. FOR PEDESTAL-P1 '.59.50"
PLAN
700
PLANT NORTH
100 15500 100 350 350
TR
CL PED.
UE
7715 7785
CROSS TIES
CL PED.
350 350
NO
PUMP HOUSE
1300 13100 1100 D10@200 PIPE SUPPORT
RT
700
This DWG.
C D
H
100
UNIT-02 UNIT-01
CROSS TIES
D10@200
SF1 HOOP BAR MAIN BAR LEGEND:-
1APS 1APS 1APS D10@200 16-D16 01. F.F.L - FINISHED FLOOR LEVEL
B C D
1025
1025
1100
02. B.O.P - BOTTOM OF PLATE
1250
1300
2 1°
D20@150(TOP)
700
21°
TOP REINFORCEMENT
TYP
965 5 D20@150(BOTT.) 1035 04. B.O.C - BOTTOM OF CONCRETE
P1 P1 FOR PEDESTAL-P1 05. F.G.L - FINISHED GROUND LEVEL
2387
P2 1APS CL PEDESTAL1APS P2 06. TOG - TOP OF GROUTING
5 5
2900
1014
1014
TYP 1650 1APS ==
1000
P1 CL PED. D16@200C/C
21°
TYP 3
21°
2250 2250 1APS
1800
P1 P2 P2 4
CL PED.
P1
1600
D20@150(TOP)
1246
1246
CL PEDESTAL1APS
700
==
1APS D20@150(BOTT.) 1APS 1APS
TYP
4
700
A 4 1APS B
862
2
650
513
513
A A
100
1650
965 4500 4500 4500 1035
GROUT(TYP)
3. CONCRETE STRENGTH
GROUT(TYP)
CROSS TIES
A-A
CL PED.
350 350
D10@200 1) f'c=28.0MPa : STRUCTURAL CONCRETE SUCH AS SUPER-
700
M 1:25 STRUCTURE AND FOUNDATION.
5@270 = 1350 5@270 = 1350 (NOT SHOWN GRADE SLAB) 5@270 = 1350 5@270 = 1350 150
EL.+4.100m 150 EL.+4.100m 2) f'c=21.0MPa : NON-STRUCTURAL CONCRETE SUCH AS SLEEPER,
75
CROSS TIES
D16@200 CL PED. CL PED. CL PED.
D10@200
3) f'c=10.0MPa : LEAN CONCRETE.
EL.+3.700m 400 EL.+3.700m EL.+3.700m HOOP BAR MAIN BAR
75
75
75
P2
75
75
75
75
1100
D10@200
D10@200
P1 P1 P2 P1 P2
75
75
75
D10@200
FGL 20-D20 AND ASTM-A-497 FOR WELDED DEFORMED WIRE FABRIC
TOP REINFORCEMENT
1000
P2
700
700
700
16-D16 16-D16 16-D16 2) DEFORMED BILLET-STEEL BARS :
20-D20 20-D20 20-D20
D20@150(TOP) FOR PEDESTAL-P2 fy=390MPa(N/mm2) (GRADE SD390)
75
75
75
75
D20@150(TOP)
1000
CL PED.
(TYP)
WELL COMPACTED EARTH CONCRETE EXPOSED TO
100
100 Lean concrete EARTH OR WEATHER
700
75 50 40
==
(TYP) 100mm thk D20@150(BOTTOM)
D20@150(BOTTOM) (GROUND WATER (75) (75) (75)
15500 OR SEA WATER)
CONCRETE CAST AGAINST
AND PERMANENTLY 75 75 75
EXPOSED TO EARTH
BOTTOM SIDE 200 N/A N/A
50 NONSHRINKAGE
OF PILE FOUNDATION (JRA CODE)
SHALLOW FOUNDATION SF2-2Nos. / P1-4Nos.
PLAN C-C D-D 6. CHAMFERED CORNERS OF CONCRETE
B-B
GROUT
M 1:25 ALL EXTERIOR CORNERS (ANGLE OF 90° OR LESS) OF
M 1:25
C
50 NONSHRINKAGE
50 NONSHRINKAGE
CL PED. REINFORCED CONCRETE SHALL BE CHAMFERED (20mmX20mm).
M 1:25
2387 513 7. SITE WORK SHALL BE PERFORMED COMPLY WITH CONTRACT
D16@200 D10@200 200200 SPECIFICATION.
GROUT
GROUT
3000 EL.+4.100m 8. FORMWORK TIES WILL BE THREADED REMOVABLE TYPE
CL PED.
75
100 1500 1500 100 CL PED. TOC
100
1250 1000 650 TO MAINTAIN MINIMUM COVER TO THE THREADS AND SEALED
WITH EPOXY. NO WELDING TIES TO HY REBAR IS PERMISSABLE.
SF2 D16@200 CL PED. (950) (950) 9.BAR SCHEDULE DETAILS SHALL COMPLY WITH THE STANDARD
D16@200
75
400 EL.+3.700m 175 175 175 EL.+3.700m P2
75
175 DRAWING NO:SH1-DHI-B0100-C-M01-DST-5707(INCLUDING DEVELOPMENT,
75
75
900
TOC TOC EL.+3.200m SPLICE,ETC.,)
D10@200
700
1400
10.10.SOIL LAYER UNDER LEAN CONCRETE IS COMPACTED SAND K>=0.9.
950
1100
EL.+3.200m EL.+3.200m FGL
500
500
P1
75
75
D10@200
P1 D10@200 P1 P1 20-D20
75
75
FGL FGL
1000
1000
700
CL PEDESTAL1APS
75
700
700
1000
REFERENCE DRAWINGS:-
75
D20@150(TOP)
75
D20@150(TOP)
EL.+2.200m
1000
1000
500
2900
1000
500
D20@150(TOP)
D20@150(BOTT.) C CL PEDESTAL
HAMON OTHER (Z = positive up)
Z Y
1APS 1APS
A E
BOLT LOCATION PLAN - P2 FICHTNER
Gmbh & Co.KG
(TYP) VIETNAM OIL AND GAS GROUP FICHTNER GmbH & Co. KG
ENGINEERING
PV ENGINEERING
1650 (PVN)
ISOLATION JOINT
825 825
ISOLATION JOINT
150 5 @ 270 = 1350 150
CL PED. ANCHOR BOLT 12NosxM24-630Lg. G-G
20THK.
H-H (SH1-HEG-P1HTD-C-M05-DFN-0008)
CL PED.
350 350
200
200
350 350
(SH1-HEG-P1HTD-C-M05-DFN-0008)
630
M 1:20
480
(EL)
700
100
100
150
EL.+4.100m CL PED.
H H T.O.C
G G COMPACTED BACK MIN. THK.0.06" P.E SHEET (2LAYER)
630
HAMON
ISOLATION JOINT
FOR ALL AROUND HAMON RESEARCH - COTTRELL GmbH
HAMON
PEDESTAL,DRAIN,STAIR CASE,PUMP
& TANK FOUNDATION Hamon Research-Cottrell
A0 (1189x841)
F-F L-L M-M N-N
KEY PLAN
M 1:15 39º59
EL.+3.350m M 1:10 '.59.50"
D10@150C/C
M 1:15 M 1:15
FFL/TOC CL OF PED. CL OF PED.
CL OF PED.
D10@150C/C 200THK.GRADE SLAB
PLANT NORTH
F24 F25 F24
EL.+3.200m 450 EL.+3.444m 450 EL.+3.434m 450 EL.+3.444m
TR
100 250 100 100 250 100
UE
T.O.C T.O.C
75 150 94 75 75
75 15094 75 75
100 250 100 T.O.C
75 150 134100 75
100 200
FGL
ODCN1
300
ODCN1 ODCN1
NO
PUMP HOUSE
EL.+3.200m EL.+3.200m EL.+3.200m
300 234
PIPE SUPPORT
244
244
75
75
RT
This DWG.
FGL FGL FGL
H
P3 P3 P3
UNIT-02 UNIT-01
300
300
COMPACTED BACK 12-D16 12-D16 12-D16
500 D12@150(TOP) D12@150(TOP) D12@150(TOP)
600
600
600
FILLING OF SAND LEGEND:-
MIN. THK.0.06" P.E SHEET (2LAYER)
EL.+2.600m EL.+2.600m EL.+2.600m
300
300
300
SAND SHEET 01. F.F.L - FINISHED FLOOR LEVEL
B.O.C B.O.C B.O.C 02. B.O.P - BOTTOM OF PLATE
03. T.O.C - TOP OF CONCRETE
COMPACTED SAND COMPACTED SAND COMPACTED SAND 04. B.O.C - BOTTOM OF CONCRETE
TYPICAL PIPE SUPPORT - F17,18,19,20,21,22&23
100 1100 Lean concrete 100 1100 Lean concrete 100 1100 Lean concrete 05. F.G.L - FINISHED GROUND LEVEL
(TYP) 100mm thk (TYP) 100mm thk (TYP) 100mm thk 06. TOG - TOP OF GROUTING
CL SUPPORT D12@150(BOTTOM) D12@150(BOTTOM) D12@150(BOTTOM) 07. SOP - SETTING OUT POINT
CONCRETE 08. IP - INSERT PLATE
ENCASING M16 HILTI BOLT D10@150C/C
(TYP) (TYP) HEAVY DUTY FLOOR WITH
EL.+3.350m NON METALIC HARDENER
150
FGL
PLAN PLAN PLAN
D12@150(TOP) ODCN1 D12@150(TOP) ODCN1 D12@150(TOP) ODCN1
LEAN CONCRETE(THK.100) D12@150(BOTT.) D12@150(BOTT.) D12@150(BOTT.)
GRADE-M10 (TYP) 1100 1100 1100 NOTE:
100
100
100
D10@150C/C == == ==
MIN. THK.0.06" P.E SHEET (2LAYER)
COMPACTED BACK FILLING OF SAND 1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS
SAND SHEET OTHERWISE NOTED AND COORDINATES ARE IN METERS UNLESS
OTHERWISE NOTED.
225
D12@150(TOP) 2. FINISHED GROUND LEVEL ELEVATION OF PLANT AREA
450
==
550
D12@150(BOTT.) GL ±0.000m = EL.+3.200m
875
REINFORCEMENT DETAIL TOP REINFORCEMENT 3. CONCRETE STRENGTH
1100
1100
1100
FOR PEDESTAL-P3 FOR PEDESTAL-P3 450 1) f'c=28.0MPa : STRUCTURAL CONCRETE SUCH AS SUPER-
P3450
450
==
MARK NO: (F24,25) == STRUCTURE AND FOUNDATION.
MARK NO: (F24,25)
450 == P3 2) f'c=21.0MPa : NON-STRUCTURAL CONCRETE SUCH AS SLEEPER,
450
875
550
== EDB AND PAVING.
P3
450
CL PED. CL PED. D10@150C/C
==
3) f'c=10.0MPa : LEAN CONCRETE.
225
450
L C PED.
450
CL PED. 100
100
100
D12@150(TOP) D12@150(TOP) AND ASTM-A-497 FOR WELDED DEFORMED WIRE FABRIC
225
75
P1 EL.+3.200m OF PILE FOUNDATION (JRA CODE)
ODCN1 LEAN CONCRETE(THK.100)
EL.+3.200m FGL ODCN1
244
300 109
6. CHAMFERED CORNERS OF CONCRETE
75
GRADE-M10 (TYP) P3
75 150 109
FGL D12@150(TOP) ALL EXTERIOR CORNERS (ANGLE OF 90° OR LESS) OF
MIN. THK.0.06" P.E SHEET (2LAYER)
COMPACTED BACK FILLING OF SAND 12-D16 REINFORCED CONCRETE SHALL BE CHAMFERED (20mmX20mm).
SAND SHEET
300
600
D12@150(TOP) SPECIFICATION.
600
EL.+2.600m
300
8. FORMWORK TIES WILL BE THREADED REMOVABLE TYPE
EL.+2.600m B.O.C
300
(TYP)
FOUNDATION FOR SF3 REFERENCE DRAWINGS:-
200
PLAN ODCN1
FOUNDATION FOR SF5a DRAWING NUMBER DRAWING TITLE
100
LEAN CONCRETE(THK.100)
1100 GRADE-M10 (TYP) PLAN ODCN1 SH1-HEG-P0HTD-C-M05-DFN-0001 FGD PLOT PLAN AT GROUND LEVEL
== D12@150(TOP)
MIN. THK.0.06" P.E SHEET (2LAYER)
COMPACTED BACK FILLING OF SAND FGD PILE CAP FOUNDATION DETAIL FOR
D12@150(BOTT.) SH1-HEG-P1HTD-C-M05-DSW-0002
D12@150(TOP) SAND SHEET 1100 ABSORBER (TOP & BOTTOM LAYER) UNIT-1
100
D12@150(BOTT.)
100
== FGD PILE CAP & PEDESTAL LAYOUT AND
SH1-HEG-P1HTF-C-M05-DSW-0002
DETAIL FOR PUMP HOUSE SUPPORT
STRUCTURE UNIT-1
P3
550
450
M 1:15 P3
550
==
1100
IP-1
450
PERMOULDED FLEXIBLE
450
==
550
==
450 GGH SUPPORT FOUNDATION JOINT FILLER THK.20 (TYP)
== 350
EL(+)3.200m (TOPC) TYP M16 HILTI BOLT EL.+3.350m FICHTNER
CL OF PILE CAP
550
K K 20 FGL/TOC
EL.+3.200m (TYP) 450 Gmbh & Co.KG
100
ENGINEERING
CL OF SUPPORT 28a ==
12
150
FGL/TOC VIETNAM OIL AND GAS GROUP FICHTNER GmbH & Co. KG PV ENGINEERING
D12@150(TOP)
D12@150(BOTT.)
R R (PVN)
IP-1
100
D12@150(TOP)
D12@150(BOTT.)
VIETNAM MACHINERY TOKYO ELECTRIC POWER SERVICES
INSTALLATION CORPORATION COMPANY LIMITED - TEPSCO
(LILAMA)
1600
EL.+1.600m
Lean concrete
HAMON
100mm thk
3400x4600 100
HAMON RESEARCH - COTTRELL GmbH
HAMON
Hamon Research-Cottrell
A0 (1189x841)
50 NONSHRINKAGE
S-S KEY PLAN
U-U
GROUT
M 1:15 T-T 39º59
50 NONSHRINKAGE
'.59.50"
M 1:15
ODCN1 F25 C OF PED.
CL OF PED. M 1:15 EL.+3.400m CL PED.
GROUT
L
75
PLANT NORTH
500 TOC
EL.+3.444m 450 450 EL.+3.434m
TR
F24 EL.+3.200m
T.O.C 100 250 100 100 250 100 EL.+3.400m
75 150 94 75 75
UE
T.O.C CL PED. CL PED. CL PED.
200
75
FGL
75
ODCN1 TOC
NO
EL.+3.200m PUMP HOUSE
244
PIPE SUPPORT
75
75
75 150 150 84
RT
FGL This DWG.
75
EL.+3.200m
H
P3
(D10@150)
200
P3 FGL P7
75
UNIT-02 UNIT-01
300
12-D16 12-D16
700
P6 P7 P8 12-D20
800
D12@150(TOP)
75
600
(D10@150)
LEGEND:-
EL.+2.600m D16@150(TOP)
300
600
700
B.O.C 16-D20 12-D20 16-D20
75
02. B.O.P - BOTTOM OF PLATE
D25@125(TOP) 03. T.O.C - TOP OF CONCRETE
75
COMPACTED SAND 04. B.O.C - BOTTOM OF CONCRETE
400
100 1600 Lean concrete
EL.+2.000m 05. F.G.L - FINISHED GROUND LEVEL
(TYP) 100mm thk B.O.C 06. TOG - TOP OF GROUTING
500
07. SOP - SETTING OUT POINT
D12@150(BOTTOM) EL.+2.000m WELL COMPACTED EARTH
B.O.C 100 1400
FOUNDATION FOR SF6 (TYP) Lean concrete
WELL COMPACTED EARTH D16@150(BOTTOM) 100mm thk
PLAN 100 4530X3160
ODCN1
D12@150(TOP) (TYP)
D25@125(BOTTOM) Lean concrete FOUNDATION FOR SF8
D12@150(BOTT.) 1600 100mm thk PLAN
525 500 575 1400
IP-1 D16@150(TOP) 700 700 NOTE:
100
D16@150(BOTT.)
1. ALL DIMENSIONS AND ELEVATIONS ARE IN MILLIMETERS UNLESS
450
== FOUNDATION FOR SF7 OTHERWISE NOTED AND COORDINATES ARE IN METERS UNLESS
P3
475
PLAN 600
OTHERWISE NOTED.
700
2. FINISHED GROUND LEVEL ELEVATION OF PLANT AREA
450
==
1400
1) f'c=28.0MPa : STRUCTURAL CONCRETE SUCH AS SUPER-
600
D16@150(TOP)
D16@150(BOTT.) STRUCTURE AND FOUNDATION.
450
700
475
700
600
1)WELDED WIRE FABRIC: ASTM-A-185 FOR PLAIN WIRE FABRIC
1390
IP-1 D25@125(TOP) AND ASTM-A-497 FOR WELDED DEFORMED WIRE FABRIC
D12@150(TOP) D25@125(BOTT.) 2) DEFORMED BILLET-STEEL BARS :
D12@150(BOTT.) 60° fy=390MPa(N/mm2) (GRADE SD390)
780
W-W BOLT LOCATION PLAN-P7 5. CONCRETE COVER (CAST-IN-PLACE CONCRETE)
M 1:20
600 CONDITION OF EXPOSURE FOUNDATION COLUMN WALL
P8 CL PED.
BEAM SLAB
300 300 CONCRETE NOT - 40 30
(PL)
EXPOSED TO WEATHER
145
EL.+3.400m 400 125 350 125 CONCRETE EXPOSED TO
3160
2000
600
(PL=145mm, EL=400mm) (GROUND WATER (75) (75) (75)
175125125175
CL PED.
545
300 300
700 (SEE SH1-HEG-P0HTG-C-M05-DFN-XXX) OR SEA WATER)
400
(EL)
600
CONCRETE CAST AGAINST
1138
T 700
T AND PERMANENTLY
EXPOSED TO EARTH
75 75 75
FOR PEDESTAL-P7 FOR PEDESTAL-P7 7. SITE WORK SHALL BE PERFORMED COMPLY WITH CONTRACT
D25@125(TOP) 600 SPECIFICATION.
600
632
300 300 8. FORMWORK TIES WILL BE THREADED REMOVABLE TYPE
550
CL PED.
CROSS TIES 9.BAR SCHEDULE DETAILS SHALL COMPLY WITH THE STANDARD
300 300
C LPED.
D10@150 DRAWING NO:SH1-DHI-B0100-C-M01-DST-5707(INCLUDING DEVELOPMENT,
600
600
==
SPLICE,ETC.,)
10.10.SOIL LAYER UNDER LEAN CONCRETE IS COMPACTED SAND K>=0.9.
2265 2265
CROSS TIES
D10@150
HOOP BAR MAIN BAR
D10@150 12-D20
REFERENCE DRAWINGS:-
DRAWING NUMBER DRAWING TITLE
(PL)
145
145
EL.+3.400m 300 EL.+3.400m 400 FGD ABSORBER RECIRCULATION PIPE SUPPORT
SH1-HEG-P1HTD-C-M05-DFN-0008
T.O.C 200 150150 200 T.O.C 125 450 125 STRUCTURE FOUNDATION DETAIL UNIT-1 Battery Limits X
CL PED. ANCHOR BOLT 6NosxM20-545Lg.
545
Z Y
300
150 400 150
CL PED.
(SEE SH1-HEG-P0HTG-C-M05-DFN-XXX)
400
(EL)
400
(EL)
CL PED.
300 300
(SEE SH1-HEG-P0HTG-C-M05-DFN-XXX)
350 350
120
600
700
FICHTNER
V V SHEAR KEY POCKET X X Gmbh & Co.KG
ENGINEERING
300x300x300
SHEAR KEY POCKET VIETNAM OIL AND GAS GROUP FICHTNER GmbH & Co. KG PV ENGINEERING
300x300x300 (PVN)
TOP REINFORCEMENT REINFORCEMENT DETAIL TOP REINFORCEMENT REINFORCEMENT DETAIL VIETNAM MACHINERY
INSTALLATION CORPORATION
TOKYO ELECTRIC POWER SERVICES
COMPANY LIMITED - TEPSCO
FOR PEDESTAL-P6 FOR PEDESTAL-P6 FOR PEDESTAL-P8 FOR PEDESTAL-P8 (LILAMA)
700
700 SONG HAU 1 THERMAL POWER PLANT
700 350 350 2 x 600MW
== 700 350 350
CL PED. 8-D10@150C/C CL PED. ==
CL PED. 8-D16@200C/C CL PED.
CL PED.
CL PED.
350 350
CL PED.
300 300
D10@150 D10@150
700
700
==
600
600
==
CROSS TIES
CROSS TIES
D10@150
D10@150
HAMON
HAMON RESEARCH - COTTRELL GmbH
HAMON
Hamon Research-Cottrell
A0 (1189x841)